2561076
CONDITIONALDonegal - Donegal County Council
Proposed Development
OVERFLOW CARPARK WHICH SERVES LETTERKENNY ACTIVITY CENTRE
View the full application file on the council's planning portal →Application Timeline
Application received
26 Jun 2025
Decision: CONDITIONAL
14 Aug 2025
Decision due
20 Aug 2025
Grant issued
17 Sept 2025
Application Details
- Location
- BALLYMALEEL , LETTERKENNY , CO. DONEGAL
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Donegal County Council
- Site Area
- 0.13 ha
Timeline
- Registration Date
- 26 June 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 August 2025
- Grant Date
- 17 September 2025
- Permission Expires
- 16 September 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCTION OF A NEW DWELLING HOUSE WITH GARAGE & SEWAGE TREATMENT SYSTEM
BALLYMALEEL , LETTERKENNY , LETTERKENNY PO
(1) A SMOKING AREA WITH SLATE ROOF AND STONE CLAD PILLARS AND (2) A 1.0 METER WIDE GLASS CANOPY OVER THE 'SHOP FRONT' CLADDING AROUND THE BAR ENTRANCE
THE SILVER TASSIE HOTEL , BALLYBOEN-CURRAGH , LETTERKENNY
ERECTION OF A SMOKING AREA AND A GLASS CANOPY TO THE FRONT OF THE EXISTING SILVER HOTEL TASSIE. THE DEVELOPMENT CONSIST OF THE FOLLOWING: (1) A SMOKING AREA WITH SLATE ROOF & STONE CLAD PILLARS AND (2) A 1.0 METER WIDE GLASS CANOPY OVER THE 'SHOP FRONT' CLADDING AROUND THE BAR ENTRANCE
SILVER TASSIE HOTEL , BALLYMALEEL , LETTERKENNY PO
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE AND TREATMENT SYSTEM WITH POLISHING FILTER
DENNYSTOWN , LETTERKENNY , LETTERKENNY PO
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE AND TREATMENT SYSTEM WITH POLISHING FILTER
DENNYSTOWN , LETTERKENNY , LETTERKENNY PO
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE AND TREATMENT SYSTEM WITH POLISHING FILTER
DENNYSTOWN , LETTERKENNY , LETTERKENNY PO
INSTALLATION OF AN INTEGRATED CONSTRUCTED WETLAND (ICW) FOR SECONDARY TREATMENT OF WASTEWATERS GENERATED. THE EXISTING WASTEWATER SEPTIC TANK WILL BE RETAINED, AND A NEW PUMP AND ASSOCIATED INFRASTRUCTURE INSTALLED. THE EXISTING ACTIVATED SLUDGE PACKAGE PLANT AND POLISHING FILTER WILL BE DECOMMISSIONED. NEW PIPEWORK AT THE SEPTIC TANK WILL BE INSTALLED TO CONVEY WASTEWATERS FROM THE HOTEL, SPA AND ASSOCIATED BUILDINGS TO THE ICW FOR TREATMENT. THE PROPOSED INTEGRATED CONSTRUCTED WETLAND WILL DISCHARGE VIA PIPEWORK TO THE UNNAMED STREAM (IE_NW_39K240610 SEGMENT_CODE: 39_1259) A TRIBUTARY OF THE BALLYMALEEL STREAM WITHIN THE SILVER TASSIE HOTEL AND SPA OWNERSHIP BOUNDARY. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
SILVER TASSIE HOTEL & SPA , BALLYBOENCURRAGH , BALLYMALEEL LETTERKENNY PO
INSTALLATION OF AN INTEGRATED CONSTRUCTED WETLAND (ICW) FOR SECONDARY TREATMENT OF WASTEWATERS GENERATED. THE EXISTING WASTEWATER SEPTIC TANK WILL BE RETAINED, AND A NEW PUMP AND ASSOCIATED INFRASTRUCTURE INSTALLED. THE EXISTING ACTIVATED SLUDGE PACKAGE PLANT AND POLISHING FILTER WILL BE DECOMMISSIONED. NEW PIPEWORK AT THE SEPTIC TANK WILL BE INSTALLED TO CONVEY WASTEWATERS FROM THE HOTEL, SPA AND ASSOCIATED BUILDINGS TO THE ICW FOR TREATMENT. THE PROPOSED INTEGRATED CONSTRUCTED WETLAND WILL DISCHARGE VIA PIPEWORK TO THE UNNAMED STREAM (IE_NW_39K240610 SEGMENT_CODE: 39_1259) A TRIBUTARY OF THE BALLYMALEEL STREAM WITHIN THE SILVER TASSIE HOTEL AND SPA OWNERSHIP BOUNDARY. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
SILVER TASSIE HOTEL & SPA , BALLYBOENCURRAGH , BALLYMALEEL LETTERKENNY PO
CONSTRUCTION OF A TWO STOREY DWELLING, DOMESTIC GARAGE AND TREATMENT SYSTEM WITH POLISHING FILTER
DEENYSTOWN , LETTERKENNY , CO DONEGAL
CONSTRUCTION OF A PART SINGLE STOREY, PART STOREY AND A HALF DETACHED DOMESTIC DWELLING, DETACHED DOMESTIC GARAGE, PROVISION OF A WATERWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
BALLYMALEEL , LETTERKENNY , CO DONEGAL
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?