2560124
CONDITIONALLaois - Laois County Council
Proposed Development
construct a single storey dwelling, new entrance, wastewater treatment system and percolation area, bored well and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
14 Mar 2025
Further information requested
8 May 2025
Further information received
20 Aug 2025
Decision: CONDITIONAL
15 Sept 2025
Decision due
16 Sept 2025
Grant issued
24 Oct 2025
Application Details
- Location
- Upper Rossmore , Co. Laois
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Laois County Council
- Site Area
- 0.385 ha
- Floor Area
- 84 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 14 March 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 15 September 2025
- Grant Date
- 24 October 2025
- Permission Expires
- 23 October 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to construct a dormer style dwelling, attached single storey open double garage, new entrance, waste water treatment system and percolation area, bored well, and all associated site works
Upper Rossmore , Co. Laois
Construct a dormer style dwelling, attached single storey open double garage, new entrance, waste water treatment system and percolation area, bored well, and all associated site works.
Upper Rossmore , Co. Laois , Co. Laois
construct a dormer style dwelling, attached single storey open double garage, new entrance, waste water treatment system and percolation area, bored well, and all associated site works
Upper Rossmore , Co. Laois
carry out amendments to the consented (but not yet constructed) substation development permitted as part of Laois County Council Planning Reference 20/281 comprising a Revised 38kV Substation and Compound Area including a single storey control building (c5.3m height and c162sqm) and all associated electrical infrastructure and apparatus, New and Upgraded Site Entrance and Access Road and associated ancillary site development works
Rossmore , n/a , Co. Laois
Amend the consented (but not yet constructed) substation development permitted as part of Laois County Council Planning Reference 20/281 comprising a Revised 38kV Substation and Compound Area including a single storey control building (c5.3m height and c162sqm) and all associated electrical infrastructure and apparatus, New and Upgraded Site Entrance and Access Road and associated ancillary site development works.
Rossmore , n/a , Co. Laois
permission for the demolition of an existing single storey dwelling, the construction of a replacement storey and a half type dwelling, a domestic garage, a bored well, a packaged wastewater treatment system and a raised polishing filter, alterations to the existing entrance and all associated site works
Rossmore , Killeshin , Carlow Co. Laois
extend duration of PL 20/478 in regards the construct a storey and a half type dwelling, domestic garage
Rossmore , Killeshin , Co Laois
construction of a two storey dwelling, domestic garage, new entrance, bored well, secondary treatment system & soil polishing filter, and all associated site works
Upper Rossmore , Killeshin , Carlow Co. Laois.
renovate existing dwelling house, including roof alterations and re-roofing of same, permission for change of use of existing out-house to use as living accommodation, permission to construct a single-storey extension link between the outhouse and the existing dwelling, permission to upgrade existing septic tank to a proprietary treatment system with ancillary percolation area. RETENTION PERMISSION to temporarily retain existing mobile home on site, all ancillary site works and services
Skyview , Rossmore Upper , Killeshin
installation of approximately 4.6 kilometers ('km') of underground cables within Carlow County Council ('CCC') boundary and approximately 2.0km within Laois County Council ('LCC') boundary with a voltage of up to 38 kilovolts and associated works, including a new substation with LCC, for the connection of the consented Bilboa Wind Farm (Planning Register References : Carlow County Council 11/154; An Bord Pleanala PL 01.240245) to the national electricity grid; upgrading of an existing forestry track within CCC; construction of two new onsite access track within CCC; re-orientation and increasing in size of a crane hardstanding area within CCC; and road strengthening and widening along an updated turbine delivery route, within LCC, pursuant to the consented Bilboa Wind Farm (Planning Register References: Carlow County Council 11/154; An Bord Pleanala PL 01.240245). The application is accompanied by a Planning Report, Environmental Impact Assessment Report and a Natura Impact Statement
Townlands of Rossmore and Clogrennan , Co. Laois.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?