The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2560435

N/A

Kilkenny - Kilkenny County Council

Proposed Development

to retain attic conversion, internal changes and external changes to front, rear and side elevations and all associated site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Jul 2025

  2. Further information requested

    8 Sept 2025

  3. Further information received

    13 Mar 2026

  4. Application withdrawn

    15 Jul 2026

Application Details

Location
Loan , Castlecomer , Co. Kilkenny
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kilkenny County Council
Site Area
0.31 ha

Timeline

Registration Date
18 July 2025
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
15 July 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

62m
2460299CONDITIONAL25 Jun 2024

permission for (a) domestic shed to rear of site as constructed, (b) Extension to rear of existing permitted shed (permitted under P08/647), (c) changed to elevations of permitted dwelling including conversion of attic space to domestic storage and roof lights to the rear elevation, (d) change of roof type to existing permitted domestic garage ( permitted under P05/833) and all associated site works

Loan , Castlecomer , County Kilkenny

200m
22612CONDITIONAL15 Sept 2022

to construct a storey and a half dwelling house, detached garage, wastewater treatment system and polishing filter, new vehicular entrance which will be shared with entrances approved under 16/276 and 20/511, landscaping and all associated site works

Loan , Castlecomer , Co. Kilkenny

262m
22611CONDITIONAL15 Sept 2022

of constructed dwelling, comprising the modification of approved planning reference 20/511, to include retention of as-built dwelling, detached garage and wastewater treatment system and polishing filter in revised location and all associated site works

Loan , Castlecomer , Co. Kilkenny

262m
20511CONDITIONAL7 Aug 2020

to construct a two storey dwelling house, detached garage, wastewater treatment system, percolation area, new vehicular entrance which will be shared with entrance approved under 16/276, landscaping and all associated siteworks.

Loan , Castlecomer , Co. Kilkenny

269m
22230N/A11 Apr 2022

for development at this site. The development will consist of: 1) replacing concrete roof tiles with slate, 2) an additional ensuite added to the existing master bedroom and 3) a family flat extension and all other associated site works

Loon , Castlecomer , Co Kilkenny

532m
23135REFUSED30 May 2023

of Planning Permission Reference P17/865

Loon , Castlecomer , Co Kilkenny

532m
17865CONDITIONAL22 Dec 2017

to demolish existing dwelling house leaving the utility room portion intact and decommissioning existing septic tank and constructing a replacement two storey dwelling house incorporating the existing utility room, installing a proprietary wastewater treatment system and raised sand polishing filter and all necessary and associated site works

Loon , Castlecomer , Co. Kilkenny

771m
20908UNCONDITIONAL22 Dec 2020

Ext of Duration: Re Planning File: 16276

Loan , Castlecomer , Co. Kilkenny

791m
2079N/A13 Feb 2020

for ten-year permission for development. The development will consist of the provision of a temporary prefabricated welfare unit on the site of Loon Water Treatment Plant, including associated site works

Loon Water Treatment Plant , Loan , Co Kilkenny

791m
20159CONDITIONAL13 Mar 2020

for ten-year permission for development. The development will consist of the provision of a temporary prefabricated welfare unit on the site of Loon Water Treatment Plant, including associated site works

Loon Water Treatment Plant , Loan , Co Kilkenny

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?