The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2560155

REFUSED

Carlow - Carlow County Council

Proposed Development

a 10 year permission for a Battery Energy Storage system. The proposed development will comprise of the following; A Battery Energy Storage System with associated infrastructure including a new internal access road, approximately 50 metres in length to the permitted Garreenleen Solar Farm (Planning Ref. 22163); An approximately 90 metre 33kV double circuit underground cable grid connection to the permitted Bendinstown 110kV Substation (Planning Ref. ABP–313139), to be installed in an excavated trench including underground ducting; Modular office and welfare buildings; Six steel storage containers and all associated site development and reinstatement works. A Natura Impact Statement (NIS) has been prepared and is included with this planning application.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Jun 2025

  2. Further information requested

    1 Aug 2025

  3. Further information received

    23 Dec 2025

  4. Decision due

    25 Feb 2026

  5. Decision: REFUSED

    25 Feb 2026

  6. Appeal submitted

    24 Mar 2026

Application Details

Location
Within the townlands of Gilbertstown and Bendinstown , Co. Carlow , Ireland
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Carlow County Council
Site Area
3.8 ha

Timeline

Registration Date
9 June 2025
Status
APPEALED
Decision
REFUSED
Decision Date
25 February 2026

An Coimisiún Pleanála Appeal

Appeal Reference
PL-501034-CW-26
Submitted
24 March 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

117m
22199CONDITIONAL15 Jun 2022

to apply for a 10 year permission for the proposed development of an underground electricity interconnector cable. The proposed development of the underground electricity interconnector cable will comprise 1 no. 33kV triple circuit cable of c.92 metres in length which is to be installed in an excavated trench including underground ducting and all associated site development and reinstatement works. The proposed development represents a minor revision to the approved layout of the solar farm previously permitted under Carlow County Council planning reference 20/143 and An Bord Pleanala Reference 307891-20 comprising the laying of underground cabling in the previously permitted grassed field area. The purpose of the proposed development is to facilitate the interconnection from the permitted solar farm to a 110kV substation which is the subject to the application to An Bord Pleanala (Reference VA01.313139) A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.

Bendinstown , Co. Carlow

121m
2560220CONDITIONAL31 Jul 2025

a 5-year permission for temporary development at Bendinstown (townland) in County Carlow. The development will consist of the installation of 3 no. single storey porta cabin units for use as office (2 no.) and storage space (1 no.), 6 no. car parking spaces and all associated site development works. The proposed development will serve the Garreenleen Solar Farm Development (as permitted under Carlow County Council Reference 20/143 / An Bord Pleanála Reference ABP-307891-20). The proposed operational development will be accessed via the L7112 local road via the entrance permitted under An Bord Pleanála Reference ABP-313139-22

Bendinstown , (townland) , Co Carlow

477m
20143REFUSED11 May 2020

A 10 year Planning Permission for a solar farm which will connect to the national grid on lands with a total area of circa 127 hectares, consisting of solar panels on ground mounted frames, 28 No. single storey electrical inverter/transformer stations and associated equipment container, security fencing, satellite communications pole, CCTV, upgrading to existing access tracks and new access tracks, temporary construction compounds, landscaping and all associated ancillary development works. Construction and operational access will be via entrances from the L-7111 and L-7112. The operational lifespan of the solar farm will be 35 years. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.

Garreenleen , Bendinstown Tinnaclash and , Ardbearn

600m
20291CONDITIONAL19 Aug 2020

for a single storey / part storey & half dwelling, septic tank and percolation area, new vehicular entrance, bored well and all associated site works

Ardbearn , Rathoe , Co. Carlow

734m
2034REFUSED6 Feb 2020

for a single storey / part storey & half dwelling, septic tank and percolation area, new vehicular entrance, bored well and all associated site works

Ardbearn , Rathoe , Co. Carlow

861m
1932CONDITIONAL8 Feb 2019

single storey dwelling, domestic garage, septic tank and raised percolation area, new vehicular entrance and all associated site works

Ballynunnery , Rathoe , Co. Carlow

887m
2017CONDITIONAL27 Jan 2020

for a new vehicular entrance, driveway and all associated site works

Ballynunnery , Rathoe , Co Carlow

923m
2660042CONDITIONAL16 Feb 2026

an agricultural entrance & all associated works for access to existing farmyard

Bendinstown , Ballon , Co. Carlow

1.1km
22367N/A24 Oct 2022

the construction of a new 2 storey dwelling house, connected 'Granny flat', double garage, septic tank with percolation area, the reconstruction of existing site entrance and all associated ancillary works

Rathrush , Rathoe , Co. Carlow

1.1km
22418CONDITIONAL6 Dec 2022

the construction of a new two storey dwelling house, connected 'Granny flat', double garage, septic tank with percolation area, the reconstruction of existing site entrance and all associated ancillary works

Rathrush , Rathoe , Co. Carlow