The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2560579

N/A

Cavan - Cavan County Council

Proposed Development

to erect fully serviced detached single storey dwelling, new entrance, new waste water treatment system and all ancillary works at Cronery, Corlough, Belturbet, Co. Cavan.

View the full application file on the council's planning portal →

Application Details

Location
Cronery , Corlough , Belturbet Co. Cavan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Site Area
0.35 ha

Timeline

Registration Date
26 September 2025
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560601CONDITIONAL8 Oct 2025

to erect fully serviced detached single storey dwelling, new entrance, new waste water treatment system and all ancillary works

Cronery , Corlough , Belturbet Co. Cavan

39m
21539CONDITIONAL25 Aug 2021

for a storey and a half dwelling, detached domestic garage, new entrance walls and piers, effluent treatment system, percolation area and associated site works. Significant further information and revised plans have been submitted.

Cronery , Corlough , Co. Cavan

234m
19223CONDITIONAL11 Jun 2019

to retain 6 bay slatted shed with calving pens, feeding passage, underground tank, retaining wall, concrete aprons on to existing hayshed, byre and yard and PLANNING PERMISSION to extend animal housing facilities by the construction of the following: 1) A lean to shed with underground tank to the rear of existing hayshed, 2) a one bay lean to roof to the front of existing hayshed and 3) a free standing storage shed all to connect to existing associated farmyard services

Cronery Td Corlough , Belturbet P.O. , Co. Cavan

234m
20393CONDITIONAL8 Sept 2020

extend existing farmyard facilities with the construction of a free standing storage shed for farm machinery and dry goods and connect to existing associated farmyard services

Cronery Td , Corlough , Belturbet PO

244m
21541CONDITIONAL1 Sept 2021

construct storey and a half dwelling, detached domestic garage, new entrance walls and piers, effluent treatment system, percolation area and associated site works. Significant further information and revised plans have been submitted.

Cronery , Corlough , Co Cavan

1.0km
20430CONDITIONAL30 Sept 2020

is sought for 4 no. high level floodlights, low level bollard lighting and walking track to northside of existing playfield together with PERMISSION to erect advertising signage along north boundary and associated site works

Corratillion , Corlough Belturbet , Co. Cavan

1.0km
2366CONDITIONAL27 Feb 2023

for a fully serviced dwelling with attic accommodation and detached domestic garage to rear, sewage treatment unit, percolation area, entrance walls & piers, together with all associated works

Corratillan , Corlough , Belturbet

1.1km
2560285CONDITIONAL6 Jun 2025

for single storey portal frame building incorporating gym and toilet facilities, connection to existing services and associated site works

Corratillion , Corlough , Co. Cavan

1.3km
1955CONDITIONAL1 Mar 2019

to remove old dwelling, construct replacement two storey dwelling, replace existing septic tank with sewerage treatment system and percolation area, erect garage (domestic), upgrade existing entrance and connect to all existing associated services

Cartronnagilta Td , Corlough Belturbet P.O , Co. Cavan

1.4km
2560626CONDITIONAL20 Oct 2025

for the construction of a two storey type dwelling house to replace current derelict house on site, change of use of existing dwelling house to shed, temporary placement of mobile home on site for the duration of the build, new entrance, boundary walls, piers and fencing, decommissioning of existing septic tank, proprietary wastewater treatment unit and percolation area and all ancillary site works

Knockmore , Corlough , Belturbet

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?