26/1702
Awaiting F.I. ResponseCork - Cork County Council
Proposed Development
FOR THE CONSTRUCTION OF TELECOMMUNICATIONS INFRASTRUCTURE COMPRISING A 24 METRE HIGH LATTICE TOWER CARRYING ANTENNAS, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT, TOGETHER WITH GROUND LEVEL EQUIPMENT CABINETS, FENCING AND ALL ASSOCIATED SITE WORKS
View the full application file on the council's planning portal →Application Details
- Location
- Dromsligo, Mallow, County Cork
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 25 June 2026
- Status
- Awaiting F.I. Response
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
FOR THE CONSTRUCTION OF TELECOMMUNICATIONS INFRASTRUCTURE COMPRISING A 24 METRE HIGH LATTICE TOWER CARRYING ANTENNAS, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT, TOGETHER WITH GROUND LEVEL EQUIPMENT CABINETS, FENCING AND ALL ASSOCIATED SITE WORKS
Dromsligo, Mallow, County Cork
Slatted cattle shed with underground slurry tanks, uncovered undergrund slurry tank, underground covered precast concrete soiled water tank and pumping chamber at end of existing silage slab
Dromsligo Mallow
Installation of sewage treatment unit to serve existing dwelling
Dromsligo Mallow
Sewage treatment unit to serve existing dwelling
Dromsligo Mallow
Dwelling, domestic garage and septic tank
Dromsligo Mallow
Dwelling, domestic garage & septic tank
Dromsligo Mallow
Construction of uncovered underground concrete slurry tank, underground slatted soiled water tank, concrete apron extension to existing silage slab and a cattle crush
Lodge Mallow
Construction of storage shed, change of use of underground soiled water tank to uncovered slatted slurry tank and increase in depth of tank to 2.44m
Lodge Mallow
Dwellinghouse, garage and installation of septic tank
Dromsligo Mallow
Demolition of dwellinghouse
Dromsligo Mallow
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?