The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2560665

N/A

Tipperary - Tipperary County Council

Proposed Development

the installation of a compact modular substation and ancillary site development works to facilitate 3 no. shared electric vehicle charging units and 6 no. charging bays and ancillary site works within a partially reconfigured area, and the installation of signage

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Jul 2025

  2. Further information requested

    27 Aug 2025

  3. Further information received

    2 Oct 2025

  4. Application withdrawn

    27 May 2026

Application Details

Location
The Horse and Jockey Hotel , Horse and Jockey , Thurles Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.033 ha

Timeline

Registration Date
11 July 2025
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
27 May 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

228m
2335N/A15 Feb 2023

(1) the deconstruction of existing cottage (2) the construction of a dwelling, site entrance and effluent treatment system (3) and including all associated site development works

Curraheen , Horse & Jockey , Thurles

350m
17600922CONDITIONAL18 Aug 2017

construction of a new living room extension to front of existing dwelling together with all associated site works

Curragheen , Horse & Jockey , Co. Tipperary

448m
2660614CONDITIONAL23 Jun 2026

renovation and extension of an existing dwelling house including demolition of existing rear extension & standalone shed, construction of a new open-plan rear extension with mezzanine accommodation, alterations to the existing dwelling, replacement of the existing septic tank with a packaged wastewater treatment system and polishing filter, and all associated site development works

Kylenoe , Horse and Jockey , Thurles Co. Tipperary

460m
19600612CONDITIONAL5 Jun 2019

all works as completed to dwellinghouse, garage, entrance, septic tank and associated works

Curraheen , Horse & Jockey , Thurles

550m
2360101CONDITIONAL16 Feb 2023

the construction and extension of our dwelling consisting of a home office/ hobby room and home gym/study room with all associated siteworks

Curraheen , Horse and Jockey , Thurles

686m
24210CONDITIONAL16 Sept 2024

demolition of a single storey front porch and demolition of a side extension and the construction of a two storey side and front extension, alterations to existing rear elevations, waste water treatment system, site entrance, site boundary and all associated site works

Maxford , Horse and Jockey , Thurles

687m
24192N/A26 Aug 2024

demolition of a single storey side extension and the construction of a two storey side and front extension, alterations to existing rear elevation, waste water treatment system, site entrance, site boundary and all associated site works

Maxford , Horse and Jockey , Thurles

810m
201409CONDITIONAL26 Nov 2020

a dwelling, domestic garage, entrance, install waste water treatment system including associated site works

Moycarkey , Horse & Jockey , Thurles

894m
19601370CONDITIONAL6 Dec 2019

new two storey dwelling, alterations to existing site entrance, new waste water treatment system and percolation area and all associated site works

Curraheen , Horse and Jockey , Thurles Co. Tipperary

988m
24219N/A30 Sept 2024

the construction of a two storey side and rear extension, alterations to existing cottage elevations, garage, waste water treatment system, alterations to site boundaries and all associated site works

Parkstown , Horse and Jockey , Thurles

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection