Application Timeline

  1. Application received

    27 May 2025

  2. Decision: CONDITIONAL

    17 Jul 2025

  3. Decision due

    21 Jul 2025

  4. Grant issued

    20 Aug 2025

Application Details

Location
Garden Grove , Cahir , Co. Tipperary
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
0.28 ha
Floor Area
280.5 sq m
Residential Units
1

Timeline

Registration Date
27 May 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 July 2025
Grant Date
20 August 2025
Permission Expires
19 August 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

40m
2560647REFUSED7 Jul 2025

a dwelling, garage, effluent treatment system and entrance

Garden Grove , Cahir , Co. Tipperary

40m
2560950CONDITIONAL23 Sept 2025

dwelling, garage, effluent treatment system and entrance

Garden Grove , Cahir , Co. Tipperary

236m
18600861UNCONDITIONAL6 Jul 2018

dwelling, garage, effluent treatment system & entrance

Townparks , Cahir , Co. Tipperary

279m
17600729CONDITIONAL28 Jun 2017

as constructed all weather pitch which differs in configuration and boundary detail from that granted under planning reference number 15600698 and all associated site works

Townspark , Cahir , Co.Tipperary

302m
17600406N/A19 Apr 2017

the as constructed all weather pitch which differs in configuration and boundary detail from that granted under planning reference number 15600698 and all associated site works

Townspark , Cahir , Co.Tipperary

400m
21402CONDITIONAL29 Mar 2021

the proposed development will consist of the upgrade of the existing wastewater treatment plant to increase the treatment capacity, comprising of: the construction of 1 no. partially below ground screened storm overflow chamber; the decommissioning of the existing inlet works and the construction of a new above ground inlet screening works area; the construction of 1 no. partially below ground storm overflow weir chamber and 1 no. partially below ground stormwater overflow flume; 1 no. partially below ground splitter chamber and 1 no partially below ground clarifier tank; and ancillary development including associated underground chambers, cabling and piping and all associated site development works. A Natura Impact Statement has been prepared in respect of this planning application

Cahir Wastewater Treatment Plant , Carrigeen , Cahir

420m
18600986CONDITIONAL8 Aug 2018

(i) all weather surface, (ii) weld mesh fencing, (iii) hurling wall, (iv) lighting, (v) and all associated site development works

Chapel Street , Townpark , Cahir

479m
2461071CONDITIONAL10 Dec 2024

to create a burial ground and all associated site works

Saint Mary's Church , Townsparks , Cahir

486m
19601140N/A15 Oct 2019

install metal guard railings to the existing retaining wall facing west towards St. Mary's Road at Protected Structure RPS Ref S240

St. Mary's Catholic Church , St. Mary's Road , Townparks Cahir

498m
19601293CONDITIONAL20 Nov 2019

installation of metal guard railings to the existing retaining wall facing west towards St. Mary's Road at Protected Structure RPS Ref S240

St. Mary's Catholic Church , St. Mary's Road , Townparks Cahir

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?