2626
N/AOffaly - Offaly County Council
Proposed Development
(A) AS BUILT RAFT FOUNDATION FOR PROPOSED RESIDENTIAL UNIT AND (B) PLANNING PERMISSION TO ERECT STEEL FRAMED RESIDENTIAL UNIT ON EXISTING RAFT FOUNDATION, INSTALL EFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER ALL ANCILLARY SITE WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
18 Mar 2026
Further information requested
12 May 2026
Application Details
- Location
- THE WALK , KINNITTY , CO.OFFALY
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Offaly County Council
- Site Area
- 0.771 ha
- Floor Area
- 65 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 18 March 2026
- Status
- FURTHER INFORMATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
DEVELOPMENT CONSISTING OF THE ALTERATION AND MATERIAL CHANGE OF USE OF EXISTING COACH HOUSE AND STABLE OUTBUILDINGS TO THE REAR OF KINNITTY CASTLE HOTEL, TO A PROPOSED CRAFT DISTILLERY AND VISITOR CENTRE. THE ALTERED BUILDINGS WILL CONTAIN SPACE FOR THE FOLLOWING: DISTILLERY PROCESS, BOTTLING, STORAGE, RETAIL AREA, TASTING AREA AND BAR, CRAFT WORKSHOPS, ANCILLARY STAFF AREAS AND TOILETS. THE WORKS WILL INCLUDE REPAIRS AND ALTERATIONS TO THE EXISTING BUILDINGS AND SITE DEVELOPMENT WORKS INCLUDING NEW COURTYARD SCREEN WALL, LANDSCAPING TO COURTYARD, FOUL AND SURFACE WATER DRAINAGE. THE PROPOSED DEVELOPMENT IS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE.
KINNITY CASTLE HOTEL , CASTLETOWN KINNITY , BIRR CO OFFALY
DEVELOPMENT THAT WILL CONSIST OF THE ALTERATION AND MATERIAL CHANGE OF USE OF EXISTING COACH HOUSE AND STABLE OUTBUILDINGS TO THE REAR OF KINNITTY CASTLE HOTEL, TO A PROPOSED CRAFT DISTILLERY AND VISITOR CENTRE. THE ALTERED BUILDINGS WILL CONTAIN SPACE FOR THE FOLLOWING: DISTILLERY PROCESS, BOTTLING, STORAGE, RETAIL AREA, TASTING AREA AND BAR, CRAFT WORKSHOPS, ANCILLARY STAFF AREAS AND TOILETS. THE WORKS WILL INCLUDE REPAIRS AND ALTERATIONS TO THE EXISTING BUILDINGS AND SITE DEVELOPMENT WORKS INCLUDING NEW COURTYARD SCREEN WALL, LANDSCAPING TO COURTYARD, FOUL AND SURFACE WATER DRAINAGE. THE PROPOSED DEVELOPMENT CONSISTS OF WORK TO A PROTECTED STRUCTURE
KINNITTY CASTLE HOTEL , CASTLETOWN KINNITTY , BIRR CO. OFFALY
an existing mobile home, storage shed and temporary septic tank. Permission is also being sought for a new dwelling house, domestic garage, treatment system and percolation area, removal of existing mobile home, demolition of existing storage shed and decommissioning of temporary septic tank and all associated siteworks
The Walk , Kinnitty , Birr Co Offaly
an existing mobile home, storage shed and temporary septic tank. Permission is also being sought for a new dwelling house, domestic garage, treatment system and percolation area, removal of existing mobile home, demolition of existing storage shed and decommissioning of temporary septic tank and all associated siteworks. It should be noted that the applicant intends to reside in the temporary mobile home on site and use the temporary septic tank on site until the permanent house is constructed. The removal of the mobile home and temporary septic tank will take place after the proposed house has been completed
The Walk , Kinnitty , Birr Co Offaly
Permission for a new dwelling house, domestic garage, treatment system and percolation area and all associated siteworks at The Walk, Kinnitty, Birr, Co. Offaly.
The Walk , Kinnitty , Birr Co Offaly
a new dwelling house, domestic garage, treatment system and percolation area and all associated siteworks
The Walk , Kinnitty , Birr Co Offaly
CONSTRUCTION OF A 30M HIGH MULTI-USER LATTICE TELECOMMUNICATIONS STRUCTURE, CARRYING ANTENNA AND DISHES ENCLOSED WITHIN A 2.4M HIGH PALISADE FENCE COMPOUND INCLUDING NEW ACCESS TRACK TOGETHER WITH ASSOCIATED GROUND EQUIPMENT AND ASSOCIATED SITE WORKS
KINNITY GAA CLUB , CASTLETOWN AND GLINSK TD , KINNITY CO OFFALY
a slatted cubicle shed with slurry tank, revisions to existing farm access road to accommodate new building, new slurry tank in existing bedded livestock shed, concrete yards and ancillary works
Moneyguyneen , Kinnitty , Birr
(1) CONSTRUCTION OF A NEW FARM BUILDING TO CONTAIN MILKING PARLOUR, DAIRY, ANCILLARY ROOMS, SLATTED AREAS OVER UNDERGROUND EFFLUENT STORAGE TANKS, DRAFTING & HANDLING FACILITIES, (2) ERECTION OF EXTERNAL MILK SILO & WASH BUILDING (3) ERECTION OF EXTERNAL MEAL BIN, (4) CONSTRUCTION OF UNCOVERED LIVESTOCK CUBICLES AREA, (5) CONSTRUCTION OF NEW FARM ROAD; (6) ALL COMPLETED WITH ASSOCIATED SITE WORKS AND FOR THE PURPOSES OF AGRICULTURE ON FARM LANDS
MONEYGUYNEEN KINNITTY , BIRR , CO. OFFALY
A NEW DWELLING HOUSE, NEW SITE ENTRANCE, SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
THE WALK , KINNITTY BIRR , CO. OFFALY
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?