The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

26/1911

Awaiting Recommendation

Cork - Cork County Council

Proposed Development

Permission for Construction of an eighty-five bed residential nursing home with ancillary facilities and associated site works to service the development. (b) Demolition of exiting petrol station, shed and ancillary structures. (c) New entrance/exit and car parking facilities. Extension of Duration to permission granted under planning Ref. No. 20/4588.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Jul 2026

  2. Decision due (upcoming)

    10 Sept 2026

Application Details

Location
The Flats, Ballymakeera, Co. Cork
Applicant
N/A
Application Type
Extension of Duration
Planning Authority
Cork County Council

Timeline

Registration Date
17 July 2026
Status
Awaiting Recommendation
Decision
Pending
Decision Due
10 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
20/4588Conditional Permission23 Mar 2020

(a) Construction of an eighty-five bed residential nursing home with ancillary facilities and associated site works to service the development. (b) Demolition of exiting petrol station, shed and ancillary structures. (c) New entrance/exit and car parking facilities.

The Flats Ballymakeera Co. Cork

2m
09/6867CONDITIONAL31 Aug 2009

Demolition of existing petrol station, shed, ancillary structures and 1no. habitable dwelling. Construction of a two-storey petrol station comprising of 2no. retail units on the ground floor & 1no. two-bed apartment, and 2no. one-bed apartments on the first floor. Construction of a sixty-two bed residential nursing home with ancillary facilities, all on the northern side of the public road, and on the southern side of the road, construction of a temporary waste water treatment plant with control house & associated site services/works to service the development

Flats Ballymakeera

3m
08/9616REFUSED7 Nov 2008

Demolition of existing petrol station, shed, ancillary structures & 1no. habitable dwelling, construction of new petrol station with a three-storey building comprising of 4no. retail units on the ground floor and 4no. two-bed apartments and storeroom on first floor, 1no. two-bed apartment & 2no. one-bed apartments on second floor to south of the site adjacent to the public road, and construction of a seventy-bed residential nursing home with ancillary facilities to the north (rear) of the site

Flats Ballymakeera Macroom

65m
17/5653CONDITIONAL30 Jun 2017

a)Demolition of existing dwelling & b)construction of 2 no. semi-detached dwellings together with associated entrances & site works.

No.2 Naomh Aban Terrace Flats, Ballymakeera Macroom Co.Cork

89m
09/5695CONDITIONAL25 May 2009

Construction of 4 no. dormer windows to front roof and retention of alteration to front elevation to include part natural stone finish to existing bungalow

Flats Ballymakeera

89m
09/5338INCOMPLETED APPLICATION29 Apr 2009

Construction of 4no. dormer windows to front of roof of existing bungalow

Flats Ballymakeera

99m
22/4165CONDITIONAL28 Jan 2022

Cead pleanála iomlán a lorg chun síneadh dhá urlár a chur leis an scoil, ag cur san áireamh, staighre éalaithe, doras éalaithe, athraithe ingearchló, ag cur fuinneog san áit ina bhfuil an doras éalaithe faoi láthair thuas staighre, chomh maith leis na hoibreacha láithreáin a bhaineann leis an suíomh - Full Planning Permission for a 2 storey extension to the school including emergency stairs and emergency exit, changes to elevations, insertion of window in place of existing emergency exit upstairs, as well as associated site works.

Scoil Abán Naofa Máigh Réidh Flats Baile Mhic Íre, Co. Chorcaí

99m
21/5249CONDITIONAL7 May 2021

Cead pleanála iomlán a lorg chun athchóiriú, méadú agus cur leis an bhfoirgneamh atá ann. San áireamh, beidh oifig nua aon úrláir á thógáil ar chúl na scoile, díonta claonta nua in áit díonta léibhéala, an simné á bhaint agus airde de bhuaic díon halla na scoile á árdú. Ina theannta beidh gá ingearchló na scoile a athrú, doras tosaigh nua don halla, cuid de falla teorainn a bhaint, chomh maith leis na hoibreacha láithreáin a bhaineann leis an suiomh. (Full Planning Permission for alterations and extension to existing school building including construction of single storey office to rear of school, new sloping roofs to replace existing level roofs, removal of chimney and raising of the apex of the school hall roof. Works will also necessitate alterations to elevations, new front door for the hall, removal of part of partition wall, as well as all associated site works).

Scoil Abán Máigh Réidh/Flats Baile Mhic íre/Ballymakeera Co. Chorcaí/Co. Cork

103m
07/13264CONDITIONAL20 Dec 2007

Demolition of existing community/school hall and construction of extension to existing national school building comprising of staff rooms, toilets, storage and remedial room and new lobby to include glazed atrium, new attached community school hall and associated site works

Flats Ballymakeera

110m
25/4385INCOMPLETED APPLICATION6 Mar 2025

Séard a bheidh sa bhfortbairt seo ná; a)Athlonnú agus Domchlá nua ar an bpáirc atá ann agus draenáil atá oirinúnach, b) Cuir insteach cosán nua, fál liontán sreinge agus tuilsoilsiú timpeall na páirce, c) Ag tógáil bothain agus binsí nua, d) Ag tógáil seastán nua, e) Dromhclá crauidh ar an gcarrclós nua, f) Soilsiú Poiblí nua timpeall an suiomh ar fad agus na suíomhanna coimhdeach ag Pairc Abán, An Portach, Baile Mhic Íre, Maigh Chromtha, Co.Chorcaí / Permission for; a) Relocation and resurfacing of the existing pitch and suitable drainage. b) Installation of a new footpath, chain link fence and floodlighting around the pitch. c) Construction of new sheds and benches. d) Construction of a new stand. e) New surface on the new car park. f) New Public Lighting around the entire site.

Pairc Abán, An Portach Baile Mhic Íre/ Ballymakerry Maigh Chromtha/ Macroom Co.Chorcaí

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?