The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2560166

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

EXTENSION AND MINOR AMENDMENT TO FRONT OF PREMISES AND PERMISSION FOR CHANGE OF USE OF PREMISES TO A 1 BEDROOM APARTMENT AND 2 NO. SHOP UNITS ALONG WITH ALL ASSOCIATED SITE WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Feb 2025

  2. Further information requested

    3 Apr 2025

  3. Further information received

    16 Apr 2025

  4. Decision: CONDITIONAL

    9 May 2025

  5. Decision due

    13 May 2025

  6. Grant issued

    11 Jun 2025

Application Details

Location
ST. JOHNSTON , LIFFORD PO , CO. DONEGAL
Applicant
N/A
Application Type
RETENTION
Planning Authority
Donegal County Council
Site Area
0.58 ha

Timeline

Registration Date
11 February 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 May 2025
Grant Date
11 June 2025
Permission Expires
10 June 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

29m
2350231CONDITIONAL27 Feb 2023

CONSTRUCTION OF A SMALL EXTENSION TO THE REAR OF EXISTING GALA SHOP ALONG WITH ALL ASSOCIATED WORKS

ST. JOHNSTON , LIFFORD PO , CO. DONEGAL

30m
2150903CONDITIONAL12 May 2021

CHANGE OF USE OF A SECTION OF THE CONVENIENCE STORE AREA TO AN OFF LICENSE AREA THAT WILL REQUIRE A LICENSE TO SELL ALCOHOL ON EXISTING SITE KNOWN LOCALLY AS ST. JOHNSTON GALA FILLING STATION & SHOP

GALA FILLING STATION , ST JOHNSTON , LIFFORD PO

93m
2560198CONDITIONAL18 Feb 2025

(1) RETENTION AND COMPLETION OF ALTERATION AND RENOVATION WORKS TO EXISTING DERELICT DWELLING HOUSE INCLUDING ATTIC CONVERSION WORKS TO PROVIDE HABITABLE ROOMS AND (2) DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM AND DEVELOPMENT OF A REPLACEMENT SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS

ST. JOHNSTON , LIFFORD PO , CO. DONEGAL

151m
2461285N/A24 Aug 2024

CONSTRUCTION OF 2 COMMERCIAL BUILDINGS, ONE BUILDING TO THE FRONT OF THE SITE CONSISTING OF 2 RETAIL PREMISES AND ONE SELF CONTAINED APARTMENT, THE 2ND BUILDING IS TO THE REAR TO THE SITE CONSISTING OF 4 NO. OF SELF CONTAINED APARTMENTS AND ALL ANCILLARY WORKS WITH CONNECTION TO ALL EXISTING SERVICES ON SITE

MAIN STREET , ST. JOHNSTON , LIFFORD PO

151m
2351111N/A27 Jul 2023

CONSTRUCTION OF A COMMERCIAL UNIT CONSISTING OF 2 NO. RETAIL UNITS AND 5 NO. SELF CONTAINED APARTMENTS AND ALL ANCILLARY WORKS WITH CONNECTION TO ALL EXISTING SERVICES

MAIN STREET , ST. JOHNSTON , LIFFORD PO

151m
2461333CONDITIONAL2 Sept 2024

CONSTRUCTION OF ONE COMMERCIAL BUILDING, AND ONE RESIDENTIAL BUILDING, THE COMMERCIAL BUILDING IS TO THE FRONT OF THE SITE CONSISTING OF 2 RETAIL PREMISES AND ONE SELF CONTAINED APARTMENT, THE SECOND BUILDING IS A RESIDENTIAL BUILDING TO THE REAR OF SITE CONSISTING OF 4 SELF CONTAINED APARTMENTS AND ALL ANCILLARY WORKS WITH CONNECTION TO ALL EXISTING SERVICES

MAIN STREET , ST JOHNSTON , LIFFORD PO

249m
2562300N/A19 Dec 2025

CONSTRUCTION OF A 2 LANE BOWLING / BATTING PRACTICE AREA

THE CRICKET PITCH , ST. JOHNSTON , LIFFORD PO

249m
2660275N/A24 Feb 2026

ERECTION OF AN INDOOR CRICKET COURT AND BOWLING FACILITIES (FLOOR AREA OF 405 SQM) AND ALL ASSOCIATED SITE WORKS

THE CRICKET PITCH , ST. JOHNSTON , LIFFORD PO

278m
2460575CONDITIONAL24 Apr 2024

DEVELOPMENT OF A NEW SEWERAGE PUMPING STATION, RISING MAIN AND GRAVITY SEWER CONSISTING OF: (A) TYPICAL UNDERGROUND STORAGE CHAMBER/TANK, (B) ABOVE GROUND CONTROL KIOSK, MOTOR CONTROL CENTRE (MCC) KIOSK AND WASH WATER KIOSK, (C) TELEMETRY POLE (MAXIMUM 6M IN HEIGHT), (D) PERIMETER PALADIN FENCING (2.4M IN HEIGHT), (E) ACCESS ROAD (4M WIDE) AND INTERNAL VEHICULAR TURNING AREA, (F) WET WELL CHAMBER (27M³), (G) PASSIVE ACTIVATED CARBON FILTERS OVER THE WET WELL CHAMBER FOR VENTILATION, (H) RISING MAIN (APPROXIMATELY 160M IN LENGTH), (I) INLET SEWER, (J) EMERGENCY STORAGE AND OVERFLOW, INCLUDING A NEW HEADWALL AT ST. JOHNSTON STREAM, (K) INLET, WET WELL, VALVE CHAMBERS, AND METER CHAMBER, (L) LIGHTING AND WELFARE FACILITIES. THE PROPOSED DEVELOPMENT WILL SPAN AN AREA OF APPROXIMATELY 2216M2. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

WESTERN CORNER OF MAIN STREET , ST JOHNSTON , CO. DONEGAL

278m
2460545N/A18 Apr 2024

DEVELOPMENT OF A NEW SEWERAGE PUMPING STATION, RISING MAIN AND GRAVITY SEWER CONSISTING OF: (A) TYPICAL UNDERGROUND STORAGE CHAMBER/TANK, (B) ABOVE GROUND CONTROL KIOSK, MOTOR CONTROL CENTRE (MCC) KIOSK, & WASH WATER KIOSK, (C) TELEMETRY POLE (MAXIMUM 6M IN HEIGHT), (D) PERIMETER PALADIN FENCING (2.4M IN HEIGHT), (E) ACCESS ROAD (4M WIDE) AND INTERNAL VEHICULAR TURNING AREA, (F) WET WELL CHAMBER (27M³), (G) PASSIVE ACTIVATED CARBON FILTERS OVER THE WET WELL CHAMBER FOR VENTILATION, (H) RISING MAIN (APPROXIMATELY 160M IN LENGTH), (I) INLET SEWER, (J) EMERGENCY STORAGE AND OVERFLOW, INCLUDING A NEW HEADWALL AT ST. JOHNSTON STREAM, (K) INLET, WET WELL, VALVE CHAMBERS, AND METER CHAMBER, (L) LIGHTING; AND WELFARE FACILITIES. THE PROPOSED DEVELOPMENT WILL SPAN AN AREA OF APPROXIMATELY 2216M2. THE PLANNING APPLICATION IS ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS).

LAND AT NORTH WESTERN CORNER OF MAIN STREET , BETWEEN MAIN STREET AND JOHNSTON STREAM , ST JOHNSTON

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?