2560246
CONDITIONALSligo - Sligo County Council
Proposed Development
Bus Eireann parking yard, Michael Conlon Road (n4) , rathedmond, sligo town, co. sligo. this application relates to a proposed development adjoining the curtilage of protected structures listed as RPS 101SE and 218SE in the record of protected structures. The development will consist of the proposed extension of the existing bus parking yard and the re-development of the existing yard to provide in total 20 no EV charging bays, 20 no parking bays for coaches for 15m long coaches., 40 no bus bays on site in total. provision of 9 no staff car parking spaces, and all associated siteworks. The yard extension is approximately 0.4092 hectares. the proposal will also include 1no 15m x 3.74m free-standing single-storey prefabricated insulated metal clad steel structure 56 square metres comprising of electrical equipment rooms to the western side of the site. We also propose to construct a single storey ESB sub-station together with MV and LV rooms to the western boundary of the site; c43.5 square metres together with various siteworks to include yard lighting, charging pedestal guns, public lighting standards. access will be primarily via the Michael Conlon road. We also seek permission to construct a single storey modular building for staff accommodation c. 96 sq m. New boundary treatment to include new powder coated painted steel palisade fencing to the western and southern boundaries. This proposal also seeks to connect into public mains sewer.
View the full application file on the council's planning portal →Application Timeline
Application received
13 Jun 2025
Further information requested
1 Aug 2025
Further information received
17 Dec 2025
Decision: CONDITIONAL
19 Jan 2026
Decision due
22 Jan 2026
Grant issued
20 Feb 2026
Application Details
- Location
- Bus Eireann Parking , Michael Conlon Road (N4) Rathedmond , Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.409 ha
Timeline
- Registration Date
- 13 June 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 January 2026
- Grant Date
- 20 February 2026
- Permission Expires
- 19 February 2031
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Erecting 792.52m2 or 150.88 kWp of photovoltaic panels on the roof of our Lidl Sligo Store with all associated site works at Lidl Ireland GMBH.
Lidl Sligo Store , Finisklin Road , Sligo Co Sligo
development consisting of change of use of dwelling house for use for short term letting with all associated works
6 Union Place , Sligo
(1) Extension and change of use from existing light industrial (timber storage warehouse) to recreational facility including provision of new changing facilities/toilets, storage room, cleaning store, office reception and 7 internal and 3 external padel ball courts. (2) Replace existing building signage to north elevation and provision of signage to west elevation. (3) Reposition the existing builder's yard entrance, including the installation of a new fence within the existing builder's yard. Provide new car parking and cycle spaces including all associated site works
Brooks Timber & Building Supplies Ltd. , Finisklin Rd Rathedmond , Sligo
The Development will consist of: - (1) Change of use from existing light industrial (timber storage warehouse, 756.77m2) to recreational facility (indoor climbing wall facility) including provision of new changing facilities/toilets, storage room, office, reception, kitchen and servery. (2) Relocate 1 no. existing external door on west elevation and form new entrance doors on north elevation (3) Replace existing building signage to north elevation (4) Reposition the existing builder's yard entrance, including the installation of a new fence within the existing builder’s yard. Provide new car parking spaces including all associated site works.
Brooks Timber & Building Supplies Ltd , Finisklin Rd , Rathedmond Sligo
(1) Change of use from existing light industrial (timber storage warehouse, 756.77m2) to recreational facility (indoor climbing wall facility) including provision of new changing facilities/toilets, storage room, office, reception, kitchen and servery. (2) Relocate 1 no. existing external door on west elevation and form new entrance doors on north elevation (3) Replace existing building signage to north elevation (4) Reposition the existing builder's yard entrance, including the installation of a new fence within the existing builder’s yard. Provide new car parking spaces including all associated site works.
Brooks Timber & Building Supplies Ltd , Finisklin Rd , Rathedmond Sligo
Development consisting of permission to construct two-storey extension to rear comprising kitchen on ground floor & bedroom on first floor and associated site works
No. 27 Lord Edward Street , Sligo
development consisting of construction of two-storey extension to rear comprising kitchen on ground floor and shower room on first floor and associated site works
No. 27 Lord Edwrd Street , Sligo
The development is for alteration, renovation and extension to the existing hostel (Register Reference 46) including Change of Use to a residential housing development comprising of 9 no. single-storey one-bed apartments, 2 no. duplex one bed apartments and 2 no. duplex two-bed apartments (13 apartments in total). The proposal includes partial demolitions (modern outbuildings and sheds) and alterations. New, terraced two-storey and three-storey extensions with pitched roofs are proposed to replace the removed outbuildings. Site renewable energy measures are planned to include the provision of solar panels. New landscaping for amenity areas, pedestrian access with planted privacy buffers; common bike parking and bin storage. The development includes for connections to existing services (including existing mains drainage), temporary construction signage, new building signage, minor relocation of street lighting and all associated ancillary site development works
3 Lyons Terrace , Finsklin Road , Sligo
development consisting of (1) Construct a single-story retail unit, for use as a garden centre, to the northern corner of the existing main 'Brooks' warehouse building with covered horticulture and nursery areas to the rear. (2) Lower boundary wall along Rathedmond Road to the front of the proposed retail unit. (3) Construct a new vehicular entrance onto the Rathemond Road to serve as delievery access to the rear of the new retail unit. (4) Reposition the existing builder's yard entrance and construct a new canopy over the existing security hut serving this entrance, to create additional parking spaces. (5) Install new porch to front entrance of existing retail section at the front of the 'Brooks' main warehouse building. (6) All associated site works
Brooks Timber & Building Supplies Limited , Rathedmond Td , Finisklin Road
Development consisting of the following (a) Change of use of ground floor (52m2) of existing dwelling house at 36 Wolf Tone Street to retail space which will connect with the existing retail shop (Centra) adjacent with all associated site works (b) Change of use of existing first and second floor (total area 52m2) of no 36 Wolfe Tone Street from residential to office and staff areas associated with the retail shop and all associated works at junction of Wolfe Tone Street and Lord Edward Street/Knappagh Road, Sligo. The property is located within Wolfe Tone Street Architectural Conservation Area (ACA)
No 36 Wolfe Tone Street , Sligo
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?