to retain partially constructed extension to the rear of house and permission for to complete partially constructed extension to the rear of house and to construct a garage attached to the gable end of house and construct a dormer window to the rear of house and alter size of existing rear kitchen window and all associated site works

View the full application file on the council's planning portal →

Application Details

Location
1 Derg Marine Village , Ballina , Co. Tipperary
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
0.056 ha

Timeline

Registration Date
1 June 2025
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
2560554CONDITIONAL14 Jun 2025

partially constructed extension to the rear of the house, permission for completion of partially constructed extension to the rear of the house and to construct a garage attached to the gable end of the house, a dormer window to the rear of the house and alter size of existing rear kitchen window and all associated site works

1 Derg Marine Village , Ballina , Co. Tipperary

3m
2560459N/A22 May 2025

retaining and completion of partially constructed extension to the rear of house and for PERMISSION to construct a garage attached to the gable end of house and construct a dormer window to the rear of house and alter size of existing rear kitchen window and all associated site works

1 Derg Marine Village , Ballina , Co. Tipperary

19m
2260514CONDITIONAL26 Sept 2022

installation of dormer window/door, rooflights, conversion of attic space to habitable accommodation, together with all associated site and incidental works

2 Marine Village , Ballina , Tipperary

24m
2560843CONDITIONAL28 Aug 2025

the removal of two existing roof lights to the rear of the dwelling at first floor level and the installation of a new dormer window in their place, together with all ancillary site works

2 Lakeside Cottages , Cullenagh Ballina , Co. Tipperary

40m
18600322CONDITIONAL15 Mar 2018

demolition of an existing building (toilets, shop and office) and permission to complete the re-construction of a new replacement structure (toilets, shop and office) and all associated site works

Derg Marina , Ballina , Co Tipperary

56m
2360223CONDITIONAL6 Apr 2023

a first-floor extension to the house to include a new raised roof with velux windows to the front and dormer gables to the rear accommodating two bedrooms, a bathroom, study and attic storage

4 Marine Village , Ballina , Co. Tipperary

58m
18600218CONDITIONAL23 Feb 2018

to renovate and extend existing dwelling along with all ancillary site works

33 Marine Village , Ballina , Co. Tipperary

68m
19601021CONDITIONAL17 Sept 2019

replacement of old sub-standard lighting system at the site, along with the addition of a number of new lamp standards and led lighting, including low level bollard lighting and under deck access safety lighting

Lough Derg Marina , Ballina

84m
21537N/A21 Apr 2021

construction of a one and a half storey dwelling house, entrance and all other ancillary site works

Lakeside Drive , Cullenagh , Ballina Co. Tipperary

118m
17600574CONDITIONAL23 May 2017

(i) Planning permission is sought for modifications to the existing ground floor window on the northern elevation. (ii) retention permission is sought for (a) a reduction in the height of the eaves overhang to the front (eastern) elevation; (b) retention and completion of modifications to the permitted window arrangement at ground floor level on the southern and western elevations; and (c) retention and completion of the provision of a new doorway on the southern elevation

38 Marine Village , Ballina , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?