2561007
N/ATipperary - Tipperary County Council
Proposed Development
converting and renovating the commercial area previously used as kitchen and restaurant into 3-bedroom apartment - no external works or structural changes
View the full application file on the council's planning portal →Application Details
- Location
- 25-26 Thomas Street , Clonmel , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.105 ha
Timeline
- Registration Date
- 8 October 2025
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
fuel sales in existing office /storage structure, various freestanding and wall mounted signage elements, 1no above ground plastic HVO tank & dispenser, and lubricant/fuel forecourt displays.
Certa Clonmel , Thomas Street , Clonmel Co Tipperary.
• A new bus shelter and seating to replace the existing, • New Paving, kerbs, timetable signage and road resurfacing to the front of the railway station building to accommodate a new accessible bus stop, • Revised car parking layouts, footpaths and accessible set down area, • A new pedestrian crossing within the site, • New steps and ramp with balustrade within the site leading from the station to Thomas Street, • A new pedestrian crossing at Thomas Street • New bicycle stands, • New lighting along with • All required ancillary works to facilitate the above. Clonmel Railway Station is a protected structure
Clonmel Railway Station , Thomas Street Clonmel , Co. Tipperary
demolition of existing buildings and construction of 60 dwellings comprising of 20 apartments in 2 no. 3 storey blocks and 40 houses in 10 no. 2 storey blocks using existing entrance from public road, connection to public services, carparking, roads, footpaths, open space areas and ancillary site development works
Thomas Street , Clonmel , Co. Tipperary
demolition of existing buildings, construction of 35 no. dwelling houses, re-located entrance from public road, connection to public services, car parking, roads, footpaths, open space areas and ancillary and site development works
Thomas Street , Clonmel , Co. Tipperary
the demolition of 7 no. storage buildings, alterations & extension to 2 no. existing buildings ( 1 no. single storey & 1 no. 2-storey) to provide a crèche, a Gymnasium & an Indoor Children's Play Facility, construction of 12 apartments in a detached 2-storey building, construction of 33 no. dwelling houses, relocated entrance from the public road, connection to the public services, car-parking, roads, footpaths, open space areas and ancillary site development works
Thomas Street , Clonmel , Co. Tipperary
change of use from commercial to shop with deli and off license areas and Permission for new shop front, signage, extract ventilation flue, external air conditioning unit and all associated site development works
Unit No. 3 , The Ormonde Centre , Thomas Street Clonmel
demolition of existing buildings and construction of 60 dwellings comprising of 20 apartments in 2 no. 3 storey blocks and 40 houses in 10 no. 2 storey blocks using existing entrance from public road, connection to public services, carparking, roads, footpaths, open space areas and ancillary site development works
Thomas Court , Thomas Street , Clonmel
the changes to previously approved Planning Permission (Ref. no. 20/283) for a residential development. The proposed changes consist of: a) changes to the finished floor levels of house numbers 01 to 41, b) redesign of the foul drainage and adjustments to the ground levels, c) relocation and redesign of the turning head and green space to the Eastern corner of the site including changes to ground levels, d) re-location of the car parking for house number 30 and changes to visitor parking, e) changes and alterations to the as-built concrete retaining wall along the Southeastern boundary. f) RETENTION PERMISSION for the as-built concrete retaining wall along the Northern boundary
Thomas Street , Clonmel , Co. Tipperary
demolition of existing buildings, construction of 35 no. dwelling houses, re-located entrance from public road, connection to public services, car parking, roads, footpaths, open space areas and ancillary and site development works
Thomas Street , Clonmel , Co. Tipperary
the temporary use of land (5 years) as a building contractor storage compound and associated works
Burgagery Lands West , Clonmel , Co. Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?