The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2561217

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Jul 2025

  2. Further information requested

    28 Aug 2025

  3. Further information received

    29 Oct 2025

  4. Decision: CONDITIONAL

    13 Nov 2025

  5. Decision due

    25 Nov 2025

  6. Grant issued

    17 Dec 2025

Application Details

Location
BALLYCONNELLY , RAMELTON , LETTERKENNY PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.95 ha
Floor Area
81 sq m
Residential Units
1

Timeline

Registration Date
16 July 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
13 November 2025
Grant Date
17 December 2025
Permission Expires
16 December 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

580m
2051157CONDITIONAL25 Aug 2020

1)CONSTRUCTION OF A NEW WASTEWATER TREATMENT PLANT (WWTP) IN THE TOWNLAND OF TIRRODDY WITH ASSOCIATED AND ANCILLARY DEVELOPMENT WORKS INCLUDING INTERNAL ACCESS ROAD, INLET WORKS, WWTP PROCESS TANKS, SLUDGE STORAGE TANKS, CHEMICAL STORAGE TANKS, ANCILLARY TREATMENT UNITS, ADMINISTRATION & ESB SUB-STATION BUILDING, SLUDGE PRESS BUILDING, INTERNAL PUMPING STATIONS, SURFACE WATER ATTENUATION POND, 2.4M HIGH BOUNDARY FENCE AROUND THE PERIMITER OF THE WWTP WORKS, 1.2M FENCING AROUND THE SITE BOUNDARY, ENTRANCE VIA AN EXISTING COILLTE ROADWAY AND ENTRANCE ONTO L-5612-1 AND WIDENING AND STRENGHTENING OF L-5612-1 2)CONSTRUCTION OF APPROXIMATELY 1,590M OF TREATED EFFLUENT OUTFALL PIPELINE IN THE TOWNLANDS OF TIRRODDY AND BROWNKNOE, INCLUDING APPROXIMATELY 160M MARINE SECTION & OUTFALL DIFFUSER LOCATED IN LOUGH SWILLY3) CONSTRUCTION OF 1 NO. MAIN WASTEWATER PUMPING STATION AT RAMELTON IN THE TOWNLAND OF RAMELTON INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, DEMOLITION OF EXISTING SINGLE-STOREY BUILDING, FLOOD PROTECTION MEASURES, BELOW GROUND STORAGE TANK & STRUCTURES, PUMP HOUSE BUILDING, ESB SUB-STATION UNIT, RUBBLE STONE PERIMITER WALLS, NEW ENTRANCE ONTO CASTLE STREET, RECONSTRUCTION OF AN EXISTING STONE BOUNDARY WALL APPROXIMATELY 15M LONG ALONg CASTLE STREET AND CONNECTION TO EXISTING STORM OUTFALLS 4)CONSTRUCTION OF 1 NO. MAIN WASTEWATER PUMPING STATION AT RATHMULLAN IN THE TOWNLAND OF RATHMULLAN & BALLYBOE INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, FLOOD PROTECTION MEASURES, BELOW GROUND STORAGE TANK & STRUCTURES, PUMP HOUSE BUILDING, RUBBLE STONE PERIMETER WALLS, ESB SUB-STATION UNIT, DEMOLITION OF AN EXISTING SUBTERRANEAN MUNICIPAL SEPTIC TANK, NEW TURNING HAMMERHEAD AT THE END OF THE EXISTING TURNING CIRCLE AT ABBEY VIEW ESTATE, NEW ENTRANCE TO ABBEY VIEW ESTATE, TEMPORARY WORKING AREA DURING CONSTRUCTION AND CONNECTION TO EXISTING STORM OUTFALLS 5)CONSTRUCTION OF 1 NO. NETWORK WASTEWATER PUMPING STATION AT RATHMULLAN IN THE TOWNLAND OF RATHMULLAN & BALLYBOE INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, FLOOD PROTECTION MEASURES, BELOW GROUND PUMPING STATION, STORAGE TANK & STRUCTURES, LOW-LEVEL CONTROL KIOSK, 7.6M HIGH ORNATE VENTILATION STACK, RUBBLE STONE PERIMETER WALLS, DEMOLITION OF AN EXISTING SUBTERRANEAN MUNICIPAL SEPTIC TANK, NEW ENTRANCE ONTO MAIN STREET, TEMPORARY WORKING AREA DURING CONSTRUCTION, TEMPORARY ENTRANCE ONTO MAIN STREET DURING CONSTRUCTION, RELOCATION AND UPGRADING OF EXISTING STORM DRAIN AND CONNECTION TO EXISTING STORM OUTFALL......

RAMELTON MILFORD AND RATHMULLAN , CO DONEGAL

814m
1850743CONDITIONAL11 May 2018

ERECTION OF A DWELLING, DOMESTIC GARAGE AND WASTEWATER TREATMENT SYSTEM WITH ASSOCIATED SITE WORKS

LONGHILL , RAMELTON , LETTERKENNY PO

831m
2351149CONDITIONAL2 Aug 2023

ERECTION OF NEW EXTENSION TO SIDE OF EXISTING DWELLING HOUSE AND CONNECTION TO ALL EXISTING SERVICES

DRUMACLOGHAN , GLENALLA , LETTERKENNY PO

846m
2562151CONDITIONAL5 Dec 2025

ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE INCLUDING PROVISION OF A TEMPORARY MOBILE HOME FOR THE CONSTRUCTION PERIOD OF THE DWELLING HOUSE WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

CARN HIGH , RAMELTON , LETTERKENNY PO

866m
2051786CONDITIONAL25 Nov 2020

CONSTRUCTION OF A DWELLING HOUSE WITH SEPTIC TANK AND A DOMESTIC SHED INCLUDING ALL OTHER ASSOCIATED SITE WORKS

GLENTIDALLY , MILFORD , LETTERKENNY PO

878m
1751090CONDITIONAL10 Jul 2017

ERECTION OF DWELLING HOUSE WITH WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA (OUTLINE PLANNING PERMISSION REF. NO. 14/51285 REFERS)

CARN HIGH TD , RAMELTON , LETTERKENNY PO

878m
1751011N/A26 Jun 2017

ERECTION OF DWELLING HOUSE WITH WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA (OUTLINE PLANNING PERMISSION REF. NO. 14/51285 REFERS)

CARN HIGH TD , RAMELTON , LETTERKENNY PO

907m
2660135CONDITIONAL4 Feb 2026

(1) EXTENSION TO REAR OF DWELLING HOUSE, (2) EXTENSION TO DOMESTIC GARAGE, (3) OUTDOOR STORAGE, (4) FIRST FLOOR LIVING SPACE AND (5) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

CARN HIGH , RAMELTON , LETTERKENNY PO

937m
2250369CONDITIONAL2 Mar 2022

CONSTRUCTION OF A DORMER STYLE BUNGALOW TYPE DWELLING HOUSE WITH ATTIC ROOMS INCORPORATED DETACHED GARAGE/STORE AND PROPRIETARY WASTE WATER TREATMENT SYSTEM & ASSOCIATED SOIL POLISHING / PERCOLATION AREA & ALL OTHER ASSOCIATED SITE WORKS

DRUMACLOGHAN , RAY , LETTERKENNY PO

987m
2460241CONDITIONAL28 Feb 2024

CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC SHED AND SEPTIC TANK

DRUMACLOGHAN , RAY , RAMELTON

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?