2561305
N/ALimerick - Limerick County Council
Proposed Development
erection of a Domestic Bungalow Dwelling, Entrance Gates & Piers, Secondary Treatment System and Polishing filter and connections to all existing services and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
10 Dec 2025
Application withdrawn
9 Feb 2026
Decision due
12 Feb 2026
Application Details
- Location
- Ardlaman , Rathkeale , Co. Limerick
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
- Site Area
- 0.214 ha
- Floor Area
- 168 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 10 December 2025
- Status
- WITHDRAWN
- Decision
- N/A
- Decision Due
- 12 February 2026
- Withdrawn
- 9 February 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of new boundary walls and entrance gate, concrete yard and hardcore limestone yard all at my property
Ardlaman , Rathkeale , Co. Limerick
a kitchen dining room extension to existing dwelling house
Ardlaman , Rathkeale , Co. Limerick.
an extension to the north side of existing public house and 2 no. 20' steel containers and permission to redesign existing toilets to incorporate new accessible toilet, new smoking area, convert part of existing residential area to new lounge area with accessible toilets, remove existing door on west elevation and replace with a window and to construct a new extension to dwelling
Ballyann , Askeaton , Co. Limerick.
the construction of a slatted shed, feed passages, manure pit and concrete apron within the curtilage of a protected structure
Riddlestown , Rathkeale , Co. Limerick.
a dwelling house, garage, entrance, boundary walls an onsite waste water treatment and disposal system and all associated works
Riddlestown , Rathkeale , Co. Limerick.
the development that will consist of: A 10-year permission for the development of a solar farm on a site of 63.4 hectares consisting of the following: 301,000 sqm of solar photovoltaic panels on ground mounted steel frames; 10 hardstanding locations for electrical skids; new internal access tracks; underground power and communications cables and ducts; a new access from the L1219 public road; access gates; landscaping and biodiversity enhancement measures; security gates; boundary fencing and all associated ancillary development, site works and services. Installations of internal network cable to facilitate a future under-the fence connection from an on-site transformer compound to the existing Rathkeale 110kV substation which is located adjacent to the site. The on-site transformer compound will enclose an Independent Power Producer Building of 30.8 sqm, a 110 kV transformer, an 18 m high lightning monopole mast, and associated ancillary development. The solar farm will be operational for 40 years
Townland of Ardgoulbeg , near Rathkeale , Co. Limerick
the construction of a seven unit glamping facility incorporating the conversion of an existing cottage to toilet and kitchen area, installation of a proprietary waste water system and all associated services
Kilcool , Rathkeale , Co. Limerick.
(a) the conversion of existing domestic garage to habitable space, consisting of kitchen utility, wc and living area, revised elevations to incorporate new windows and doors. (b) construction of a link corridor from the existing dwelling to the converted garage, (c) construction of entrance porch to dwelling, all associated ancillary site works and services
Riddlestown Cottage , Riddlestown , Rathkeale Co. Limerick.
construction of a new dwelling house, detached garage, site entrance, waste water treatment system, percolation area and all associated site works
Riddlestown , Rathkeale , Co. Limerick
a dwelling house, waste water treatment system, percolation area, site entrance and all associated site works
Cooltomin , Rathkeale , Co. Limerick
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?