2560641
CONDITIONALOffaly - Offaly County Council
Proposed Development
an existing single storey extension to the rear & side of an existing dwelling house & associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
12 Dec 2025
Decision: CONDITIONAL
11 Feb 2026
Decision due
14 Feb 2026
Grant issued
20 Mar 2026
Application Details
- Location
- Ballydaly , Tullamore , Co. Offaly
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Offaly County Council
- Site Area
- 0.2 ha
- Floor Area
- 160 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 12 December 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 11 February 2026
- Grant Date
- 20 March 2026
- Permission Expires
- 19 March 2031
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
FOR THE CONSTRUCTION OF SLATTED SHED AND ALL ANCILLARY SITE WORKS
BALLYCOSNEY , BALLYDALY , TULLAMORE
DORMER STYLE DWELLING, GARAGE, TREATMENT SYSTEM, PERCOLATION AREA, NEW ENTRANCE AND ALL ASSOCIATED SITE WORKS
BALLYDALY , TULLAMORE , CO. OFFALY
to amend previously approved planning application 23/27 to include changes to the floor plan and elevations of the dormer style dwelling and all assoc site works. "
Ballydaly , Tullamore , County Offaly
DORMER STYLE DWELLING, GARAGE, TREATMENT SYSTEM, PERCOLATION AREA, NEW ENTRANCE AND ALL ASSOC SITE WORKS
BALLYDALY , TULLAMORE , CO. OFFALY
CONSTRUCTION OF AN EXTENSION. THE PROPOSED GROUND FLOOR EXTENSION IS TO THE REAR OF EXISTING DWELLING. THE APPLICATION WILL ALSO INCLUDE ALL ASSOCIATED SITE-WORKS
ROSNAGOWLOGE , TINNYCROSS , TULLAMORE CO OFFALY
CONSTRUCTION OF AN EXTENSION. THE PROPOSED GROUND FLOOR EXTENSION IS TO THE REAR OF EXISTING DWELLING. THE APPLICATION WILL ALSO INCLUDE ALL ASSOCIATED SITE-WORKS
ROSNAGOWLOGE , TINNYCROSS , TULLAMORE CO OFFALY
A GRID SYSTEM SERVICES FACILITY WITHIN A TOTAL SITE AREA OF 0.84 HECTARES, TO INCLUDE 1 NO. SINGLE STOREY ELECTRICAL SUBSTATION BUILDING, 1 NO. CUSTOMER SWITCHGEAR CONTAINER, 17 NO. 2MW ELECTRICAL INVERTER/TRANSFORMER STATION MODULES (SKIDS), 10 NO. CONTAINERISED BATTERY STORAGE MODULES ON CONCRETE SUPPORT STRUCTURES, 40 NO. HEATING, VENTILATION AND AIR CONDITIONING UNITS (HVAC UNITS), ACCESS TRACKS AND UPGRADED SITE ENTRANCE, ASSOCIATED ELECTRICAL CABLING AND DUCTING, SECURITY GATES AND PERIMETER SECURITY FENCING, CCTV SECURITY MONITORING SYSTEM, LANDSCAPING WORKS AND ALL ASSOCIATED ANCILLARY INFRASTRUCTURE
DERRYNAGALL OR BALLYDALY , TULLAMORE , CO OFFALY
A GRID SYSTEM SERVICES FACILITY WITHIN A TOTAL SITE AREA OF UP TO 0.84 HECTARES, TO INCLUDE 1 NO. SINGLE STOREY ELECTRICAL SUBSTATION BUILDING, 1 NO. CUSTOMER SWITCHGEAR, ELECTRICAL INVERTER/TRANSFORMER STATION MODULES, CONTAINERISED BATTERY STORAGE MODULES ON CONCRETE SUPPORT STRUCTURES, HEATING, VENTILATION AND AIR CONDITIONING UNITS (HVAC UNITS), ACCESS TRACKS AND UPGRADED SITE ENTRANCE, ASSOCIATED ELECTRICAL CABLING AND DUCTING, SECURITY GATES, PERIMETER SECURITY FENCING, CCTV SECURITY MONITORING SYSTEM AND LANDSCAPING WORKS AND ALL ASSOCIATED ANCILLARY INFRASTRUCTURE
DERRYNAGALL OR BALLYDALY , TULLAMORE , CO OFFALY
a 10 year planning permission. The development will consist of a grid system services facility within a total site area of 3.5 hectares. The proposed development will have a projected life span of 30 years. The development will include 1 no. single storey electrical substation building, 1 no. customer substation control and switch rooms, up to 20 no. electrical inverter/transformer station modules mounted on concrete plinths, up to 80 no. containerised battery blocks on concrete support structures and associated heating, ventilation and air conditioning units (HVAC units), access tracks and upgraded site entrance, associated electrical cabling and ducting, security gates and perimeter security fencing up to 2.6m palisade fencing, CCTV security monitoring system, landscaping works and all associated ancillary infrastructure.
Derrynagall or Ballydaly , Tullamore , Co. Offaly
a 10 year planning permission. The development will consist of a grid system services facility within a total site area of 3.5 hectares. The proposed development will have a projected life span of 30 years. The development will include 1 no. single storey electrical substation building, 1 no. customer substation control and switch rooms, up to 20 no. electrical inverter/transformer station modules mounted on concrete plinths, up to 80 no. containerised battery blocks on concrete support structures and associated heating, ventilation and air conditioning units (HVAC units), access tracks and upgraded site entrance, associated electrical cabling and ducting, security gates and perimeter security fencing up to 2.6m palisade fencing, CCTV security monitoring system, landscaping works and all associated ancillary infrastructure