The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

26187

CONDITIONAL

Clare - Clare County Council

Proposed Development

for development, the development will consist of a mural on the existing external gable end of the property facing the main street

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Jul 2026

  2. Decision: CONDITIONAL

    13 Aug 2026

  3. Decision due (upcoming)

    2 Sept 2026

Application Details

Location
Boland's Corner , Doonbeg , Co Clare V15 RH58
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council

Timeline

Registration Date
9 July 2026
Status
DECISION MADE
Decision
CONDITIONAL
Decision Date
13 August 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

41m
25393CONDITIONAL16 Dec 2025

to renovate and extend the existing building, for use as a two bedroomed long term rental unit, connect to public sewerage & all associated site and ancillary works. This application is in lieu of permission granted under reference P25/212

Main Street , Doonbeg , Co. Clare V15 Y592

42m
25212CONDITIONAL27 Jun 2025

to renovate and extend the existing building, for use as a two bedroomed short term rental unit, connect to public sewerage and all associated and ancillary site works

Main Street , Doonbeg , Co. Clare V15 Y952

43m
23496REFUSED18 Sept 2023

to develop a glamping facility with the provision of onsite parking, decommissioning of existing septic tank, connection to public sewer and the change of use of the existing cafeteria to administration greeting and meeting facility confined to patrons of the proposed glamping site to include all necessary ancillary services

Doonbeg Village , Doonbeg , Co Clare V15 Y952

67m
17559CONDITIONAL20 Jul 2017

to carry out alterations to existing cottage including alterations to the windows and doors on the front elevation and increasing the ridge height of the cottage and the construction of an extension to the rear of this cottage together with connection to public services and ancillary works

Main Street , Doonbeg , Co. Clare

181m
2360529CONDITIONAL6 Dec 2023

for subdivisions of existing derelict townhouse into two townhouses, construct extensions to both townhouses, demolition of an existing roadside structure, construction of a first floor apartment & access to rear parking, development of parking spaces along with all associated site works

Main Street , Doonbeg , Co. Clare.

224m
2560605CONDITIONAL2 Oct 2025

of a coffee trailer and seating area along with associated site works and services

Main Street , Doonbeg , Co. Clare

224m
2460540CONDITIONAL31 Oct 2024

for the installation of an ATM machine to the front elevation of the existing shop premises

Main Street , Doonbeg , Co. Clare

345m
2560470N/A31 Jul 2025

for the construction of 16 short term accommodation units with reserved open space, car and bicycle parking, access roads, footpaths, connections to public sewer and stormwater, public lighting and all ancillary services along with all associated site works

Doonbeg Village , Doonbeg , Co. Clare

368m
2660088N/A19 Feb 2026

for the construction of 16 short term accommodation units with reserved open space, car and bicycle parking, access roads, footpaths, new entrance, connections to public sewer and stormwater, public lighting and all ancillary services along with all associated site works

Doonbeg Village , Doonbeg , Co. Clare

374m
2560473REFUSED31 Jul 2025

for the construction of 24 dwelling houses with reserved open space, car and bicycle parking, access roads, footpaths, boundaries, hard and soft landscaped areas, connections to public sewer and stormwater, public lighting and all ancillary services along with all associated site works

Doonbeg Village , Doonbeg , Co. Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?