2560470
CONDITIONALMeath - Meath County Council
Proposed Development
1. Retention permission for extended section to my existing shed located to rear of my dwelling house along with any other ancillary site works attached.
View the full application file on the council's planning portal →Application Timeline
Application received
10 May 2025
Decision due
4 Jul 2025
Decision: CONDITIONAL
4 Jul 2025
Grant issued
13 Aug 2025
Application Details
- Location
- 7 The Crescent Inse Bay , Laytown , Co. Meath
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Meath County Council
- Site Area
- 0.046 ha
- Floor Area
- 5.6 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 10 May 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 4 July 2025
- Grant Date
- 13 August 2025
- Permission Expires
- 12 August 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
1. Retention permission for existing shed to rear of dwelling. 2. Retention of existing extension to the side and rear of the existing dwelling, 3. Permission to construct a new projecting porch which includes extension of ground floor bedroom along with any other ancillary site works attached to the front elevation.
7 The Crescent , Laytown , Co. Meath
1. Retention permission for existing shed to rear of dwelling. 2. Retention of existing extension to the side and rear of the existing dwelling, 3. Permission to construct a new projecting porch which includes extension of ground floor bedroom along with any other ancillary site works attached to the front elevation.
7 The Crescent , Laytown , Co. Meath
1. Retention permission for existing shed to rear of dwelling. 2. Retention of existing extension to the side and rear of the existing dwelling, 3. Permission to construct a new projecting porch which includes extension of ground floor bedroom along with any other ancillary site works attached to the front elevation.
7 The Crescent , Laytown , Co. Meath
1. Retention permission for existing shed to rear of dwelling. 2. Retention of existing extension to the side and rear of the existing dwelling, 3. Permission to construct a new projecting porch which includes extension of ground floor bedroom along with any other ancillary site works attached to the front elevation.
7 The Crescent , Laytown , Co. Meath
construction of a two storey extension with internal alterations to accommodate same at the rear of
No.12 The Crescent , Inse Bay , Laytown Co. Meath
a single storey pitched roof extension with 2 no. rooflights to the side and rear of an existing two storey semi-detached dwelling and associated site works
26 The Crescent , Inse Bay , Laytown Co. Meath
a single storey pitched roof extension with 2 no. rooflights to the side and rear of an existing two storey semi-detached dwelling and associated site works
26 The Crescent , Inse Bay , Laytown Co. Meath
planning permission for retention and continuation of development previously granted under planning permission LB170386 for childcare facility. The development consists of a portacabin erected to the south of existing creche providing one classroom with toilets and ancillary accommodation
2 The Walk , Inse Bay , Laytown Co. Meath
the retention and continuation of use of development previously granted under planning permission LB170386 for childcare facility. The development consists of a portacabin erected to the south of existing creche providing one classroom with toilets and ancillary accommodation
2 The Walk , Inse Bay , Laytown Co. Meath
the retention and continuation of use of development previously granted under planning permission LB170386 for childcare facility. The development consists of a portacabin erected to the south of existing creche providing one classroom with toilets and ancillary accommodation
2 The Walk , Inse Bay , Laytown Co. Meath
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?