The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2560978

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

DRY BEDDED SHED AND PERMISSION FOR CONSTRUCTION OF AN AGRICULTURAL SLATTED SHED WITH UNDERGROUND TANK AND ASSOCIATED SITE DEVELOPMENT WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Jun 2025

  2. Decision: CONDITIONAL

    1 Aug 2025

  3. Decision due

    6 Aug 2025

  4. Grant issued

    3 Sept 2025

Application Details

Location
LETTERGULL , RAPHOE , LIFFORD PO
Applicant
N/A
Application Type
RETENTION
Planning Authority
Donegal County Council
Site Area
1 ha

Timeline

Registration Date
12 June 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
1 August 2025
Grant Date
3 September 2025
Permission Expires
2 September 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

619m
2460476CONDITIONAL8 Apr 2024

CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

WOODLANDS , RAPHOE , LIFFORD

875m
2150128CONDITIONAL1 Feb 2021

(1) DEMOLITION OF EXISTING AGRICULTURAL STORAGE SHED AND ERECTION OF A REPLACEMENT SLATTED COW SHED WITH UNDERGROUND EFFLUENT STORAGE TANKS (2) DEMOLITION OF EXISTING OPEN SIDE ROUND BALE STORAGE SHED AND CONSTRUCTION OF A NEW DRY BED CALVING SHED AND ALL ASSOCIATED SITE WORKS

WOODLANDS , RAPHOE , LIFFORD PO

917m
2350425CONDITIONAL31 Mar 2023

RETENTION AND COMPLETION OF AN UNFINISHED ENTRANCE AND ROADWAY

DRUMMUCKLAGH , RAPHOE , LIFFORD PO

964m
2151593CONDITIONAL9 Aug 2021

ERECTION OF AN AGRICULTURAL DRY SHED

BALLYLENNON , ST. JOHNSTON , RAPHOE

979m
1850555CONDITIONAL13 Apr 2018

CONSTRUCTION OF A ONE AND A HALF STOREY DETACHED DWELLING HOUSE AND PROVISION OF AN ON-SITE WASTEWATER TREATMENT SYSTEM TOGETHER WITH ALL ASSOCIATED SITE WORKS

DRUMMUCKLAGH , RAPHOE , LIFFORD PO

1.0km
2660788CONDITIONAL1 May 2026

DEVELOPMENT ON LANDS WITHIN AND ADJOINING THE PERMITTED LETTERGULL WIND FARM (PLANNING REF. NO. 18/50156, ACP REF. 304685-19) WHICH WILL COMPRISE OF THE PROVISION OF A RENEWABLE ENERGY DEVELOPMENT CONSISTING OF THE FOLLOWING: (1) 1 NO. WIND TURBINE WITH AN OVERALL BLADE TIP HEIGHT OF 135M, ROTOR DIAMETER OF 115M, AND A HUB HEIGHT OF 77.5M, (2) TURBINE FOUNDATION AND ASSOCIATED HARD-STANDING AREAS, (3) TEMPORARY WORKS TO THE EXISTING LETTERGULL WIND FARM SITE ACCESS (AS PERMITTED UNDER PLANNING REF. NO. 18/50156, ACP REF. 304685-19) TO FACILITATE THE CONSTRUCTION OF THE PROPOSED WIND TURBINE CONSISTING OF THE REMOVAL AND REINSTATEMENT OF FENCING AND LANDSCAPING AND TEMPORARY WIDENING OF THE SITE ACCESS JUNCTION, (4) PROVISION OF NEW SITE ACCESS TRACK CONNECTING THE PROPOSED WIND TURBINE TO THE EXISTING INTERNAL LETTERGULL WIND FARM SITE ACCESS TRACKS (AS PERMITTED UNDER PLANNING REF. NO. 18/50156, ACP REF. 304685-19), (5) TEMPORARY CONSTRUCTION COMPOUND AND TEMPORARY LAYDOWN AREA, (6) ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING CONNECTING THE PROPOSED WIND TURBINE TO THE PERMITTED ON-SITE 38KV SUBSTATION (AS PERMITTED UNDER PLANNING REF. NO. 18/50156, ACP REF. 304685-19), (7) SITE DRAINAGE, (8) ACCESS GATES, FENCING AND SIGNAGE AND (9) ALL RELATED SITE WORKS ABOVE AND BELOW GROUND AND ALL ANCILLARY DEVELOPMENT. FOLLOWING A THIRTY-YEAR OPERATIONAL LIFE FROM THE DATE OF FULL COMMISSIONING OF THE WIND TURBINE THE PROPOSED WIND TURBINE AND ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING WILL BE DECOMMISSIONED. THE DEVELOPMENT WILL BE ACCESSED VIA THE EXISTING LETTERGULL WIND FARM SITE ENTRANCE ON THE R236 REGIONAL ROAD AND EXISTING INTERNAL LETTERGULL WIND FARM SITE ACCESS TRACKS (AS PERMITTED UNDER PLANNING REF. NO. 18/50156, ACP REF. 304685-19). AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THIS APPLICATION. THE EIAR AND NIS ASSESS THE FULL EXTENT OF THE PROPOSED DEVELOPMENT AS DESCRIBED IN (1) – (9) ABOVE AS WELL AS THE TEMPORARY ACCOMMODATION WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS FROM THE PORT OF KILLYBEGS TO THE EXISTING SITE ENTRANCE VIA THE NATIONAL (N56, N15 AND N14) REGIONAL (R263 AND R236) PUBLIC ROAD NETWORK IN COUNTY DONEGAL. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

MOMEEN & LETTERGULL , LIFFORD PO , CO. DONEGAL

1.1km
1850156REFUSED7 Feb 2018

A TEN YEAR PLANNING PERMISSION FOR A WIND FARM WITH A 30 YEAR OPERATIONAL LIFE (FROM THE DATE OF COMMISSIONING OF THE ENTIRE WIND FARM) AND ALL ASSOCIATED WORKS. THE PROPOSED DEVELOPMENT WILL CONSIST OF THE FOLLOWING: UP TO 6 NO. WIND TURBINES WITH AN OVERALL BLADE TIP HEIGHT OF UP 135 METRES AND ALL ASSOCIATED FOUNDATIONS AND HARD-STANDING AREAS, 1 NO. BORROW PIT, 1 NO. PERMANENT ANEMOMETRY MAST UP TO A HEIGHT OF 100 METRES, UPGRADE OF EXISTING AND PROVISION OF NEW SITE ACCESS ROADS AND ASSOCIATED DRAINAGE, 1 NO. ELECTRICAL SUBSTATION COMPOUND, WHICH WILL HAVE 1 NO. CONTROL BUILDING, ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT, AND A WASTE WATER HOLDING TANK. 1 NO. TEMPORARY CONSTRUCTION COMPOUND, ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING CONNECTING THE TURBINES TO THE PROPOSED ON-SITE SUBSTATION, AS WELL AS ON-SITE UNDERGROUND CABLING TO FACILITATE ELECTRICAL CONNECTION TO THE NATIONAL GRID, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS, INCLUDING AMENITY TRAILS ON WIND FARM ROADS, CAR PARKING, SEATING/BENCHES AND SIGNAGE. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAVE BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT

MOMEEN & LETTERGULL , CO. DONEGAL

1.1km
2561430CONDITIONAL19 Aug 2025

CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE, INSTALLATION OF SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS

DRUMMUCKLAGH , RAPHOE , LIFFORD PO

1.1km
2550009REFUSED17 Feb 2025

CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS

DRUMMUCKLAGH , RAPHOE , LIFFORD PO

1.1km
2050328CONDITIONAL13 Mar 2020

CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS

DRUMMUCKLAGH , RAPHOE , LIFFORD PO

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?