CONDITIONAL

Offaly - Offaly County Council

Proposed Development

a new dwelling house, domestic garage, new site entrance, septic tank and percolation area and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Dec 2025

  2. Decision due

    19 Feb 2026

  3. Decision: CONDITIONAL

    19 Feb 2026

  4. Grant issued

    26 Mar 2026

Application Details

Location
Ballynamona Glebe , Killyon , Birr Co. Offaly
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
0.376 ha
Floor Area
215.94 sq m
Residential Units
1

Timeline

Registration Date
17 December 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 February 2026
Grant Date
26 March 2026
Permission Expires
25 March 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

482m
17294CONDITIONAL9 Aug 2017

DEMOLITION OF EXISTING DERELICT DWELLING HOUSE, CONSTRUCTION OF NEW DWELLING AND INSTALLATION OF SEPTIC TANK WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

RATHGIBBON NORTH , KILLYON , BIRR

781m
2560222CONDITIONAL9 Jun 2025

construction of a side extension to our existing dwelling house, and alterations to the existing dwelling house to include proposed windows and doors, installation of rooflights in the existing roof and a proposed front porch and all associated site works

Rathure South , Killyon , Birr Co. Offaly.

782m
19426CONDITIONAL3 Sept 2019

BUILDING ADDITION AND ALTERATIONS TO EXISTING DWELLING HOUSE, INSTALL NEW SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS

RATHURE SOUTH , KILLYON BIRR , CO OFFALY

1.0km
1740CONDITIONAL7 Feb 2017

CONSTRUCTION OF NEW DWELLING, INSTALLATION OF NEW EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA, PROVISION OF NEW ENTRANCE AND ALL ASSOCIATED SITE WORKS

RATHGIBBON SOUTH , KILLYON , BIRR

1.1km
1883CONDITIONAL26 Feb 2018

THE CONSTRUCTION OF A TWO STOREY DWELLING, GARAGE, SEPTIC TANK TREATMENT SYSTEM, PERCOLATION AREA, NEW ENTRANCE, DRIVEWAY, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

RATHGIBBON SOUTH , KILLYON , BIRR CO. OFFALY

1.1km
24115CONDITIONAL20 Aug 2024

CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS

GARRYSALLAGH GLEBE , RATH , BIRR CO. OFFALY

1.1km
24143CONDITIONAL4 Oct 2024

CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS

GARRYSALLAGH GLEBE RATH , BIRR , CO. OFFALY

1.2km
22662CONDITIONAL21 Dec 2022

CONSTRUCTION OF A TWO STOREY DWELLING AND SINGLE STOREY GARAGE, WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA, NEW ENTRANCE, DRIVEWAY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS.

RATHGIBBON SOUTH , KILLYON BIRR , CO. OFFALY

1.2km
20476CONDITIONAL5 Oct 2020

A 10 YEAR PERMISSION FOR DEVELOPMENT WHICH CONSISTS OF THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 45MW COMPRISING OF CA. 105,000 NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, THE CONSTRUCTION OF 38KV SUBSTATION (CA. 114.4M2 X 4.75 TALL), A TRANSFORMER UNIT (CA. 18M2 X 4M TALL) AND ASSOCIATED BUND (CA.55M2), ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 16 NO POWER HUBS (CA.15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 1 NO. SINGLE STOREY GRP KIOSK (3M2 X 4M), 10 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, A NEW SITE ENTRANCE AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WILL BE CA. 45.2HA. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION

RATHMOUNT MULLANAFAWNIA , AND RUSSELLSPENN , CO. OFFALY

1.2km
20432N/A11 Sept 2020

THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 45MW COMPRISING OF CA. 105,000NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, THE CONSTRUCTION OF 38KV SUBSTATION (CA. 114.4M2 X 4.75 TALL), A TRANSFORMER UNIT (CA. 18M2 X 4M TALL) AND ASSOCIATED SITE BUND (CA.55M2), ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 16 NO POWER HUBS (CA.15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 1 NO. SINGLE STOREY GRP KIOSK (3M2 X 4M), 10 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, A NEW SITE ENTRANCE FROM THE ADJOINING L7007 TO THE NORTH AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WILL BE CA. 45.2HA. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION

RATHMOUNTMULLANAFAWNIA , AND RUSSELLSPENN , CO. OFFALY