2561453
N/ADonegal - Donegal County Council
Proposed Development
RELOCATION OF DWELLING FROM LOCATION SHOWN ON ORIGINAL PLANNING APPLICATION REF. NO. 96/1751 AND PERMISSION FOR RETENTION AND COMPLETION OF FIRST FLOOR RENOVATION
View the full application file on the council's planning portal →Application Timeline
Application received
22 Aug 2025
Application withdrawn
1 Oct 2025
Decision due
16 Oct 2025
Application Details
- Location
- DRUMATOLAND , ST. JOHNSTONE , LIFFORD PO
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Donegal County Council
- Site Area
- 0.423 ha
- Floor Area
- 161.1 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 22 August 2025
- Status
- WITHDRAWN
- Decision
- N/A
- Decision Due
- 16 October 2025
- Withdrawn
- 1 October 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
DWELLING INCLUDING RELOCATION OF THE DWELLING GRANTED UNDER PLANNING REF. NO. 96/1751 ALONG WITH FIRST FLOOR RENOVATION WHICH CONSISTS OF 2 NO. BEDROOMS AND 1 NO. BATHROOM AND PERMISSION FOR REPLACEMENT OF ON-SITE WASTEWATER TREATMENT PLANT
DRUMATOLAND , ST. JOHNSTONE , LIFFORD PO
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
MOMEEN , ST. JOHNSON , LIFFORD PO
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATEMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
MOMEEN , ST JOHNSTON , LIFFORD PO
DEMOLITION OF EXISTING RUINS AND ERECTION OF NEW DWELLING HOUSE WITH SEPTIC TANK
DRUMATOLAND , ST. JOHNSTON , LIFFORD PO
(1) CONSTRUCTION OF AN EXTENSION TO THE SIDE ELEVATION AND PROVISION FOR A PITCHED ROOF OVER EXISTING REAR EXTENSION INCORPORATING MINOR ELEVATIONAL AMENDMENTS (2) DEVELOPMENT OF A ROOF DORMER TO FRONT ELEVATION AND CONVERSION OF EXISTING ATTIC SPACE INTO HABITABLE AREA INCORPORATING ROOFLIGHTS AND (3) DEVELOPMENT OF A NEW PERCOLATION AREA CONNECTED INTO EXISTING SEPTIC TANK SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
MOMEEN , ST. JOHNSTON , LIFFORD P.O.
USE OF 5 NUMBER EXISTING AGRICULTURAL SHEDS WITHIN FARMYARD COMPLEX FOR WASTE RECOVERY PURPOSES TO INCLUDE RECEPTION, STORAGE AND TREATMENT OF WATER CLARIFICATION SLUDGES AND BIO WASTE PRODUCTS PRIOR TO LAND SPREADING WITHIN LANDHOLDING. THE PROPOSAL SHALL INCLUDE THE FOLLOWING (A) PROPOSED DRAINAGE PROVISION ON SITE FOR COLLECTION OF RUN OFF TO A PROPOSED COLLECTION TANK AND (B) PROVISION WITHIN ONE OF THE EXISTING SHEDS FOR BALING AND TEMPORARY STORAGE OF RECYCLABLE CARTONS AND CONTAINERS FOR RECYCLING PURPOSES OFF SITE AND (C) ASSOCIATED SITE AND ANCILLARY DEVELOPMENT WORKS
MOMEEN , ST. JOHNSTON , LIFFORD PO
USE OF 5 NUMBER EXISTING AGRICULTURAL SHEDS WITHIN FARMYARD COMPLEX FOR WASTE RECOVERY PURPOSES TO INCLUDE RECEPTION, STORAGE AND TREATMENT OF BIO WASTE PRODUCTS PRIOR TO LAND SPREADING WITHIN LANDHOLDING. THE PROPOSAL SHALL INCLUDE THE FOLLOWING (A) PROPOSED DRAINAGE PROVISION ON SITE FOR COLLECTION OF RUN OFF TO A PROPOSED COLLECTION TANK AND (B) PROVISION WITHIN ONE OF THE EXISTING SHEDS FOR BALING AND TEMPORARY STORAGE OF RECYCLABLE CARTONS AND CONTAINERS FOR RECYCLING PURPOSES OFF SITE AND (C) ASSOCIATED SITE AND ANCILLARY DEVELOPMENT WORKS
MOMEEN , ST. JOHNSTON , LIFFORD P.O.
USE OF 5 NO. EXISTING AGRICULTURAL SHEDS WITHIN FARMYARD COMPLEX FOR WASTE RECOVERY PURPOSES TO INCLUDE RECEPTION, STORAGE AND TREATMENT OF WATER CLARIFICATION SLUDGES AND BIO WASTE PRODUCTS PRIOR TO LAND SPREADING WITHIN LAND HOLDING. THE PROPOSAL SHALL INCLUDE THE FOLLOWING (a) PROPOSED DRAINAGE PROVISION ON SITE FOR COLLECTION OF RUN OFF TO A PROPOSED COLLECTION TANK AND (b) PROVISION WITHIN ONE OF THE EXISTING SHEDS FOR BALING AND TEMPORARY STORAGE OF RECYCLABLE CARTONS AND CONTAINERS FOR RECYCLING PURPOSES OFF SITE AND (c) ASSOCIATED SITE AND ANCILLARY DEVELOPMENT WORKS
MOMEEN , ST. JOHNSTON , LIFFORD PO
RENOVATION AND CONSTRUCTION OF EXTENSION TO EXISTING DERELICT COTTAGE WITH ALL ASSOCIATED WORKS AND CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA
CARRICKADAWSON , RAHPOE , LIFFORD PO
CONSTRUCTION OF AN EXTENSION TO EXISTING SLATTED SHED AND ALL ASSOCISTED SITE DEVELOPMENT WORKS
SHESKINAPOLL , RAPHOE , LIFFORD PO
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?