2570
N/ALaois - Laois County Council
Proposed Development
planning on previously granted planning for 6 no floodlights and all ancillary associated siteworks.
View the full application file on the council's planning portal →Application Details
- Location
- Russ Ave , Mountrah , Co. Laois
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Laois County Council
Timeline
- Registration Date
- 22 August 2025
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
previously granted permission for 6 no. floodlights and all associated site works
Russ Ave , Mountrath , Co Laois
install 6 no floodlights and all associated siteworks.
Russ Ave , Mountrath , Co. Laois
retain (a) wall between carpark and pitch 2m high, (b) storage shed (c) scoreboard, (d) 1 m high fence surrounding pitch (e) dugouts on either side of pitch (f) 3 flag poles (g) ballwall (h) drainage work on left hand side of pitch for development of second pitch as a training/underage pitch.
Russ Avenue , Mountrath , Co. Laois
(a) Astroturf area, associated lighting and fencing (b) lighting for main pitch 4 mo. lighting on both sides. the removal of the Portacabin, construct a small shed and all associated site works.
Russ Avenue , Mountrath , Co. Laois
(a) Astroturf area, associated lighting and fencing (b) lighting for main pitch 4 No. lighting on both sides, the removal of the Portacabin, construct a small shed and all associated site works
Russ Avenue , Mountrath , Co. Laois
retain (a) wall between carpark and pitch 2m high, (b) storage shed (c) scoreboard, (d) 1 m high fence surrounding pitch (e) dugouts on either side of pitch (f) 3 flag poles (g) balwall (h) drainage work on left hand side of pitch for development of second pitch as a training/enderage pitch. Included in the applications is a NIS (Natural Impact Statement)
Russ Avenue , Mountrath , Co. Laois
construct a 30m monopole tower carrying telecommunications equipment, together with associated equipment and cabinets enclosed within a 2.4m palisade fence compound
St Fintan's GAA Club , Mountrath , Co. Laois
change use of an existing workshop building to a single family two bedroom dwelling, consisting of alterations and refurbishment of the exterior and interior of the existing building (79m2) including new windows, new roof and rainwater goods. Construction of a new internal mezzanine floor (39m2), Provision of solar panels to the south pitch of the roof; Modification of the front boundary wall; Provision of a soakaway for surface water drainage; Provision of a new water supply and foul connection; Provision of hard and soft landscaping, and all ancillary works necessary to facilitate the development
Parnell Lane , Mountrath , Co. Laois
change use of an existing workshop building to a single family two bedroom dwelling, consisting of alterations and refurbishment of the exterior and interior of the existing building (79m2) including new windows, new roof and rainwater goods. Construction of a new internal mezzanine floor (39m2), Provision of solar panels to the south pitch of the roof; Modification of the front boundary wall; Provision of a soakaway for surface water drainage; Provision of a new water supply and foul connection; Provision of hard and soft landscaping, and all ancillary works necessary to facilitate the development
Parnell Lane , Mountrath , Co. Laois
construct a single storey dwelling, single storey domestic garage, connection to existing water mains and foul sewer line, proposed new entrance and all ancillary site works. The application is accompanied by a nature impact Statement (NIS) and have been prepared in respect of the proposed development
Stillbrook , Mountrath , Co. Laois
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.