2560142
REFUSEDMayo - Mayo County Council
Proposed Development
The development will consist of the demolition of the existing public house and residential building and the construction of a proposed new café restaurant including preparation of hot and cold food, a food and beverage retail outlet with dine-in and takeaway services on the ground floor and a two-bed apartment on the first floor, including new shopfront, proposed new roof lights and clerestory glazing to the rear and all associated lighting, signage, drainage and service connections.
View the full application file on the council's planning portal →Application Timeline
Application received
14 Mar 2025
Decision: REFUSED
7 May 2025
Decision due
8 May 2025
Appeal submitted
29 May 2025
Appeal decided: REFUSED
25 Sept 2025
Application Details
- Location
- James Street , Westport , Co Mayo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Mayo County Council
- Site Area
- 0.023 ha
Timeline
- Registration Date
- 14 March 2025
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 7 May 2025
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-322639-25
- Decision
- REFUSED
- Submitted
- 29 May 2025
- Decided
- 25 September 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of the demolition of the existing public house and residential building and the construction of a proposed new café restaurant including preparation of hot and cold food, a food and beverage retail outlet with dine-in and takeaway services on the ground floor and a two-bed apartment on the first floor, including new shopfront, proposed new roof lights and clerestory glazing to the rear and all associated lighting, signage, drainage and service connections.
James Street , Westport , Co Mayo
change of use of existing offices to include: (1) change from offices to private accommodation, facilitating 2 no. residential apartments and (2) further modifications to existing external elevations, including front facade, together with all associated site works
James Street , Westport , Co. Mayo
CARRY OUT ALTERATIONS TO AN EXISTING SHOP AND RESIDENTIAL ACCOMMODATION, TO INCLUDE A NEW PITCHED ROOF AND A PEDESTRIAN ACCESS ONTO JAMES STREET CAR PARK
JAMES STREET , WESTPORT , CO. MAYO
The development will consist of 1) combine two ground floor retail units into a single retail unit 2) the change of use of first floor office into a 1 bed apartment 3) a rear extension providing three, 2 bed apartments and access stairwell 4) new shop front 5) new rear access gate, together with all ancillary site works.
James Street , Westport , Co. Mayo
CONVERT EXISTING ATTIC SPACE INTO MASTER BEDROOM INCLUDING MINOR ALTERATIONS TO EXISTING LAYOUT AND ALL ANCILLARY SITE WORKS
APT. NO. 2 LIME COURT , JAMES STREET , WESTPORT
ALTERATIONS TO THE ENTRANCES OF THE HOTEL RECEPTION, BAR AND RESTAURANT COMBINED WITH ALTERATIONS TO ADJACENT FACADES, ADJUSTED FACADE SIGNAGE, ADJUSTED LIGHTING, ALTERATIONS TO SHAPE/FINISH OF EXTERNAL TERRACE, TOGETHER WITH ALL ASSOCIATED ANCILLARY SITE WORKS
CLEW BAY HOTEL , JAMES STREET , WESTPORT
Planning permission for an array of photovoltaic panels on two southwest/carparking facing pitch roof elevations, inclusive of all ancillary site works and services.
James Street , Westport
New hotel entrance, shop front, ancillary revisions to the hotel facade, together with all ancillary works, lighting and signage
Clew Bay Hotel , James Street , Westport
RETAIN EXTENSION AND MINOR ALTERATIONS TO ORIGINAL FLOOR PLAN LAYOUT PREVIOUSLY GRANTED UNDER PD1839 INCLUDING ALL ANCILLARY SITE WORKS
RETAIL UNIT NO. 3 , LIME COURT , JAMES STREET
Renovate and extend existing 2nd floor/attic space into a two-bedroom apartment including all ancillary site works.
Apt. No. 2 Lime Court , James Street , Westport Co. Mayo
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?