2560397
CONDITIONALClare - Clare County Council
Proposed Development
to construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
2 Jul 2025
Further information requested
25 Aug 2025
Further information received
23 Sept 2025
Decision: CONDITIONAL
17 Oct 2025
Decision due
20 Oct 2025
Grant issued
19 Nov 2025
Application Details
- Location
- Breaffy North , Miltown Malbay , Co. Clare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Clare County Council
- Site Area
- 0.39 ha
- Floor Area
- 202.5 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 2 July 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 17 October 2025
- Grant Date
- 19 November 2025
- Permission Expires
- 18 November 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to change the use of existing sheds from agricultural to commercial along with associated site works
Breaffy North , Miltown Malbay , Co. Clare
to alter and extend the front boundary wall and site entrance to existing dwelling house
Cloonbony , Miltown Malbay , Co Clare
the development will consist of the installation of an ATM machine to the West elevation and a single door to the South elevation of the existing outbuilding (Garage)
Vaughan's Service Station , Ennistymon Road , Miltown Malbay Co Clare
for change of use from garage/work-shop /fuel store area to deli service/ seating area and new customer toilets and PERMISSION for alterations to the existing shop internal layout, fenestration and elevations of the existing building and PERMISSION to build an extension for new toilets accessible from out-side, new signage and all ancillary and site works
Cloonbony , Miltown Malbay , Co Clare
to extend the detached fuel store and all associated site and ancillary works
Cloonbony , Miltown Malbay , Co Clare
of development at this site. The development consists of a mural on the gable wall of the property
Ennistymon Road , Miltown Malbay , Co. Clare
to demolish a substandard building and to construct a new shed and front boundary wall along with ancillary site works
Ennistymon Rd , Miltown Malbay , Co Clare
to carry out a Flood Alleviation Scheme which works include the following development: a) The upgrade of the existing surfacewater drainage culvert from the stream to the East to Church Street to the open drain to the rear of Church Road and the Crescent housing estates; b) The inclusion of a new surfacewater drainage culvert from the entrance to St. Joseph's Church Car Park to a new outfall into the Cloonbony River; c) An earthen floof protection embankment is also proposed on lands to the East of Church Street; d) For alterations to the existing surfacewater drainage network; e) Alterations to existing boundary walls within the Miltown Malbay Architectural Conservation Area which would materially affect the character of the area concerned and f) All ancillary site works
Church Street , Leagard North Breaffy South , Miltown Malbay
for the construction of a part single storey and part two storey dwelling house, detached domestic garage, forming a new site entrance and driveway to the front of the site, forming a new site entrance to the rear of the site and all ancillary site works
Ennistymon Road , Miltown Malbay , Co. Clare
of 1. The house as built on site. which is a mirror image to that originally granted; 2. The porch to the front of the house; 3. the first floor development including additional windows; 4 The garage on site; 5. Revised site boundaries and site layout & all other associated site and ancillary works
Cloonbony , Miltown Malbay , Co. Clare V95 A0V3
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?