2560857
N/ADonegal - Donegal County Council
Proposed Development
OMISSION OF CONDITION NO. 2 (C) OF PERMISSION REG. REF. NO. L89/98 AND TO PERMIT THE ABILITY OF VEHICLES EXITING THE SITE TO TURN RIGHT ONTO THE R940 RAMELTON ROAD, ALSO INCLUDING APPROPRIATE ROAD MARKINGS ON THE PUBLIC ROAD, RELEVANT SIGNAGE AND ROAD MARKINGS WITHIN THE SITE WITH NO OTHER CHANGES PROPOSED TO THE EXISTING DEVELOPMENT
View the full application file on the council's planning portal →Application Timeline
Application received
28 May 2025
Application withdrawn
1 Jul 2025
Decision due
22 Jul 2025
Application Details
- Location
- ALDI , RAMELTON ROAD , LETTERKENNY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.53 ha
Timeline
- Registration Date
- 28 May 2025
- Status
- WITHDRAWN
- Decision
- N/A
- Decision Due
- 22 July 2025
- Withdrawn
- 1 July 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCTION OF A BOUNDARY WALL WITH IRON RAILING ON TOP AND INSTALLATION OF IRON GATES WITH ALL ASSOCIATED SITE WORKS
WALNUT GROVE , GORTLEE , LETTERKENNY PO
CONSTRUCTION OF A BOUNDARY WALL WITH IRON RAILING ON TOP AND ALL ASSOCIATED SITE WORKS
WALNUT GROVE , GORTLEE , LETTERKENNY PO
EMERGENCY ESCAPE DOOR TO THE EXTERNAL WALL OF UNIT 31 ON THE SOUTH ELEVATION ADJACENT TO THE SOUTH ENTRANCE OF THE SHOPPING CENTRE
UNIT 31 LETTERKENNY SHOPPING CENTRE , PORT ROAD , LETTERKENNY
EXTENSION OF THE EXISTING SOUTHEAST SERVICE YARD AND THE ASSOCIATED EXTERNAL SCREEN WALL WITH GATE ACCESS ADJACENT TO THE SOUTH ENTRANCE
LETTERKENNY SHOPPING CENTRE , PORT ROAD , LETTERKENNY PO
CHANGE OF USE OF UNITS 10 AND 11 FROM RETAIL TO COFFEE SHOP
LETTERKENNY SHOPPING CENTRE , PORT ROAD , LETTERKENNY
DEVELOPMENT AT A SITE OF 0.76HA AT LETTERKENNY SHOPPING CENTRE AND PORT ROAD, LETTERKENNY, CO. DONEGAL. THE DEVELOPMENT WILL CONSIST OF : DEMOLITION OF EXISTING SHED: CONSTRUCTION OF A 4-ISLAND PETROL FILLING STATION INCORPORATING A KIOSK (49 M2 GROSS), FORECOURT CANOPY, ALL ADVERTISING SIGNAGE, UNDERGROUND STORAGE TANKS, CIRCULATION AREA, PROVISION FOR AIR AND WATER, LANDSCAPING, BOUNDARY TREATMENT AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. DEVELOPMENT INCLUDES ALL ACCESS AND EGRESS PROVISIONS VIA A ONE-WAY ENTRY AND ONE-WAY EXIT SYSTEM VIA THE EXISTING CAR PARK ACCESS ROAD, INCLUDING (A) WIDENING THE EXISTING ACCESS ROAD TO A TWO-LANE ACCESS ROAD (B) CLOSING A NUMBER OF EXISTING CAR PARKING ENTRANCES TO IMPROVE QUEUING DISTANCES AND (C) REORGANISATION OF PART OF THE EXISTING CAR PARK OF THE LETTERKENNY SHOPPING CENTRE TO FACILTATE THE PROPOSAL (INCURRING A NET LOSS OF 26 NO. SPACES) ALL AT LETTERKENNY SHOPPING CENTRE
PORT ROAD , LETTERKENNY , CO. DONEGAL
REVISION TO PREVIOUSLY APPROVED PERMISSION (PLAN. REF. NO. 13/80091, EXTENDED UNDER PLAN. REF. NO. 19/50059 REFERS) CONSISTING OF CONSTRUCTION OF A NEW BIOMASS HEATING CENTRE, AS PART OF THE NORTH-WEST REGIONAL SCIENCE PARK PROJECT. SITE C.056HA LOCATED WEST OF THE MAIN BUILDING OF LETTERKENNY IT CAMPUS. THE FOOTPRINT OF THE BUILDING REMAINS UNCHANGED. THE LOCATION HAS BEEN MODIFIED IN ORDER TO ALLOW FOR FUTURE EXTENSION TO THE LYIT CAMPUS BUILDING AND "GREENWAY" ROUTE. THE 83 SPACE CAR-PARKING AREA INCLUDED IN THE ORIGINAL GRANT OF PERMISSION HAS BEEN REMOVED
PORT ROAD , LETTERKENNY , LETTERKENNY PO
(1) 3 NO. MODULAR STRUCTURES FOR STAFF FACILITIES, FUEL SALES AND TOILETS, (2) 5 NO. ABOVE GROUND SELF-BUNDED FUEL STORAGE TANKS, (3) 1 NO. ABOVE GROUND HVO TANK WITH DISPENSER, (4) 1 NO. CANOPY OVER BOTTOM LOADING SKIDS AND (5) VARIOUS FREESTANDING AND WALL MOUNTED SIGNAGE, AND LUBRICANT/FUEL FORECOURT DISPLAYS
CERTA LETTERKENNY , PORT ROAD , LETTERKENNY
(1) CHANGE OF USE FROM RESIDENTIAL DWELLING TO COMMUNITY DWELLING HOME FOR THE PROVISION OF RESIDENTIAL ACCOMMODATION AND CARE TO PEOPLE IN NEED OF CARE, (2) DEMOLITION OF EXISTING SHED AND (3) WORKS TO DWELLING INCLUDING: (A) CONSTRUCTION OF TWO-STOREY EXTENSION TO REAR PROVIDING FOR 6 NO. EN-SUITE BEDROOMS, (B) INTERNAL ALTERATIONS AT BASEMENT, GROUND AND FIRST FLOOR OF EXISTING BUILDING TO PROVIDE FOR LAUNDRY, STORAGE, PLANT, 5 NO. BEDROOMS (2 OF THESE BEDROOMS ARE EN-SUITE), LIVING ROOM, KITCHEN, DINING ROOM, AND BATHROOM. THE FACILITY WILL PROVIDE 11 NO. BEDROOMS IN TOTAL, (C) PROVISION OF WHEELCHAIR RAMP TO NEW SECONDARY ENTRANCE TO REAR OF BUILDING AND NEW ENTRANCE TO BASEMENT, (D) PROVISION OF NEW WINDOW ON SOUTHWESTERN FAÇADE OF EXISTING BUILDING, (E) ALTERATIONS TO REAR GARDEN TO PROVIDE 6 NO. CAR PARKING SPACES (INCLUSIVE OF 2 NO. DISABLED AND 2 NO. EV), (F) PROVISION OF BICYCLE PARKING TO REAR, (G) CONVERSION OF EXISTING GARAGE TO PROVIDE STAFF ACCOMMODATION COMPRISING BEDROOM, LIVING AREA, AND STAFF OFFICE, (H) PROVISION OF NEW WINDOWS THROUGHOUT AND 1 NO. DORMER WINDOW AT FIRST FLOOR AND (I) LANDSCAPING, BOUNDARY TREATMENTS, SUDS AND FOUL DRAINAGE AND ALL ANCILLARY WORKS NECESSARY TO FACILITATE THE DEVELOPMENT
OATLANDS , RAMELTON ROAD , LETTERKENNY
DEVELOPMENT CONSISTING OF (A) DEMOLITION OF EXISTING VACANT SHED ON SITE AND RELOCATION OF EXISTING FLAG POLES; (B) THE REALIGNMENT OF AN EXISTING VEHICULAR ENTRANCE AND REMOVAL OF AN EXISTING SECONDARY VEHICULAR ENTRANCE FROM THE R229 REGIONAL ROAD; (C) PROVISION OF A TWO STOREY RESTAURANT BUILDING WITH ANCILLARY TAKE-AWAY, COMMUNAL SEATING AREA AND DRIVE THRU FACILITIES, OFFICE, WC FACILITIES, KITCHEN, STORAGE, STAFF FACILITIES AND ASSOCIATED ILLUMINATED SIGNAGE (FLOOR AREA: 452 SQ.M); (D) PARKING FOR 25 CARS AND COACH PARKING; (E) 1 NO. ILLUMINATED TOTEM POLE WITH ASSOCIATED SIGNAGE AND (F) ALL OTHER ANCILLARY SITE DEVELOPMENT WORKS, INCLUDING HARD AND SOFT LANDSCAPING, LIGHTING AND BOUNDARY WORKS
PORT ROAD , LETTERKENNY , CO. DONEGAL
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?