2560804
CONDITIONALGalway - Galway County Council
Proposed Development
of an existing helipad and ancillary helicopter facilities consisting of three portable cabins and a fuel storage tank (previously granted permission under Galway County Council Ref. 55848 and 08/3669) used for helicopter operations for maintenance to the nearby offshore lighthouses. The site will continue to be used for helicopter operations for maintenance of lighthouses. Gross floor space of work to be retained: 66sqm
View the full application file on the council's planning portal →Application Timeline
Application received
20 Jun 2025
Decision: CONDITIONAL
8 Aug 2025
Decision due
14 Aug 2025
Grant issued
16 Sept 2025
Application Details
- Location
- Ros a Mhíl , Derroe Rossaveel , Co Galway
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Galway County Council
- Site Area
- 0.174 ha
Timeline
- Registration Date
- 20 June 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 8 August 2025
- Grant Date
- 16 September 2025
- Permission Expires
- 15 September 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for a new storage building and all ancillary works. Gross floor space of proposed works: 316.50
Ros an Mhíl ,
Is éard a bheidh san fhorbairt seo ná forhalla gaoithe 6 sqm a thógáil os comhair an Ionaid Iascaigh Cuain atá ann faoi láthair agus athruithe a dhéanamh ar an rochtain rampa. The development will consist of a 6 sqm wind lobby to the front of the existing Fishery Harbour Centre and modifications to the existing ramp access
Rossaveel Fishery Harbour Centre , Ros An Mhíl , Co. Galway
for the reclamation of a waterlogged area to the south of the Department of Agriculture, Food and the Marine's public car park
Rossaveel , Fishery Harbour Centre , Co. Galway
for development at Rossaveel Fishery Harbour Centre in Rossaveel, Co. Galway. The development will consist of a deep water quay which will provide 200 metres of outside berthing frontage at Rossaveel Harbour. A reclamation area will also be constructed directly behind the deep water quay which will provide a hard surfaced link to the existing onshore. The development will also include low concrete sea walls , a rock armour revetment, access road, lighting, drainage infrastructure and other ancillary site works. An Environmental Impact Statement has been prepared for this development and is included with the planning application. Gross floor area 66800
Rossaveel ,
for development at Rossaveel Fishery Harbour Centre in Rossaveel, Co. Galway. The development will consist of a deep water quay which will provide 200 metres of outside berthing frontage at Rossaveel Harbour. A reclamation area will also be constructed directly behind the deep water quay which will provide a hard surfaced link to the existing onshore. The development will also include low concrete sea walls , a rock armour revetment, access road, lighting, drainage infrastructure and other ancillary site works. An Environmental Impact Statement has been prepared for this development and is included with the planning application. Gross floor area 66800
Ros an Mhíl ,
for development at Rossaveel Fishery Harbour Centre in Rossaveel, Co. Galway. The development will consist of a deep water quay which will provide 200 metres of outside berthing frontage at Rossaveel Harbour. A reclamation area will also be constructed directly behind the deep water quay which will provide a hard surfaced link to the existing onshore. The development will also include low concrete sea walls , a rock armour revetment, access road, lighting, drainage infrastructure and other ancillary site works. An Environmental Impact Statement has been prepared for this development and is included with the planning application. Gross floor area 66800
Rossaveel ,
Incorrect submission process please See Pl. Ref. 23/218 [Extension of the Appropriate Period for a deep-water quay which will provide 200metres of outside berthing frontage at Rossaveel Harbour. A reclamation area will also be constructed directly behind the deep-water quay which will provide a hard surfaced link to the existing onshore. The development will also include low concrete sea walls, a rock armour revetment, access road, lighting, drainage infrastructure and other ancillary site works. An Environmental Impact Statement was prepared for this development and was included with the original planning application. Gross floor area 66,800m² including navigation channels in the townland of Rossaveel]
Ros An Mhíl Fishery Harbour Centre , Ros An Mhíl (Rossaveel) , Co. Galway
to construct a new 89sqm boat store extension. Gross floor space of proposed works: 89sqm
Rossaveal ,
which consists of the replacement of the existing shelters with new structures and public realm improvements
Ros an Mhíl , , Rossaveel Fishery Harbour Centre
a dhéanamh ag an suíomh seo ag Ionad Iascaigh Cuain Ros an Mhíl. Saoráidí Fóntais a thógáil don chaladh bád ag lárionad chuan isacaigh Ros an Mhíl ina mbeidh saoráidí leasa ar leibhéal bunurláir agus oifig riaracháin ar leibhéal an chéad urláir chomh maith leis na fosheirbhísi gaolmhara ar fad. Spas urláir comhlán na n-oibreacha beartaithe: 182 sqm
Ros an Mhíl (Rossaveel) ,
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?