The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2560233

CONDITIONAL

Kildare - Kildare County Council

Proposed Development

for a domestic garage along with all associated site development and facilitating works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Mar 2025

  2. Decision: CONDITIONAL

    28 Apr 2025

  3. Decision due

    1 May 2025

  4. Grant issued

    9 Jun 2025

Application Details

Location
Mullamast , Ballitore , Athy
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kildare County Council
Site Area
0.31 ha

Timeline

Registration Date
7 March 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 April 2025
Grant Date
9 June 2025
Permission Expires
8 June 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

294m
211447CONDITIONAL7 Oct 2021

for the construction of a detached, single-storey dwelling accessed from the existing entrance and avenue to Mullamast House; the provision of landscaping, including boundary treatments; and the provision of all other associated site excavation, infrastructural and site development works above and below ground, including waste water treatment system and percolation area

Mullamast House , Mullamast , Athy Co. Kildare.

677m
181103CONDITIONAL10 Sept 2018

Retention permission for existing rear extension and dormer extension to existing detached house, permission for the construction of a single storey front extension to existing detached house, modifications to internal arrangement of existing detached house and modifications to front facade of existing detached house and all associated site works

1465 Thoran Road , Ballitore , Co. Kildare

686m
181040N/A27 Aug 2018

existing rear extension and dormer extension to existing detached house, permission for the construction of a single storey front extension to existing detached house, modifications to internal arrangement of existing detached house and modifications to front façade of existing detached house and all associated site works

Thoran Road , Ballitore , Co. Kildare

785m
2561033REFUSED9 Sept 2025

for a new dwelling house with attached garage, new site entrance, septic tank treatment system, percolation area and all associated site works

Mullamast , Athy , Co. Kildare.

786m
21859N/A14 Jun 2021

constructing 1 No. creche unit 1 block containing 4 No. ground floor commercial units and 4 No. first floor apartment units, 1 No. detached bin store, and 33 No. dwellings. The dwellings consist of 4 No. 2 storey semi-detached houses and 29 No. 2 storey terraced houses in 7 No. blocks. The development also includes a new recessed vehicular entrance, provision of part road as defined in the KCC Development Plan 2017-2023, connection to existing foul sewer and all associated ancillary site-works

Ballitore , Co. Kildare

791m
2460189CONDITIONAL4 Mar 2024

for constructing 29 dwellings consisting of 8 no. apartments in 2 No. 2-storey blocks, 8 No. terraced houses in 2 No. 2-storey terrace blocks, 10 No. semi-detached 2-storey houses, and 3 No. detached houses. The development also consists of a new recessed vehicular entrance, provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment and mid-terrace units, connection to foul water sewer, new footpath connecting to existing footpath and all associated ancillary site-works

Ballitore , Athy , Co. Kildare

794m
17391CONDITIONAL11 Apr 2017

for the construction of a single storey extension to the side of the existing dwelling and all associated site works

Mullaghmast , Ballitore , Co.Kildare

806m
17350CONDITIONAL3 Apr 2017

the erection of a straw bedded cattle shed with a soiled water tank and working aprons with all associated facilities and site works

Mullamast , Ballitore , Athy

815m
2561216CONDITIONAL25 Oct 2025

constructing a creche and 34 dwellings. The dwellings will consist of 8 no. apartments in 2 No. 2-storey blocks, 22 No. semi-detached 2-storey houses, and 4 No. detached 2-storey houses. The development also consists of a provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment unit, connection to foul water sewer, and all associated ancillary site-works

Ballitore , Co. Kildare

881m
2440N/A1 Feb 2024

Planning permission sought for bungalow, domestic garage, connection to all services, new entrance through existing estate and ancillary works

Fullers Court Road , Ballitore , Co. Kildare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?