2561042
CONDITIONALKerry - Kerry County Council
Proposed Development
Full planning permission to (A) construct new dwelling house and (B) construct new septic tank and percolation area along with all ancillary site services at Coolroe Upper, Glenbeigh, Co.Kerry
View the full application file on the council's planning portal →Application Timeline
Application received
10 Nov 2025
Decision due
13 Jan 2026
Decision: CONDITIONAL
13 Jan 2026
Grant issued
16 Feb 2026
Application Details
- Location
- Coolroe Upper , Glenbeigh , Co.Kerry
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kerry County Council
- Site Area
- 0.204 ha
Timeline
- Registration Date
- 10 November 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 13 January 2026
- Grant Date
- 16 February 2026
- Permission Expires
- 15 February 2031
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCT A 4 BEDROOM SINGLE STOREY TIMBER FRAME DWELLING, ENTRANCE , STORAGE SHED, EFFLEUNT TREATMENT SYSTEM WITH ASSOCIATED WORKS
PILGRIM HILL , KILMORNA , LISTOWEL
FOR CHANGE OF DESIGN TO THE SUBSTATION COMPOUND PERMITTED CARE OF REG NO 18/931, CREATING 2 NO COMPOUND AREAS; ESB COMPOUND AND IPP COMPOUND AND A SEPERATE CONTROL BUILDING WITHIN EACH COMPOUND, SEPERATE ENTRANCE GATES AND ALL ASSOCIATED SITE WORKS
SHRONEBEIRNE , LISTOWEL , CO KERRY
CHANGE OF DESIGN TO SUBSTATION BUILDING WITHIN PLANNING REFERENCE 18/847. THE NEW BUILDING DESIGN WILL INCORPORATE A 23% REDUCTION OF PLAN AREA AND A REDUCED HEIGHT. THE PERMITTED BUILDING WILL BE SPILT INTO TWO AND LOCATED ON A SIMILAR FOOTPRINT TO THE ORIGINAL ON LANDS
SHRONEBEIRNE , LISTOWEL , CO KERRY
CONSTRUCT A BATTERY STORAGE FACILITY WITHIN A TOTAL SITE AREA OF 2.178HA, TO INCLUDE 60 NO SELF-CONTAINED BATTERY UNITS WITH ASSOCIATED HVAC COOLING UNITS, 14 CONVERTER AND 14 STEP UP TRANSFORMER CONTAINER UNITS, ASSOCIATED COMPOUND CABLING AND DUCTING, A GRID TRANSFORMER, TWO SINGLE STOREY SUBSTATION/CONTROL BUILDINGS WITH WELFARE FACILITIES, A FOUL WATER HOLDING TANK, A CABLE ROUTE GRID CONNECTION TO THE ADJACENT ESB SUBSTATION, MAINTENANCE LIGHTING, SECURITY FENCING, A CCTV MONITORING SYSTEM, LANDSCAPING WORKS AND ALL ASSOCIATED ANCILLARY INFRASTRUCTURE NECESSARY TO FACILITATE THE DEVELOPMENT ON LANDS. A NATURA IMPACE STATEMENT HAS BEEN SUBMITTED WITH THIS APPLICATION
SHRONEBEIRNE , LISTOWEL , CO KERRY
CONSTRUCT A BATTERY STORAGE FACILITY WITHIN A TOTAL SITE AREA OF UP TO 2.178HA, TO INCLUDE 60 NO SELF-CONTAINED BATTERY CONTAINER UNITS WITH ASSOCIATED HVAC COOLING UNITS, 14 CONVERTER AND 14 STEP UP TRANSFORMER CONTAINER UNITS, ASSOCIATED COMPOUND CABLING AND DUCTING, A GRID TRANSFORMER, A SINGLE STOREY SUBSTATION/CONTROL BUILDING WITH WELFARE FACILITIES , A FOUL WATER HOLDING TANK, A CABLE ROUTE GRID CONNECTION TO THE ADJACENT ESB SUBSTATION, MAINTENANCE LIGHTING , SECURITY F3ENCING, A CCTV MONITORING SYSTEM , LANDSCAPING WORKS AND ALL ASSOCIATED ANCILLARY INFRASTRUCTURE ON LANDS
SHRONEBEIRNE , LISTOWEL , CO KERRY
CONSTRUCT A BATTERY STORAGE FACILITY WITHIN A TOTAL SITE AREA UP TO 2.178HA, TO INCLUDE 60 NO SELF-CONTAINED BATTERY CONTAINER UNITS WITH ASSOCIATED HVAC COOLING UNITS, 14 CONVERTER AND 14 STEP UP TRANSFORMER CONTAINER UNITS, ASSOCIATED COMPOUND CABLING AND DUCTING, A GRID TRANSFORMER , A SINGLE STOREY SUBSTATION/CONTROL BUILDING WITH WELFARE FACILITIES, A FOUL WATER HOLDING TANK , A CABLE ROUTE GRID CONNECTION TO THE ADJACENT ESB SUBSTATION , MAINTENANCE LIGHTING, SECURITY FENCING , A CCTV MONITORING SYSTEM, LANDSCAPING WORKS AND ALL ASSOCIATED ANCILLARY INFRASTRUCTURE ON LANDS. A TEN YEAR PLANNING PERMISSION IS BEING SOUGHT TO CONSTRUCT THE DEVELOPMENT
SHRONEBEIRNE , LISTOWEL , CO. KERRY
INVALID APPLICATION
SHRONEBEIRNE , LISTOWEL , CO KERRY
permission to construct a battery storage facility including self-contained battery units with associated HVAC cooling and inverter equipment, associated compound cabling and ducting, electrical substation including grid transformer and single storey control building with welfare facilities, a foul water holding tank, an underground cable route grid connection to the adjacent ESB substation, maintenance lighting, security fencing, a CCTV monitoring system, landscaping works and all associated ancillary infrastructure necessary to facilitate the development on lands at Shronebeirne, Listowel, Co. Kerry. A Natura Impact Statement (NIS) was prepared in respect of the proposed development and accompanies the application.
Shronebeirne , Listowel , Co. Kerry
RETAIN HIS DOMESTIC GARAGE AS CONSTRUCTED ON HIS SITE
LACKA EAST , KILMORNA , LISTOWEL
CONSTRUCT A FARM STORAGE SHED AND ALL ASSOCIATED SITE WORKS
TRIEN , KILMORNA , LISTOWEL
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?