2561131
N/AGalway - Galway County Council
Proposed Development
for change of use of part of the existing dwelling, as retained and granted under Planning Ref. 25/60386, to allow for subdivision into two independent residential units and all ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
15 Aug 2025
Application withdrawn
22 Sept 2025
Decision due
9 Oct 2025
Application Details
- Location
- Gort , Gort , Co. Galway
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Galway County Council
- Site Area
- 0.1 ha
- Floor Area
- 51 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 15 August 2025
- Status
- WITHDRAWN
- Decision
- N/A
- Decision Due
- 9 October 2025
- Withdrawn
- 22 September 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
of the sub-division of the property into two individual living units and all ancillary site works
Gort , Gort , Co. Galway
and completion of the conversion of the side garage to living quarters which is attached to the dwelling house, retain and complete the extension to the dwelling house, retain the new slates erected on the roof of the existing dwelling house and all ancillary site works
Gort , Gort , Co. Galway
for the change of use of a semi-detached house to office space and join with the existing Gort Cancer Support Centre building. Gross floor space of proposed works: 118.3 sqm
Ballyhugh ,
of 1 to 4 Cillin Court on revised site boundaries to that previously granted under 06/4518
Ballyhugh , Church St. Gort , Co. Galway
permission for the conversion of attic storage space to living accommodation in an existing dwelling house. Gross floor space of work to be retained 48.2sqm.
Ballyhugh ,
for the construction of 5 serviced townhouses with associated parking and all associated site development works. Gross floor space of proposed works: 520.8 sqm
Ballyhugh ,
for the construction of 4 serviced town houses. Gross floor space of proposed works; 350.05sqm
Church St , Gort
for the construction of a granny flat extension and all associated works
Ballyhugh , 21 Gort na Rí , Gort
for (1). change of use of ground floor units No. 1 & No.3 from commercial to Preschool and after School service and (2). amalgamation of units No1. & No. 3 (3) All associated site works and services. Gross floor space of existing units 169.9 sqm
Ballyhugh ,
for the unauthorized developments and permission for new development. The unauthorized development consists of: existing enclosed porch on the NE side of the previously constructed rear extension; polythene enclosed lean-to greenhouse; domestic storage shed. The new development consists of: redevelopment of the existing house will include changes to the fenestration on the SE, SW and NW elevations; removal of 2 chimneys; construction of a new domestic storage shed; construction of a conservatory and porch on the SW side of the existing residence
Gort , Garrabeg , Gort
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?