The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2560582

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

construction of a first-floor extension over the existing single-storey rear annex of our dwelling, make minor modifications to existing dwelling and all associated site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Jun 2025

  2. Decision: CONDITIONAL

    8 Aug 2025

  3. Decision due

    13 Aug 2025

  4. Grant issued

    11 Sept 2025

Application Details

Location
22 Abbey Meadows , Clonmel , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.05 ha

Timeline

Registration Date
19 June 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 August 2025
Grant Date
11 September 2025
Permission Expires
10 September 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

86m
2560975CONDITIONAL1 Oct 2025

the side conservatory and closing in of the front porch including all associated site development works

12 Abbey Meadows , Clonmel , Co. Tipperary

87m
25196N/A17 Sept 2025

a conservatory to the left hand side of the house

12 Abbey Meadows , Clonmel , Co. Tipperary

108m
2660412N/A7 May 2026

the construction of a residential housing estate to the rear of Gort Na Manach, Cahir Road, Inishlounaght T/D, Clonmel, Co. Tipperary. The works are summarized as – 1. Construction of a 55-unit residential estate, 2. The development will include: a. 10 no. semi-detached 4-bedroom 2-storey houses, b. 32 no. semi-detached 3-bedroom 2-storey houses, c. 1 no. detached 2-bedroom single storey house, d. 2 No. 2- storey terraced blocks, containing 4 No. 2- bedroom mid terrace townhouses and 4 No. end terrace 3- bedroom townhouses. e. 1 no. 2-storey maisonette apartment block containing 4 own door access 2-bedroom apartments. 3. The site is accessed via Gort Na Manach housing scheme and the Poppyfield Roundabout. 4. Connection to infrastructure works, adjoining foul sewers, water mains and all utilities- permitted under planning references, 05-43, 07-107, 05550043, 07550107, 17601211 & 19600097 5. The adjustment of site levels, site boundary treatments, open spaces, landscaping and all associated site development works

to the rear of Gort Na Manach Cahir Road , Inishlounaght T/D Clonmel , Co. Tipperary.

114m
21521CONDITIONAL19 Apr 2021

proposed extension to an existing dwelling, the development consists of the following: extension to front including new entrance porch, extension to rear at first floor level and all necessary site works

Inis na Managh , Marlfield Road , Clonmel

126m
2660315N/A13 Apr 2026

the construction of a residential housing estate. The works are summarized as, 1. Construction of a 55-unit residential estate. 2. The development will include, a.10 no. semi-detached 4-bedroom 2-storey houses, b. 32 no. semi-detached 3-bedroom 2-storey houses, c. 1 no. detached 2-bedroom single storey house, d. 2 No. 2- storey terraced blocks, containing 4 No. 2- bedroom mid terrace townhouses and 4 No. end terrace 3-bedroom townhouses. e. 1 no. 2-storey maisonette apartment block containing 4 own door access 2-bedroom apartments. 3. The site is accessed via Gort Na Manach housing scheme and the Poppyfield Roundabout. 4. Connection to infrastructure works, adjoining foul sewers, water mains and all utilities permitted under planning references, 05-43, 07-107, 05550043, 07550107, 17601211 & 19600097 5. The adjustment of site levels, site boundary treatments, open spaces, landscaping and all associated site development works. 6. An Environmental Impact Assessment Screening Report and an Appropriate Assessment Screening Report have been submitted with the application

to the rear of Gort Na Manach Abbey Farm , Cahir Road , Clonmel

132m
2660539N/A3 Jun 2026

the construction of a residential housing estate. The development will consist of the construction of a 55-unit residential estate, comprising: 10 no. semi-detached 4-bedroom 2-storey houses; 32 no. semi-detached 3-bedroom 2-storey houses; 1 no. detached 2-bedroom single-storey house; 2 no. 2- storey terraced blocks containing 4 No. 2-bedroom mid terrace townhouses and 4 no. end of terrace 3-bedroom townhouses; and 1 no. 2-storey maisonette apartment block containing 4 no. 2-bedroom apartments. Other works as part of the development will include: (a) connection to infrastructure works, adjoining foul sewers, water mains and all utilities permitted under planning references, 05-43, 07-107, 05550043, 07550107, 17601211 & 19600097, and (b) the adjustment of site levels, site boundary treatments, open spaces, landscaping and all associated site development works. The site is accessed via Gort Na Manach housing scheme and the Poppyfield Roundabout

Gort Na Manach Abbey Farm , Cahir Road Inishlounaght T/D , Clonmel

138m
19600097CONDITIONAL7 Feb 2019

completion of infrastructural work commenced under previous Permissions Nos. 05/43 and 07/107 and to construct 22 no. two-storey houses complete with external works and site development works, on their site. The development will include 10 no. detached 4-bedroom houses; 8 no. semi-detached 4-bedroom houses and 4 no. semi-detached 3-bedroom houses and will represent completion of the final phase of Gort na Manach

Gort na Manach , Cahir Road Inishlounaght , Clonmel

141m
17601211REFUSED3 Nov 2017

to alter the layout and proposed house types on part of the site and to incorporate the total number of houses from 72 to 74, existing planning permission ref. no. 05/43. The proposed changes are to the Cul-de-Sac at the southern end of the site and will include the following: omit 9 No. Houses Nos. 53 - 60 inclusive and No. 72 (4 No. 3 bedroom single storey houses Type 53b) and 5 no. 4 bedroom dromer type house Type 54Dr/54DRH) Re Number Houses Nos. 61-71 inclusive as Nos 62-72, Add back 11 No. Houses to be numbered 53 - 61 inclusive and Nos. 73-74 (4 No 2 storey Semi Detached 3 Bedroom House Type 3TA1 / 3TA1H) 5 No. 2 storey detached 4 bedroom house type 54C1 / 54C1H, 2 no. 2 storey detached 5 bedroom House Type 55C1/55C1H) Changes to external works and to site development works will also be included under clause B 42 (1A)(a)(V)

Gort na Managh , Abbey Farm , Cahir Road

149m
2257CONDITIONAL24 Jan 2022

construction of a single storey extension to the rear (south) of existing dwelling house, conversion of garage to living space including modifications to front and rear elevations, new velux window to east side roof and all associated site development works

4 Abbey Meadows , Cahir Road , Clonmel

165m
21728CONDITIONAL21 May 2021

as constructed rear extension, timber shed and playhouse including all associated site development works

40 Gort na Manach , Cahir Road , Clonmel

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?