The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2560201

N/A

Clare - Clare County Council

Proposed Development

for the installation of a cattle underpass and all other associated site and ancillary works

View the full application file on the council's planning portal →

Application Details

Location
Lacken , Kilmihil , Co. Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Site Area
0.2 ha

Timeline

Registration Date
18 April 2025
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560439CONDITIONAL15 Jul 2025

for the installation of a cattle underpass and all other associated site and ancillary works

Lacken , Kilmihil , Co. Clare

347m
22770N/A29 Aug 2022

to construct a new dwelling house, entrance, private garage, wastewater management system and all associated works

Ennis Road , Lacken , Kilmihil Co Clare

884m
2583CONDITIONAL25 Mar 2025

for development, the development will consist of renovation and extension of existing farmhouse

Lacken , Kilmihil , Co Clare

1.1km
22504REFUSED7 Jun 2022

to Extend the Appropriate Period of Planning Permission P17/191 to (a) carry out alterations to existing dwelling house and to construct an extension to the east side of this existing dwelling along with new sewage treatment system, new entrance and access road and ancillary works and (b) to construct a new agricultural machinery shed adjacent to the farm yard / rear of the existing dwelling along with ancillary works

Lack East , Knockalough , Kilrush Co Clare

1.1km
17191CONDITIONAL16 Mar 2017

to (a) carry out alterations to existing dwelling house and to construct an extension to the east side of this existing dwelling along with new sewage treatment system, new entrance and access road and ancillary works and (b) to construct a new agricultural machinery shed adjacent to the farm yard / rear of the existing dwelling along with ancillary works

Lack East , Knockalough , Kilrush

1.2km
22788CONDITIONAL5 Sept 2022

of the first floor extension and associated site works

Ennis Road , Kilmilhil , Co Clare

1.3km
221149CONDITIONAL19 Dec 2022

the development will consist of a slatted house c/w ancillary site works

Ennis Road , Kilmihil , Co Clare

1.3km
19815CONDITIONAL24 Oct 2019

for change of design of previously approved P15/443 to adjust the elevations and the layout of the dwelling house with all necessary ancillary works

Kilmihil , Kilrush , Co Clare

1.3km
198006CONDITIONAL9 May 2019

for the following development; a) Construction of 2 no. three-bed, two-storey semi-detached houses on lands adjacent to No. 7 St. Michael's Place; b) 4 No. car parking spaces associated with the proposed houses ; c) hard and soft landscaping areas; d) access area for Irish Water facilities; e) relocation of existing ESB services; f) construction of new boundary walls and fences enclosing the proposed houses; g) Connections to the public sewer and public water main; h) all associated siteworks. In accordance the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) Screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development

St. Michael's Place , Ennis Road , Kilmihil

1.5km
19608UNCONDITIONAL25 Jul 2019

To Extend the Appropriate Period of Planning Permisssion P14-83 to demolish existing building ruins on site and permission to develop a peoples park to include the following: 1) new building consisting of a reception area, gym, meeting room, games room, dressing rooms and shower and toilet facilities; 2) new all weather Astroturf playing pitch; 3) new green park area incorporating adult and junior recreation area. All of the above are to include necessary car parking facilities and all other necessary ancillary services

Main St , Kilmihil , Co Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?