The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

26186

N/A

Clare - Clare County Council

Proposed Development

to retain: 1. The Kitchen, covered and open seating area 2. Storage Containers (2) 3. Manager/ Security staff accommodation unit. 4. Gym for owners use. 5. Steeltech Storage Shed and for PERMISSION to install a Steeltech shed & all other associated site and ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Jul 2026

  2. Decision due

    31 Aug 2026

Application Details

Location
O'Connor's Riverside Carvan and Camping Park , Doolin , Co. Clare V95 KP99
Applicant
N/A
Application Type
RETENTION
Planning Authority
Clare County Council

Timeline

Registration Date
7 July 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
31 August 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

85m
17803CONDITIONAL19 Oct 2017

for the extension to the rear of the existing house

Doolin , Co. Clare

86m
20755CONDITIONAL16 Oct 2020

the development will consist of a dwelling house and garage, proprietary wastewater treatment system, sand polishing filter and percolation area together with ancillary works

Doolin Tld , Doolin , Co Clare

113m
19836CONDITIONAL31 Oct 2019

to RETAIN the following items which differ to that previously granted by P16/541: 1. Revised location and finished floor level of main building 2. Revisions to elevations of the main building 3. Revised locations of Waste Water Treatment System, Percolation area and car parking area 4. Retention of storage shed and wall surrounding Car park area to North West of Building and all ancillary site works associated with the development on site

Doolin Tld , Doolin , Co Clare

141m
17661CONDITIONAL28 Aug 2017

for development which will consist of a) alterations to the development granted under parent planning ref: P13-298 to include 1. Change of use from Museum / Visitor Centre to Art Gallery / Craft Demo Area / Retail and 2. The removal of condition no. 18 from the parent planning permission. b) Extension to existing building consisting of a display window and c) Changes to fenestration of existing building to include a new door and window to the rear together with ancillary site works

Doolin Tld , Doolin , Co. Clare

172m
20729CONDITIONAL9 Oct 2020

the development will consist of a) the alteration of site boundaries as granted under planning ref. P13/298 and b) the installation of a proprietary wastewater treatment system, reed bed and polishing filter together with ancillary site works

Doolin Tld , Doolin , Co Clare

212m
20878CONDITIONAL23 Nov 2020

to build an extension onto the existing hostel and all associated site and ancillary works

Aille River Hostel , Doolin , Co Clare

213m
20414CONDITIONAL23 Jun 2020

to build two detached log cabins for the purpose of providing holistic therapies within the curtilage of Aille River Hostel and all associated site and ancillary works

Aille River Hostel , Doolin , Co Clare

284m
25244CONDITIONAL23 Jul 2025

to build a new house, install a waste water treatment system and all associated and ancillary site works

Doolin Tld. , Doolin , Co. Clare

296m
2460251N/A29 May 2024

to revise planning Ref No P22/283 and to retain 2No ground floor apartments

Fitzs Cross , Doolin , Co Clare

296m
2460349REFUSED29 Jul 2024

to revise planning Ref No P22/283 to include 2 No ground floor apartments

Fitzs Cross , Doolin , Co Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?