  1. Application received

    5 Nov 2025

  2. Further information requested

    22 Dec 2025

  3. Further information received

    1 May 2026

  4. Decision: CONDITIONAL

    27 May 2026

  5. Decision due

    28 May 2026

  6. Grant issued

    29 Jun 2026

Application Details

Location
Sli na Ri , Bagenalstown , Co. Carlow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Carlow County Council
Site Area
0.02 ha
Floor Area
100.6 sq m
Residential Units
1

Timeline

Registration Date
5 November 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 May 2026
Grant Date
29 June 2026
Permission Expires
28 June 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

72m
21526CONDITIONAL23 Dec 2021

For the demolition of existing derelict dwelling and the construction of 4 number two storey terraced dwellings with connection to existing on site services with all ancillary site works. This planning application shall include a Natura Impact Statement (NIS).

Sli na Ri , Moneybeg , Bagenalstown

136m
18144N/A20 Apr 2018

For the construction of 19 number two storey dwellings, connection of existing on site services, access road and footpaths with all ancillary site works

Slí na Ri , Moneybeg , Bagenalstown

136m
18181CONDITIONAL8 May 2018

Construction of 19 number two storey dwellings, connection to and completion of existing on site services, access road and footpaths with all ancillary site works. The planning applications shall include a Site Specific Flood Risk Assessment and Natura Impact Statement (NIS)

Sli na Ri , Moneybeg , Bagenalstown

155m
22282CONDITIONAL26 Aug 2022

(1) the phased demolition of existing school buildings, including the phased decommissioning and removal of existing temporary school accommodation units, (2) the phased construction of a new 1- and 2-storey school building, to cater for a total of 750 no. pupils, with a total gross internal floor area of 7,752m2, incorporating 27no. general classrooms and associated support teaching and tech spaces, a special needs unit, a general purpose/dining hall, a library, offices and meeting rooms, and other ancillary accommodation, and to include photovoltaic panels at roof level, (3) the construction of a new, separate sports hall building with a total gross internal floor area of 1097.9m2, incorporating a multi-use hall and associated changing and equipment storage spaces, a fitness suite, a meditation space, general storage spaces, and other ancillary accommodation, (4) the provision of a new grassed sports playing pitch in the western part of the site, 5no. hard surface ball courts to the north of the new school and sports hall buildings, outdoor seating and breakout areas, a special needs unit garden, a tech yard, an external material and bin store (133m2), a new substation and switchroom (24.5m2), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds, hard and soft landscaping with footpaths, public lighting, and all associated boundary treatments, (5) modifications to the existing site entrance arrangements to include a minor realignment of the existing vehicular and pedestrian entrance from the south, and the provision of a new, gated pedestrian access from Eastwood to the north, (6) parking and access arrangements to include modifications to the bus set down areas and to the internal road layout, and parking provision for 87no. cars, inclusive of 5no. disabled spaces and 5no. electric vehicle charge points, 125no. sheltered bicycle stands providing 250no. sheltered bike parking spaces, and 10no. uncovered bicycle stands providing 20no. short stay visitor bike parking spaces, (7) new foul and surface water drainage system works incorporating SUDS measures, attenuation, rainwater harvesting, and all other associated site and development works. A Natura Impact Statement has been prepared in respect of the proposed development

Royal Oak Road , Muine Bheag , Co. Carlow

157m
17253CONDITIONAL25 Aug 2017

Retention Permission for temporary prefabricated building to provide 3 nr classrooms No1. Science Room, No2. Construction Studies Room, No3. Home Economics Room and ancillary site works.

Presentation De La Salle College , Royal Oak Road , Bagenalstown

157m
18222CONDITIONAL8 Jun 2018

the development will consist of the provision of 2 No. prefabricated classroom structures and all ancillary site development works

Royal Oak Road , Bagenalstown , Co. Carlow

157m
17242N/A11 Aug 2017

Temporary prefabricated building to provide 3 Nr classrooms. No1. Science room, No2. Constructions Studies Room, No3. Home Economics Room and ancillary site works.

Royal Oak Road , Bagenalstown , Co.Carlow

169m
21379N/A7 Oct 2021

Demolition of existing derelict dwelling and the construction of 4 number two storey terraced dwellings with connection to existing on site services with all ancillary site works.

Sli na Ri , Moneybeg , Bagnelstown

202m
21203CONDITIONAL3 Jun 2021

Permission for development which will consist of an upgrade to the existing Bagenalstown Wastewater Treatment Plant (WwTP) to facilitate an increased treatment capacity. The proposed development will include (1) minor works to the existing inlet works, sludge dewatering building, Picket Fence Thickener, and administration building & control room; (2) change of use to 1 no. clarifier tank to a storm holding tank and minor works to same, as well as minor works to the existing storm holding tank and minor works to same, as well as minor works to the existing storm holding tank; (3) 1 no. aerobic reactor and 4 no. air blowers; (4) 1 no. flow diversion chamber and minor works to an existing flow diversion chamber; (5) 1 no. ferric sulphate storage tank with integrated bund and 2 no. chemical dosing pumps; (6) 1 no. MLSS distribution chamber (7) 1 no. RAS/WAS Pumping Station and 2 No. (each) RAS/WAS Pumping Station and 2 No. (each) RAS/WAS pumps (8) 2 no. final clarifier tanks; (9) 1 no. final effluent chamber (10) treated effluent flow meter & bypass (11) standby generator and (12) all ancillary works including pipework, pumps, landscaping and all associated site development and site excavation works above and below ground. A Natura Impact Statement will be submitted to the Planning Authority with the application.

Long Range Road , Moneybeg , Bagenalstown

215m
22389CONDITIONAL16 Nov 2022

for demolition of an existing attached single storey utility/boiler house to the rear of my existing dwelling, construction of a new pitched roof over my existing garage, conversion of my attached garage to habitable use, external alterations, construction of a new single storey extension to the front and rear of my existing dwelling, internal alterations and all associated site works

15 Oak Grove , Muine Bheag , Co. Carlow

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?