2560928

CONDITIONAL

Kildare - Kildare County Council

Proposed Development

for change of house design from that previously granted under planning permission reg. ref. 24/60770, and for all associated site works revisions

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Aug 2025

  2. Decision: CONDITIONAL

    2 Oct 2025

  3. Decision due

    8 Oct 2025

  4. Grant issued

    13 Nov 2025

Application Details

Location
Fodeens , Kill , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
2.832 ha
Floor Area
209.8 sq m
Residential Units
1

Timeline

Registration Date
14 August 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
2 October 2025
Grant Date
13 November 2025
Permission Expires
1 January 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

13m
2460770CONDITIONAL7 Aug 2024

for a single storey dwelling serviced with an onsite waste water treatment system to current EPA guidelines, with equine facilities comprising of; a farm building (containing 4 stables, a tack & wash room, a feed room & barn storage), to be serviced with a dung stead & effluent holding tank complete with yard area & sand arena all to the rear of the above dwelling where the dwelling & equine facilities will be accessed via a singular recessed entrance, and for all associated site works

Fodeens , Kill , Co. Kildare

406m
22323CONDITIONAL24 Mar 2022

of a garage (26.3m²) to the north of the house and a storage shed/workshop (112.4m²) to the north-west of the house

Fodeens , Kill , Co. Kildare.

412m
22257N/A9 Mar 2022

a garage (26.3m2) to the north of the house and a storage shed/workshop (112.4m2) to the north-west of the house

Fodeens , Kill , Co. Kildare.

646m
25131REFUSED31 Jul 2025

for (A) Retention of existing 3754 square meters of the hard standing area consisting of a mix of concrete, blacktop and gravel and permission for upgrading of the same hard standing area for the parking of up to twenty trucks and trailers as per this application, (B) Retention of use of same hard standing area for use of parking of up to twenty trucks and trailers, (C) The retention of 898 square meters of existing buildings, (D) The retention of use for these same buildings at C above for use for overnight parking of trucks and trailers and the storage of dry spare parts, components and towing equipment necessary for the trucks and trailers, (E) Retention of the use of a drive which serves the home of the directors of Kill Haulage as a means of access to the public road from the hard standing areas and buildings, the subject of this application, (F) All ancillary works

Porterstown , Kill , Co. Kildare

901m
191370CONDITIONAL10 Dec 2019

to construct: (1) A water storage tank 14.70m in diameter and 2.30m in height; (2) A storage container with area of 15sqm for associated plant and all associated siteworks. Revised by significant further information consisting of; revised site layout including proposal to provide a new site entrance approx. 192m southwest of existing entrance and 2 no. existing entrances to be closed

Fodeens , Kill , Co. Kildare.

1.0km
171376CONDITIONAL6 Dec 2017

construction of a detached dwelling (part single/part two-storey) with waste water treatment plant and percolation area, associated landscaping and boundary treatment works, a new single storey garage and alterations to an existing vehicular entrance off of the road at Willow Lodge

Porterstown , Kill , Co. Kildare Y2D 9W91.

1.2km
2460947N/A25 Sept 2024

for the installation of a 200kWp of ground mounted solar photovoltaic (PV) panels and all associated ancillary works

Arthurstown Landfill , Kill , Co. Kildare

1.3km
2460958CONDITIONAL27 Sept 2024

for the installation of a 200kWp of ground mounted solar photovoltaic (PV) panels and all associated ancillary works

Arthurstown Landfill , Kill , Co. Kildare

1.3km
23276CONDITIONAL20 Mar 2023

for a second phase of the existing grid system services facility within the existing grid system services facility within the existing site area of c1.95 hectares, which was granted via reference number 18/247. The second phase will utilise all existing infrastructure, including the EirGrid gird connection infrastructure, site roads, 110kV substation, compounds, and all ancillary services. The proposed new works will consist of the installation and operation of battery energy units, including 1 no. customer switchgear container which will be connected to the national grid, via the existing infrastructure ,electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land at

Porterstown , Kilteel Lower , Kill

1.3km
18247CONDITIONAL9 Mar 2018

development of a grid system services facility within a total site area of up to 1.95 hectares, to include 1no. TSO compound including 1no. single storey TSO electrical substation building and 1no. single storey customer substation, 1no. customer switchgear, electrical inverter /transformer station modules, containerised battery storage modules on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and upgraded site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV security monitoring system, culverts and landscaping works and all associated ancillary infrastructure

Porterstown and Kilteel Lower , Kill , Co. Kildare