the retention of: a rock splitter and associated ancillary canopy covering an area of c. 120.1sqm with a maximum height of c. 7.2m and associated single storey cabin/site office measuring c. 4.7sqm in area; aggregate washing plant with a maximum height of c. 10.7m; welding shed measuring c. 190.2sqm in area with a maximum height of c. 8.4m; and Electricity Supply Board substation measuring c. 13.5sqm in area with a maximum height of c. 3.2m. Retention is also sought for all associated ancillary site development works, including site levelling, lighting, cabling and ducting

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Dec 2025

  2. Decision due

    25 Feb 2026

  3. Decision: CONDITIONAL

    25 Feb 2026

  4. Appeal submitted

    5 Mar 2026

  5. Appeal decided: CONDITIONAL

    22 Jul 2026

Application Details

Location
Powerstown , Milford , Co. Carlow
Applicant
N/A
Application Type
RETENTION
Planning Authority
Carlow County Council
Site Area
0.7 ha

Timeline

Registration Date
23 December 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 February 2026
Permission Expires
21 July 2031

An Coimisiún Pleanála Appeal

Appeal Reference
PL-500902-CW-26
Decision
CONDITIONAL
Submitted
5 March 2026
Decided
22 July 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

313m
2660212N/A10 Jul 2026

the construction of portal frame curing shed for pre-cast concrete products and associated site works

Powerstown , Milford , Co. Carlow

433m
22425REFUSED12 Dec 2022

the construction of a bungalow style dwelling, on site wastewater system, bored well, access from existing private lane and all associated site development works

Powerstown , Milford , Co. Carlow

489m
2152CONDITIONAL19 Feb 2021

Permission for the conversion of existing outbuilding to rear of dwelling for habitable use, including renovations and raised ridge height. Permission is also sought for the construction of a single storey annex link from dwelling to converted outbuildings, upgrade the on-site wastewater treatment system and all associated ancillary works

Powerstown , Milford , Carlow

634m
2327N/A7 Feb 2023

permission for recovery activities - the infilling, as a soil recovery facility , of a 4.68 hectare area with uncontained soil and stone, for agricultural improvement purposes; - crushing and recovery of selected construction and demolition wastes on a 0.28 hectares area, and all associated site works and services required to facilitate the development

Mary Kelly's Pit , Powerstown , Milford

638m
23174N/A24 Oct 2023

recovery activities, over a total area of 4.84-hectares comprising: a) The infilling of lands as a soil recovery facility with inert waste consisting of suitable uncontaminated soil & stone and dredging spoil, to improve land for agricultural use (i.e., 4.792-hectare area, total net import of 199,500 tonnes over 8 years), b) Administration Area, in a 0.048-hectare area, to include a site hut/site office and portable chemical toilet, and c) All other associated site works and services required to facilitate the development

Mary Kelly's Pit , in the townland of Powerstown , Milford

638m
2372N/A19 Apr 2023

recovery activities, over a total area of 4.84-hectares, comprising: - The infilling, as a soil recovery facility, of a 4.66-hectare area with uncontaminated soil and stone, for agricultural improvement purposes; - Crushing and recovery of selected construction and demolition wastes on a 0.18-hectare area; and - All associated site works and services required to facilitate the development

Mary Kelly's Pit , Powerstown , Milford

638m
2360263CONDITIONAL14 Nov 2023

Change of use from quarry to recovery activities, over a total area of 4.84-hectares, comprising: -The infilling of lands as a soil recovery facility with inert waste consisting of suitable uncontaminated soil & stone and dredging spoil, to improve land for agricultural use (i.e., 4.792-hectare area, total net import of 199,500 tonnes over 8 years); -An Administration Area (i.e., 0.048-hectare area), to include a site hut/site office and portable chemical toilet; and -All associated site works and services required to facilitate the development. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted with the application

Mary Kelly’s Pit , Powerstown , Milford Co. Carlow

924m
19328CONDITIONAL23 Aug 2019

of a partially complete domestic shed as built. Planning permission for the completion of same shed and for all other associated ancillary site development works

Garryhundon , Milford , Co. Carlow

1.0km
20192CONDITIONAL18 Jun 2020

the temporary placement of a mobile home on site for the duration of the construction of dwelling house as granted under PL Ref. 19/491 and temporarily connect to services as granted under same, all ancillary site works at services

Garryhundon , Milford , Co. Carlow

1.0km
19491CONDITIONAL19 Dec 2019

to construct a dormer style dwelling house, garage, septic tank and associated percolation area, bored well, new site entrance, all ancillary site works and services

Garryhundon , Milford , Co. Carlow

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?