2560233
CONDITIONALClare - Clare County Council
Proposed Development
to RETAIN the existing dwelling as constructed together with rear extension and retention of part use of existing dwelling for short term tourism accommodation and for PERMISSION to construct a garage/fuel shed along with ancillary works
View the full application file on the council's planning portal →Application Timeline
Application received
30 Apr 2025
Decision: CONDITIONAL
23 Jun 2025
Decision due
24 Jun 2025
Grant issued
29 Jul 2025
Application Details
- Location
- Killard , Doonbeg , Co. Clare
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Clare County Council
- Site Area
- 0.254 ha
Timeline
- Registration Date
- 30 April 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 23 June 2025
- Grant Date
- 29 July 2025
- Permission Expires
- 28 July 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to construct a garage/fuel shed along with ancillary works
Killard , Doonbeg , Co Clare
to construct a garage/fuel shed along with ancillary works
Killard , Doonbeg , Co. Clare
of existing dwelling as constructed together with rear extension and retention of part use of existing dwelling for short term tourism accommodation and for permission to construct a garage/fuel shed along with ancillary works
Killard , Doonbeg , Co Clare
to a) Demolish existing rear extension and private garage ; b) Renovate and extend existing dwelling house to include construction of new rear extension, private garage and front porch, and elevational changes; and c) Decommission existing septic tank and provide new wastewater treatment system along with all other associated site works
Killard , Doonbeg , Co. Clare
for development comprising (a) demolition of (i) single storey porch to front, (ii) single storey extension to rear, (iii) 2 no. gables to front, (iv) existing roof structure and 2 no. chimneys, (b) lowering of existing window head and cill to front elevation , creation of new sliding door open to side (north-east) elevation and creation of new window open to rear elevation, (c) construction of (i) new first floor extension over entire existing ground floor, (ii) storey and a half extension to front and (iii) storey and a half extension to rear, (d) construction of new pitched roof structure over entire comprising new gables to all (front, side and rear) elevations, raising of existing ridge height, 5 no. velux to front and 3 no. velux to side (north-east), (e) new on-site waste water treatment system with soil polishing filter and (f) all ancillary site works
Killard , Doonbeg , Kilrush
the development will consist of the addition of a porch to the main entrance at the front of existing dwelling and the addition of a stand-alone garage to the side of existing dwelling and associated ancillary site works
Killard , Doonbeg , Kilrush
for development which will consist of the completion of the construction of partially constructed domestic dwelling and all ancillary site work. The site is within an area of Special Control, designated as a Rural Area under Strong Urban Pressure in the Clare County Development Plan 2017-2023
Killard , Doonbeg , Co Clare
for the following development (a) to construct extensions to the front, side and rear of the existing dwelling house; (b) to make elevational alterations to the existing house; (c) to construct a standalone storage outbuilding ancillary to the dwelling house; (d) to construct a garden room ancillary to the dwelling house; (e) to make alterations to the existing private shed; and (f) all associated site works and services.
Killard , Doonbeg , Co. Clare
for (a) to construct extensions to the front, side and rear of the existing dwelling house; (b) to make elevational alterations to the existing house; (c) to construct a standalone storage outbuilding ancillary to the dwelling house; (d) to construct a garden room ancillary to the dwelling house; (e) to make alterations to the existing private shed; and (f) all associated site works and services.
Killard , Doonbeg , Co. Clare
is sought for an extension to an existing bungalow dwelling at Killard, Doonbeg, Co. Clare, V15KR90, on behalf of Jimmy and Rebecca Kirby of Red Phalarope Investment Holdings Ltd. The proposed works include the demolition of the existing stand-alone garage and removal of the porch, bay window and chimney; raising the roof to accommodate a mezzanine level; provision of a new chimney; and providing an external terrace and stair at this level, including a north-facing dormer. The proposed works include a single-storey block (with roof-lights) to the south, containing 4 no. En-Suite bedrooms; an external terrace; a Guest WC, and a Plant Room. External works include relocation of the driveway entrance on Killard Road, associated landscaping, planters, drainage works and miscellaneous other works
Killard , Doonbeg , Co. Clare V15 KR90
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?