Proposed Development
the construction of a single storey dwelling, new entrance, bored well, secondary treatment system & soil polishing filter and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
17 Oct 2025
Further information requested
5 Dec 2025
Application withdrawn
25 Jun 2026
Application Details
- Location
- Rathbaun , Tullow , Co. Carlow
- Applicant
- N/A
- Application Type
- OUTLINE PERMISSION
- Planning Authority
- Carlow County Council
- Site Area
- 0.3 ha
Timeline
- Registration Date
- 17 October 2025
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 25 June 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Extension of duration on planning permission PL16/275. The erection of a shed for usage as a grain store to the north of the farmyard and all associated ancillary works
Baunogephlure , Grange , Tullow
a ten-year planning permission for a solar energy development with a total site area of 77 hectares comprising (i) photovoltaic solar panels on steel mounting frames; (ii) electrical inverters; (iii) electrical power stations; (iv) underground electrical and communications cabling; (v) containerised battery energy storage facility; (vi) the upgrade of 2 no. disused site entrances, decommissioning of 2 no. existing site entrances and development of 1 no. new site entrance; (vii) on-site access tracks; (viii) a temporary construction compound; (ix) security fencing and security gates; (x) pole-mounted security cameras; and (xi) all associated site and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. The planning application is accompanied by an Environmental Impact Assessment Screening Report and an Appropriate Assessment Screening Report
Lands at Baungephlure and Friarstown , Killerig , Co. Carlow
change of use of an existing shed from an agricultural store, to include the storage of treated biosolids for its future use as fertilizer/soil conditioner as part of existing agricultural operations
Grangeford , Co. Carlow
permission is sought to retain floor slab as constructed and full planning permission is sought for the completion of dwelling house as granted under PL Ref:17/180, full planning permission is sought for the alteration of site boundary as granted under same, all ancillary site works and services
Rathbaun , Tullow , Co.Carlow
the construction of a single storey dwelling, septic tank and percolation area, uograding of existing entrance, connection to services, a domestic garage and all associated site work
Rathbaun , Tullow , Co.Carlow
alterations to previously granted planning application PL. No. 23/60002 to include change of roof type and change to rear elevation, and all associated site works
Pine Grange , Rathbawn , Tullow
the construction of a single storey extension to my existing garage, and all associated site works
Pine Grange , Rathbawn , Tullow Co. Carlow
10-year permission. The development will consist of the construction of (i) a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 91.2ha, (ii) the construction of a 38kV substation building ((6.1m (h) x 20.9 (l) and 7.3 (w)) and associated compound area, a transformer unit (ca. 6m x ca. 3.6m) and associated bund, (iii) 352 number Battery Energy Storage System units comprising 22 modules (ca. 21.9m x ca.5.2m) each with 16 number cabinet units within each module and (iv) all ancillary development including 15 number transformer integrated units (ca. 10.5m x ca.2.7m), 12 number inverter units (ca. 6.0m x ca.2.4m), 7 number CCTV cameras mounted on 4m high poles, a 3m high acoustic barrier, with berm and fencing, perimeter security fencing, site access, site egress and all ancillary works and services. The development will have a 40-year operational lifetime. Permission currently exists for a PV development on ca/65.6ha of the site (Planning Permission Ref No. 21/23) that will be superseded by this application if approved
Grangeford Old and Friarstown , Co. Carlow , R93 PX51
10-year permission. The development will consist of the construction of (i) a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 91.2ha, (ii) the construction of a 38kV substation building ((6.1m (h) x 20.9 (l) and 7.3 (w)) and associated compound area, a transformer unit (ca. 6m x ca. 3.6m) and associated bund, (iii) 352 number Battery Energy Storage System units comprising 22 modules (ca. 21.9m x ca.5.2m) each with 16 number cabinet units within each module and (iv) all ancillary development including 15 number transformer integrated units (ca. 10.5m x ca.2.7m), 12 number inverter units (ca. 6.0m x ca.2.4m), 7 number CCTV cameras mounted on 4m high poles, a 3m high acoustic barrier, with berm and fencing, perimeter security fencing, site access, site egress and all ancillary works and services. The development will have a 40-year operational lifetime. Permission currently exists for a PV development on ca/65.6ha of the site (Planning Permission Ref No. 21/23) that will be superseded by this application if approved
Grangeford Old and Friarstown , County Carlow , Ireland
the construction of a Pig Finishing Unit, Two Meal Bins, Two Water Tanks, Roof Mounted Solar Panels and all associated works
Grangeford , Tullow , Co. Carlow
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.