The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2560691

N/A

Kerry - Kerry County Council

Proposed Development

Invalid: • Demolition of an existing single storey timber building to the north-east of the site. • Development of a new single storey ‘Tigin’ building, comprising a multi-use space for small events, ancillary storage, kitchenette and W/C facilities, providing a total gross floor space of 147sqm, with the proposed ‘Tigin’ to be used be used for ancillary purposes to complement the existing facilities in the main hotel building • The proposed development includes all associated and ancillary works including landscaping and infrastructure works.

View the full application file on the council's planning portal →

Application Details

Location
The Park Hotel , Kenmare , Co. Kerry
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kerry County Council
Site Area
0.295 ha

Timeline

Registration Date
8 August 2025
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2460962CONDITIONAL10 Dec 2024

The proposed development comprises of amendments, modifications, extension and part change of use of the existing two storey Spa building connected to the hotel to the west of the hotel, including: (a) At ground floor level: (i) Refurbishment of the existing spa facilities and consolidation of all spa facilities into the ground floor of the existing two storey spa building; (ii) An extension to the ground floor to the west of circa 38 sq.m gross to provide for additional space to accommodate the full extent of the spa facilities at ground floor. The proposed extension at this level occurs in the location of an existing deck area to the west end of the building. (iii) New outdoor area to be west of new extension. (iv) An extension to the south of 8 sq.m, located to the west of the existing treatment room. (v) Extension to the north of 5 sq.m to provide for a widening of an existing corridor. (vi) An extension of 26 sq.m to the existing link corridor to the main hotel, to provide a widened corridor. The overall increase in floorspace at ground floor will be circa 77 sq.m gross. (b) At first floor level: (i) Provide the hotel with 6 no. additional guestrooms at first floor level through internal reconfiguration and amendment of existing space and extension of 90 sq.m through infilling of an existing south facing balcony located centrally; (ii) An extension to the west, partly above the extension at ground floor referenced above, to provide additional indoor space of 70 sq.m gross. (iii) A new first floor corridor linking to the existing hotel, above the existing single level corridor to the east of the Spa building, comprising of an extension of 77 sq.m gross. (iv) Part of the large existing lounge at first floor level, to the north of the first floor, to be converted into a yoga space. The existing gym is to be retained with some minor modifications, and a new pilates area to be created by modifying the existing deck space. (v) Extension of 26 sq.m gross (above proposed ground floor extension) to facilitate an extension to the spa facilities. The overall increase in floorspace at first floor will be circa 273.5 sq.m gross. (c) All associated and ancillary works, including lighting and landscaping. The proposed development will increase the floorspace from circa 1,044 sq.m gross to circa 1394.5 sq.m gross.

Park Hotel Shelbourne Street , Kenmare , Co. Kerry

0m
2560715CONDITIONAL18 Aug 2025

• Demolition of an existing single storey timber building to the north-east of the site. • Development of a new single storey ‘Tigin’ building, comprising a multi-use space for small events, ancillary storage, kitchenette and W/C facilities, providing a total gross floor space of 147sqm, with the proposed ‘Tigin’ to be used be used for ancillary purposes to complement the existing facilities in the main hotel building • The proposed development includes all associated and ancillary works including landscaping and infrastructure works.

The Park Hotel , Kenmare , Co. Kerry

113m
211241CONDITIONAL2 Nov 2021

(1) CHANGE OF USE OF FORMER PRIMARY SCHOOL TO ST JOHN OF GODS KENMARE DAY SERVICES CENTRE. (2) INTERNAL ALTERATIONS, SIGNAGE AND ALL ASSOCIATED SITE WORKS INCLUDING RAMP. THIS IS A PROTECTED STRUCTURE (RPS REFERENCE NO. KY-93-10-12)

KENMARE , CO KERRY

125m
19351CONDITIONAL4 Apr 2019

RETAIN AS BUILT (A) THE CHANGE OF USE OF GROUND FLOOR DOMESTIC STORAGE TO RETAIL/COMMERCIAL USE (B) THE CHANGE OF USE OF FIRST FLOOR OFFICES TO THREE-BEDROOM APARTMENT (C) THE CHANGE OF USE OF SECOND FLOOR RETAIL/COMMERCIAL STORAGE TO TWO-BEDROOM APARTMENT (D) ALL ASSOCIATED ELEVATIONAL CHANGES AND ALTERATIONS AND (E) ALL ASSOCIATED SITE WORKS TO FACILITATE THIS DEVELOPMENT AT FORMALLY "MANGO CRAFTS" RETAIL/COMMERCIAL UNIT AND HAWTHORN LODGES/APARTMENTS

SHELBOURNE STREET , KENMARE , CO KERRY

137m
20779CONDITIONAL31 Aug 2020

(A) DEMOLISH EXISTING FIRE DAMAGED GOLF CLUBHOUSE BUILDING AND ANCILLARY OUTBUILDING AT THE REAR OF THE PREMISES AND (B) TO CONSTRUCT A NEW GOLF CLUBHOUSE BUILDING TO REPLACE SAME INCLUDING A NEW PUMPHOUSE OUTBUILDING AND A NEW GOLF BUGGY CHARGING AREA AND ALL NECESSARY ANCILLARY SERVICES WORKS, SITE WORKS, HARD AND SOFT LANDSCAPING WORKS AT KENMARE GOLF CLUB

KILLOWEN ROAD , KENMARE , CO KERRY

154m
18107CONDITIONAL12 Feb 2018

CONSTRUCT A NEW REAR EXTENSION TO PROVIDE ADDITIONAL ANCILLARY STORAGE TO EXISTING BUILDING WHICH IS A PROTECTED STRUCTURE (RPS-KY-093-065) AND ALL ASSOCIATED SITE WORKS TO FACILITATE THIS DEVELOPMENT

KENMARE , CO KERRY

157m
211520CONDITIONAL23 Dec 2021

(A) DEVELOP NEW EXTENSION TO REAR OF CHURCH, PROVIDING ADDITIONAL LOBBY ACCESS AND NEW TOILET FACILITY, (B) DE-COMMISSION EXISTING SEPTIC TANK AND PROVIDE CONNECTION TO MAINS SEWER, (C) PROVIDE ADDED HARD-STAND/SET-DOWN SPACE AND ANCILLARY SITE IMPROVEMENTS, (D) IMPROVE ENTRANCE ACCESS AND PEDESTRIAN ACCESS AT PUBLIC ROAD

ST PATRICKS CHURCH OF IRELAND , BELL HEIGHTS , KENMARE

174m
2118REFUSED18 Jan 2021

THE MATERIAL CHANGE OF USE OF THE EXISTING PROPERTY FROM RESIDENTIAL USE TO SHORT TERM LETTING USE AS PER THE RESIDENTIAL TENANCIES (AMENDMENT) ACT 2019

4 HENRY COURT , KENMARE , CO KERRY

176m
1886N/A7 Feb 2018

CONSTRUCT A TWO STOREY BUILDING FOR A NANO BREWERY TO THE REAR OF

25 MAIN STREET , KENMARE , CO KERRY

176m
18199CONDITIONAL7 Mar 2018

CONSTRUCT A TWO STOREY BUILDING FOR A NANO BREWERY TO THE REAR OF THE BUILDING

25 MAIN STREET , KENMARE

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?