The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2560666

N/A

Donegal - Donegal County Council

Proposed Development

CONSTRUCTION OF A DWELLING HOUSE, WITH WASTE WATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

View the full application file on the council's planning portal →

Application Details

Location
BALLURE , FANAD NORTH , FANAD LETTERKENNY PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.461 ha
Floor Area
290 sq m
Residential Units
1

Timeline

Registration Date
29 April 2025
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560712N/A6 May 2025

CONSTRUCTION OF A DWELLING HOUSE WITH WASTE WATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

BALLURE , FANAD NORTH , FANAD LETTERKENNY PO

1m
2560292N/A3 Mar 2025

CONSTRUCTION OF A DWELLING HOUSE WITH WASTE WATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

BALLURE , FANAD NORTH , FANAD LETTERKENNY PO

248m
2560015CONDITIONAL13 Jan 2025

(1) CONSTRUCTION OF EXTENSION TO THE FRONT AND REAR OF EXISTING DWELLING AND (2) RENOVATION WORKS AND MINOR ELEVATIONAL CHANGES AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

BALLOOR , FANAD , LETTERKENNY PO

333m
2050668CONDITIONAL25 May 2020

CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO NEW SEPTIC TANK AND ALL ASSOCIATED SITE WORKS

BALLURE , BALLYLAR FANAD , LETTERKENNY

679m
2460912CONDITIONAL18 Jun 2024

EXTENSION AND RENOVATION OF EXISTING COTTAGE INCLUDING INSTALLATION OF A WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS

BALLYMICHAEL , FANAD , LETTERKENNY

827m
2560954CONDITIONAL9 Jun 2025

(1) CONSTRUCTION OF (A) A PROPOSED SINGLE STOREY EXTENSION TO THE SIDE OF EXISTING HOUSE AND (B) A NEW BAY WINDOW WITH CANOPY PORCH TO THE FRONT OF THE HOUSE, (2) GENERAL AMENDMENTS TO SELECTED WINDOWS AND DOORS EXTERNALLY THROUGHOUT THE HOUSE WHICH INCLUDES NEW REPLACEMENT WINDOWS AND (3) INTERNAL RENOVATION WORKS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

BALLYMICHAEL , PORTSALON , LETTERKENNY PO

841m
1850581CONDITIONAL17 Apr 2018

2 NO. EXTENSIONS TO REAR OF EXISTING DWELLING HOUSE AND CONNECTION TO EXISTING SEPTIC TANK AND SEWAGE TREATMENT PLANT AND A DOMESTIC GARAGE TO REAR OF EXISTING DWELLING HOUSE

BALLYMICHAEL , BALLYLAR , FANAD

866m
2351237CONDITIONAL18 Aug 2023

INSTALLATION OF A SEPTIC TANK / WASTEWATER SEWAGE TREATMENT SYSTEM AND PERCOLATION AREA TO SERVICE EXISTING HOUSE AND ALL ANCILLARY SITE DEVELOPMENT WORKS

ARRYHEERNABIN , PORTSALON , LETTERKENNY PO

934m
2150049UNCONDITIONAL20 Jan 2021

THE INCREASE IN HEIGHT AND EXTENSION TO THE LIGHTHOUSE TAVERN TO PROVIDE THE FOLLOWING (1) PROVISION OF ENTRANCE LOBBY, BAR STORE, MALE DORMITORY WITH TOILETS AND SHOWERS, LAUNDRY AND STORE AT BASEMENT LEVEL. (2) CHANGE OF USE OF EXISTING DWELLING HOUSE TO FOYER , STAFF/ OFFICE AREA AND BAR, PROVISION OF LOUNGE, FEMALE DORMITORY WITH TOILETS AND SHOWERS, MALE AND FEMALE LOCKER ROOMS WITH TOILETS AND SHOWERS, TOILETS AND STORE. DEMOLITION OF EXISTING BAR & LOUNGE TO PROVIDE VEHICULAR EGRESS FROM CARPARK. PROVISION OF GENERATOR ROOM & BIN STORAGE AREA AT GROUND FLOOR LEVEL. (3) PROVISION OF 6 NO. EN-SUITE BEDROOMS, RESIDENTIAL APARTMENT AND STORES AT FIRST FLOOR LEVEL. (4) PROVISION OF DINING ROOM, KITCHEN, BREAKFAST AREA, RESIDENTS LOUNGE, TOILETS AND KITCHEN STORES AT SECOND FLOOR LEVEL. (5) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF ON-SITE SEWERAGE TREATMENT SYSTEM WITH SAND POLISHING FILTER. (6) DRILL DEEP BORED WELL ON SITE. (7) PROVISION OF NEW SIGNAGE AND ALL ASSOCIATED SITE WORKS

ARRYHEERNABIN , BALLYARR , LETTERKENNY PO

935m
1750534CONDITIONAL5 Apr 2017

THE FOLLOWING ALTERATIONS TO PLANNING PERMISSION GRANTED UNDER PLANNING REF.NO. 15/50673. (1) ADDITION OF TWO NUMBER SINGLE STORIED EXTENSIONS TO REAR OF BUILDING. (A) TO ENCLOSE STAIRS LEADING TO BASEMENT AND (B) TO PROVIDE TOILETS AT GROUND FLOOR LEVEL. (2) ADDITION OF LINK CORRIDOR AT FIRST FLOOR LEVEL BETWEEN MAIN BUILDING AND ANNEX BUILDING (3) INCREASE IN FLOOR AREA OF BASEMENT (4) INCREASE IN WIDTH OF STAIR ENCLOSURE AT REAR OF BUILDING (5) ALTERATIONS TO INTERNAL LAYOUT (6) ALTERATIONS TO FENESTRATION PATTERN AND (7) ALL ASSOCIATED SITE WORKS

ARRYHEERNABIN , BALLYLAR P.O. , LETTERKENNY

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?