2560550
N/ATipperary - Tipperary County Council
Proposed Development
the proposed development which will consist of the following on a site with a total area of c.3.13ha: - 96 no. (semi-detached, detached, and terraced) houses comprising 7 no. 2-bed houses, 53 no. 3-bed houses and 36 no. 4-bed houses; - A two-storey childcare facility with a total gross floor area of c. 369 sq.m and an associated outdoor play area of c. 257 sq.m; - The provision of public open space comprising 3 no. spaces including play equipment, and the provision of private open space for the proposed houses; - A total of 206 no. car parking spaces comprising 185. no. residential spaces, 8. no. visitor spaces, 6 no. creche staff parking spaces and 7 no. creche drop off spaces; - Vehicular site access to the northeast of the site to the north of the existing residential area of Gort na Manach, and a pedestrian connectivity link along the eastern boundary to the existing residential area of Gort na Manach. Provision for 2 no. potential future access links on the southeastern and western boundaries. - The proposed development also includes all associated landscaping and planting, boundary treatments, road and cycle infrastructure, bicycle parking for residents, visitors, and the childcare facility, scooter parking, EV parking and ducting, public lighting, drainage works, SuDS features and all associated and ancillary site development works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the NIS will be available for inspection or purchase for a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority.
View the full application file on the council's planning portal →Application Details
- Location
- Abbey Farm in the townlands of Inishlounaght and Ballingarrane South , to the south of Cahir Road (R707) and to the west of the Gort Na Manach estate , Clonmel
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 3.13 ha
Timeline
- Registration Date
- 13 June 2025
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development which will consist of the following on a site with a total area of c.3.13ha: a) 96 no. (semi-detached, detached, and terraced) houses comprising 7 no. 2-bed houses, 53 no. 3-bed houses and 36 no. 4-bed houses; b) a two-storey childcare facility with a total gross floor area of c. 369 sq.m and an associated outdoor play area of c. 257 sq.m; c) the provision of public open space comprising 3 no. spaces including play equipment, and the provision of private open space for the proposed houses; d) a total of 206 no. car parking spaces comprising 185. no. residential spaces, 8. no. visitor spaces, 6 no. creche staff parking spaces and 7 no. creche drop off spaces; e) vehicular site access to the northeast of the site to the north of the existing residential area of Gort na Manach, and a pedestrian connectivity link along the eastern boundary to the existing residential area of Gort na Manach. Provision for 2 no. potential future access links on the southeastern and western boundaries; f) the proposed development also includes all associated landscaping and planting, boundary treatments, road and cycle infrastructure, bicycle parking for residents, visitors, and the childcare facility, scooter parking, EV parking and ducting, public lighting, drainage works, SuDS features and all associated and ancillary site development works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application
Abbey Farm in the townlands of Inishlounaght and Ballingarrane South , to the south of Cahir Road (R707) and to the west of the Gort Na Manach estate , Clonmel
construction of 74 no. residential units and all associated ancillary development works including connection to all public services, vehicular and pedestrian access, parking, footpaths, drainage, landscaping and amenity areas
Abbey Farm Inishlounaght and Ballingarrane South , Cahir Road , Clonmel
domestic shed and pergola at the rear of property
20 Gort na Manach , Cahir Road Clonmel , Co. Tipperary
(a) 2 No. single storey extensions to the rear of the house (dining room extension with a stove and external flue & a utility room extension and toilet) ; (b) 2 No. Free-Standing sheds (one to the side of the dining room extension and one in the north west corner of the back garden)
No. 6 Gort na Manach , Cahir Road , Clonmel
to convert and extend the existing garage to living accommodation and to provide a 2 no bedroom extension over converted garage
21 Gort Na Manach , Clonmel , Co. Tipperary
a family entertainment centre auxiliary to the existing hotel including all external signage, the installation of photovoltaic panels on the roof structure
Poppyfield Retail Park , Ballingarrane South , Clonmel
an Electric Vehicle (EV) Charging Station on a site of ca. 0.017ha, consisting of 4 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 8 no. charging points. The charging bays will be located in the existing car park replacing 10 no. standard parking bays with 8 no. EV charging bays. It is proposed to erect an ancillary building to house an ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works
Poppyfield Retail Park , Cahir Rd Ballingarrane , Clonmel Co. Tipperary
the construction of an extension to the existing agricultural storage shed and all associated site development works
Abbey Farm , Inishlounaght , Clonmel
(a) retention of a concrete floor and rising walls, and (b) Permission to construct an agricultural storage shed over same and all associated site development works
Abbeyfarm , Inishlounaght , Marlfield Clonmel
an Electric Vehicle (EV) Charging Station, a site of ca. 0.017ha. The development will consist of 4 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 8 no. charging points. The charging bays will be located in the existing car park replacing 10 no. standard parking bays with 8 no. EV charging bays. It is proposed to erect an ancillary building to house an ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works
Poppyfield Retail Park , Cahir Rd Ballingarrane , Clonmel Co. Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?