2560157
N/ASligo - Sligo County Council
Proposed Development
1. A new dwelling house. 2. A new car garage. 3. A new sewage treatment plant with a soil polishing filter. 4. Together with all ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
23 Apr 2025
Application withdrawn
4 Jun 2025
Decision due
17 Jun 2025
Application Details
- Location
- Knockbeg West , Collooney , Co. Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.341 ha
- Floor Area
- 244 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 23 April 2025
- Status
- WITHDRAWN
- Decision
- N/A
- Decision Due
- 17 June 2025
- Withdrawn
- 4 June 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
he development will consist of: 1. A new dwelling house, 2. A new car garage, 3. A new sewage treatment plant with soil polishing filter, 4. Together with all ancillary site works.
KNOCKBEG WEST , COLLOONEY , CO SLIGO
to construct a new 1.5 storey dwelling house, a new garage to the side and rear, a new sewage treatment plant with soil polishing filter and soak pit, a new vehicular entrance, and all ancillary site works
Knockbeg West , Collooney , Co. Sligo
Installation of a tertiary treatment system with pumped discharge to an intermittent filter unit and an 80 sq m gravel polishing filter with all associated site works
Knockbeg West , Collooney , Co. Sligo
Proposed Installation Of An Onsite Sewerage Treatment System With Polishing Filter Which Will Replace An Existing Septic Tank System And Which Will Service An Existing Dwelling House
Knockbeg West , Collooney , Sligo
Development consisting of the following (1) permission for retention of sunroom extension constructed to side of dwelling house and rooflights to roof of house which differ from that granted under PL 99/626 (2) permission for retention of position of dwelling house as constructed which differs from that permitted under PL 99/626 (3) permission for retention of 2 additional vehicular entrances constructed to serve site which differ from that permitted under PL 99/626 (4) permission for retention of domestic sheds and outhouses constructed on site which differ from that permitted under PL99/626 with all associated site works
Knockmullin , Collooney , Co. Sligo
development consisting of a replacement septic tank. The development will consist of a replacement septic tank and percolation and all necessary site ancillary site works on this site
Annaghmore Stable Yard , Annaghmore , Collooney
Construction of a single story rear extension, attic accommodation including rear dormer together with upgrade of existing septic tank to proprietary wastewater treatment plant and associated site works. 2) retention of velux rooflight to the front and side
Ballynaboll , Collooney , Sligo
Construction of a single story rear extension, attic accommodation including rear dormer together with upgrade of existing septic tank to proprietary wastewater treatment plant and associated site works. 2) retention of velux rooflight to the front and side
Ballynaboll , Collooney , Sligo
development consisting of the change of use at Annaghmore Stable Yard. The development will consist of a change of use from long lease residential accomodation to short term rental tourist accomodation for the two existing apartments. The Building is on the Record of Protected Structures No. 6. There is a current application PL20/198 in process
Annaghmore Stable Yard , Annaghmore , Collooney
Development consisting of the construction of a dwelling house, garage proprietary effluent treatment unit and soil polishing filter on site, together with all ancillary site works and services
Knockmullin , Collooney , Co Sligo
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count -- build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.
Do I Need Permission?