2560337

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WIND FARM. THE PROPOSED DEVELOPMENT SEEKS A 10-YEAR PERMISSION FOR THE PROPOSED TWO WIND TURBINES AND ALL ASSOCIATED WORKS. THE DEVELOPMENT WILL INCLUDE TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 119.5 METRES; SITE WORKS WILL INCLUDE THE CONSTRUCTION OF WIND TURBINE FOUNDATIONS, TURBINE HARDSTANDINGS AND ASSEMBLY AREAS, TRANSFORMERS AND ASSOCIATED DRAINAGE; TWO EXTENSIONS OF EXISTING ACCESS TRACKS WITHIN THE SITE (OF 21M AND 29M IN LENGTH); INSTALLATION OF UNDERGROUND ELECTRICAL CABLE IN EXISTING ELECTRICAL DUCTS AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE PROPOSED WIND TURBINES WILL CONNECT TO THE EXISTING SUBSTATION AND WILL AVAIL OF THE EXISTING TRACKS AND ENTRANCE. THE PROPOSED DEVELOPMENT WILL HAVE A 30-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Mar 2025

  2. Decision: CONDITIONAL

    1 May 2025

  3. Decision due

    5 May 2025

  4. Grant issued

    4 Jun 2025

Application Details

Location
CROCKAHENNY , LEAMACROSSAN HILL , INISHOWEN
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
8.81 ha

Timeline

Registration Date
11 March 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
1 May 2025
Grant Date
4 June 2025
Permission Expires
3 June 2050

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

115m
2562117CONDITIONAL2 Dec 2025

A 10-YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WINDFARM AND ALL ASSOCIATED WORKS INCLUDING TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 135 METRES; SITE WORKS INCLUDING THE CONSTRUCTION OF WIND TURBINE FOUNDATIONS, TURBINE HARD STANDINGS AND ASSEMBLY AREAS WITH ASSOCIATED DRAINAGE; A PROPOSED 38 KV ELECTRICAL SUBSTATION TO REPLACE THE EXISTING ELECTRICAL SUBSTATION AND CONTINUED USE OF THE EXISTING ELECTRICAL COMPOUND; TWO EXTENSIONS OF EXISTING ACCESS TRACKS WITHIN THE SITE; INSTALLATION OF UNDERGROUND ELECTRICAL CABLE IN EXISTING ELECTRICAL DUCTS AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE PROPOSED WIND TURBINES WILL CONNECT TO THE PROPOSED SUBSTATION AND WILL AVAIL OF THE EXISTING TRACKS AND ENTRANCE. THE PROPOSED DEVELOPMENT WILL HAVE A 30 YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

CROCKAHENNY , LEAMACROSSAN HILL , INISHOWEN

115m
2561856N/A24 Oct 2025

A 10-YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WINDFARM AND ALL ASSOCIATED WORKS INCLUDING TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 135 METRES; SITE WORKS INCLUDING THE CONSTRUCTION OF WIND TURBINE FOUNDATIONS, TURBINE HARD STANDINGS AND ASSEMBLY AREAS WITH ASSOCIATED DRAINAGE; A PROPOSED 38 KV ELECTRICAL SUBSTATION TO REPLACE THE EXISTING ELECTRICAL SUBSTATION AND CONTINUED USE OF THE EXISTING ELECTRICAL COMPOUND; TWO EXTENSIONS OF THE EXISTING ACCESS TRACKS WITHIN THE SITE; INSTALLATION OF UNDERGROUND ELECTRICAL CABLE IN EXISTING ELECTRICAL DUCTS AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE PROPOSED WIND TURBINES WILL CONNECT TO THE PROPOSED SUBSTATION AND WILL AVAIL OF THE EXISTING TRACKS AND ENTRANCE. THE PROPOSED DEVELOPMENT WILL HAVE A 30 YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE 2023/2413)

CROCKAHENNY , LEAMACROSSAN HILL , INISHOWEN LIFFORD PO

753m
2661260CONDITIONAL7 Jul 2026

A PERIOD OF 10 YEARS FOR A LONG DURATION ENERGY STORAGE FACILITY WHICH WILL CONSIST OF THE FOLLOWING ELEMENTS: INSTALLATION AND OPERATION OF 1 NO. ENERGY STORAGE SYSTEM COMPOUND CONTAINING ENERGY STORAGE CONTAINERS, CONNECTED TO THE NATIONAL GRID SYSTEM VIA C. 50M OF UNDERGROUND CABLE TO THE CUSTOMER SUBSTATION, UPGRADES TO THE EXISTING CUSTOMER SUBSTATION, ELECTRICAL TRANSFORMERS AND INVERTER UNITS, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES, CCTV, INTERNAL ACCESS ROADS, ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFESPAN OF THE DEVELOPMENT WILL BE 35 YEARS AND THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C. 0.54 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

CROCKAHENNY , INISHOWEN , CO. DONEGAL

753m
2661220CONDITIONAL1 Jul 2026

A PERIOD OF 10 YEARS FOR THE PROPOSED DEVELOPMENT WHICH WILL CONSIST OF THE FOLLOWING ELEMENTS: INSTALLATION AND OPERATION OF 1 NO. NEW 38KV SUBSTATION, INCLUDING A NEW 38KV BUILDING AND COMPOUND, 38KV ESB LINE BAY, RELOCATION OF THE EXISTING 38KV CABLE MAST, UPGRADES TO THE EXISTING CUSTOMER SUBSTATION AND 38KV LINE, C. 50M OF UNDERGROUND CABLE TO THE CUSTOMER SUBSTATION, ELECTRICAL EQUIPMENT, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES, CCTV, INTERNAL ACCESS ROADS, ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFESPAN OF THE DEVELOPMENT WILL BE 35 YEARS. THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C. 0.54 HECTARES. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

CROCKAHENNY , INISHOWEN , CO. DONEGAL

753m
2660441N/A18 Mar 2026

A 10 YEAR PLANNING PERMISSION FOR A LONG DURATION ENERGY STORAGE FACILITY CONSISTING OF: INSTALLATION AND OPERATION OF 1 NO. BATTERY ENERGY STORAGE SYSTEM COMPOUND CONTAINING BATTERY ENERGY STORAGE CONTAINERS, 1 NO. ELECTRICAL SUBSTATION AND COMPOUND, CONNECTION TO THE NATIONAL GRID SYSTEM VIA 50M OF UNDERGROUND CABLE TO THE ESB CROCKAHENNY 38KV SUBSTATION, ELECTRICAL TRANSFORMERS AND INVERTER UNITS, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES, CCTV, INTERNAL ACCESS ROAD, ASSOCIATED ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFESPAN OF THE DEVELOPMENT WILL BE 35 YEARS AND THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C. 0.54 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

CROCKAHENNY , INISHOWEN , CO. DONEGAL

753m
2660496N/A24 Mar 2026

A 10 YEAR PLANNING PERMISSION FOR A LONG DURATION ENERGY STORAGE FACILITY CONSISTING OF: INSTALLATION AND OPERATION OF 1 NO. BATTERY ENERGY STORAGE SYSTEM COMPOUND CONTAINING BATTERY ENERGY STORAGE CONTAINERS, 1 NO. ELECTRICAL SUBSTATION AND COMPOUND, CONNECTION TO THE NATIONAL GRID SYSTEM VIA 50M OF UNDERGROUND CABLE TO THE ESB CROCKAHENNY 38KV SUBSTATION, ELECTRICAL TRANSFORMERS AND INVERTER UNITS, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES, CCTV, INTERNAL ACCESS ROAD, ASSOCIATED ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFESPAN OF THE DEVELOPMENT WILL BE 35 YEARS AND THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C. 0.54 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

CROCKAHENNY , INISHOWEN , CO. DONEGAL

753m
2660373N/A10 Mar 2026

A 10 YEAR PLANNING PERMISSION WITH A 35 YEAR OPERATIONAL LIFESPAN FOR DEVELOPMENT OF THE FOLLOWING: (1) INSTALLATION AND OPERATION OF 1NO. BATTERY ENERGY STORAGE SYSTEM COMPOUND CONTAINING BATTERY ENERGY STORAGE CONTAINERS, (2) 1NO. ELECTRICAL SUBSTATION AND COMPOUND, (3) CONNECTION TO NATIONAL GRID SYSTEM VIA 50M OF UNDERGROUND CABLE TO THE ESB CROCKAHENNY 38kV SUBSTATION, (4) ELECTRICAL TRANSFORMERS AND INVERTER UNITS, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES AND CCTV, (5) INTERNAL ACCESS ROAD, (6) ASSOCIATED ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

CROCKAHENNY , INISHOWEN , CO. DONEGAL

966m
1950903N/A13 Jun 2019

CONSTRUCTION OF A NEW DWELLING HOUSE TOGETHER WITH INSTALLATION OF AN ONSITE SEPTIC TANK

CROCKAHENNY , ILLIES , BUNCRANA

967m
1951164REFUSED29 Jul 2019

CONSTRUCTION OF A NEW DWELLING HOUSE TOGETHER WITH INSTALLATION OF ONSITE SEPTIC TANK

CROCKAHENNY , ILLIES , BUNCRANA

967m
1951111N/A18 Jul 2019

CONSTRUCTION OF A NEW DWELLING HOUSE TOGETHER WITH INSTALLATION OF AN ONSITE SEPTIC TANK

CROCKAHENNY , ILLIES , BUNCRANA