2560900
CONDITIONALMayo - Mayo County Council
Proposed Development
Planning permission for development consisting of the following (1) Change of use from existing light industrial (P02/2256 Refers) to recreational/Leisure facility (2) building signage to front elevation (3) Amend existing car parking and provide bicycle parking, (4) and the carrying out of all associated ancillary site works at Abbeyhalfquarter, I.D.A. Industrial Estate, Bunree, Ballina, Co. Mayo.
View the full application file on the council's planning portal →Application Timeline
Application received
10 Dec 2025
Decision: CONDITIONAL
10 Feb 2026
Decision due
12 Feb 2026
Grant issued
13 Mar 2026
Application Details
- Location
- Abbeyhalfquarter , IDA Industrial Estate , Bunree Ballina Co. Mayo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Mayo County Council
- Site Area
- 0.279 ha
Timeline
- Registration Date
- 10 December 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 10 February 2026
- Grant Date
- 13 March 2026
- Permission Expires
- 12 March 2031
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of a new steel framed commercial unit measuring 3,323 sq.m. together with associated on-site car parking and connection to public foul and stormwater sewer and all other associated site development works
Bunree Industrial Estate , Abbeyhalfquarter , Ballina
Construct an extension of 119.23sqm to commercial unit currently under construction, (which was granted permission previously under P16/673) for sorting recyclable materials with a revised site layout, together with all associated site works
Abbeyhalfquarter , IDA Industrial Estate , Bunree
REVISE SITE BOUNDARIES AND TO RETAIN THE FOLLOWING ALTERATIONS TO THE DEVELOPMENT WHICH WAS PREVIOUSLY GRANTED PERMISSION UNDER P16/673 AND P19/1002, THE ALTERATIONS TO BE RETAINED ARE: RETAIN EXISTING FENCING, RETAIN EXTERNAL STORAGE AREAS, RETAIN MINOR ALTERATIONS TO INTERNAL OFFICE LAYOUT AND ELEVATIONS, RETAIN LANDSCAPING BERM, RETAIN ACCESS BARRIER LOCATION, RETAIN MINOR ALTERATIONS TO PARKING LAYOUT, TOGETHER WITH ALL ASSOCIATED SITE WORKS
IDA INDUSTRIAL ESTATE , BUNREE , BALLINA
CHANGE OF USE OF PART OF EXISTING BUILDING TO RETAIL USE. PERMISSION IS ALSO SOUGHT FOR EXTERNAL SIGNAGE TO THE EXISTING FRONT ELEVATION AS SHOWN ON PLANS AND ALL ANCILLARY SITE DEVELOPMENTS
BUNREE INDUSTRIAL ESTATE , ABBEYHALFQUARTER , BALLINA
The construction of a single storey extension to the side of the existing dwelling house and for all associated site works on this site.
107 Greenhills Estate , Ballina , Co Mayo
CONSTRUCTION OF AN EXTENSION TO AN EXISTING INDUSTRIAL UNIT AND FOR RETENTION OF SIGNAGE TO THE FRONT OF THE EXISTING BUILDING
UNIT 4 BUNREE INDUSTRIAL ESTATE , BUNREE ROAD , BALLINA
Construct single storey extension to the eastern side elevation and to carry out ancillary site works
28 Greenhill Estate , Ballina , Co Mayo
to a) Subdivide the property into 2 separate properties, b) Create a new entrance and c) retain 3 number ancillary buildings on site along with all associated site works
Bunree Industrial Estate , Abbeyhalfquarter , Ballina Co. Mayo
Retain domestic shed, floor area=45m2
Abbeyhalfquarter , Ballina , Co Mayo
Retention of development. The development consisted of change of use of a single storey garage and boiler house to a bedroom and En-suite shower/W.C. and relocate boiler room to new boiler house at rear. Revised internal layout to include new bathroom with W.C. and revised fenestration to the rear elevation of the dwelling including all associated site works and services
Abbeyhalfquarter , Ballina , Co. Mayo
Planning a project of your own?
Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.
Do I Need Permission?