The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

262

N/A

Limerick - Limerick County Council

Proposed Development

the reinstatement and refurbishment of the ground floor, first floor, external and internal walls, and roofs of the existing courtyard buildings to the rear of the dwelling to provide storage and bedroom accommodation for short term letting (12 bedrooms); the construction of a new two-storey Tech Hub building including swimming pool to the west of the existing courtyard buildings; the installation of a new advanced tertiary wastewater treatment system and rainwater retention system; the installation of a 50kW ground-mounted solar system; the provision of car-parking facilities; and all associated site development works. Heathfield House is a Protected Structure (R.P.S. Ref. No. 50)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Jan 2026

  2. Further information requested

    27 Feb 2026

  3. Further information received

    12 Aug 2026

  4. Decision due (upcoming)

    8 Sept 2026

Application Details

Location
Heathfield House , Ballinruane , Kilmeedy Co. Limerick.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council

Timeline

Registration Date
7 January 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
8 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

177m
2679CONDITIONAL27 Mar 2026

refurbishing and restoring existing vacant & derelict gate lodge dwelling, including energy up grades and the construction of a single storey extension to the rear of same. Provision of a new tertiary treatment system, infiltration / treatment area and associated site development works. Heathfield House is a Protected Structure (R.P.S. Ref. No. 50)

Heathfield House , Ballinruane , Kilmeedy Co. Limerick

340m
1770CONDITIONAL30 Jan 2017

construction of calving/calf house

Ballinruane , Kilmeedy , Co Limerick

357m
171100CONDITIONAL27 Nov 2017

construction of a dwelling house, detached domestic garage, septic tank & percolation area, entrance and all associated site works

Heathfield , Ballinruane , Kilmeedy Co. Limerick.

361m
181222CONDITIONAL14 Dec 2018

change of site boundaries and site layout from that previously granted under ref. 17/1100 for construction of a dwelling house, detached domestic garage, wastewater treatment system & percolation area and all associated site works

Heathfield , Ballinruane , Kilmeedy Co. Limerick.

434m
211727CONDITIONAL13 Dec 2021

construction of a cubicle house with slatted tank and associated site works

Ballinruane , Kilmeedy , Co Limerick

444m
2260007CONDITIONAL20 Dec 2022

Permission to construct Milking parlour building with Water storage tank, meal bin, Milk silo ,office ,storage and yard and all associated site works

Ballinruane , Kilmeedy , Co. Limerick

539m
22921CONDITIONAL24 Aug 2022

a cattle underpass and all associated site works

Ballinruane , Kilmeedy , Co. Limerick.

615m
19790CONDITIONAL9 Aug 2019

demolition of existing derelict cottage and construction of a replacement dwelling house, detached garage, site entrance, waste water treatment system, percolation area and all associated site works

Ballinruane , Kilmeedy , Co. Limerick.

721m
2360337CONDITIONAL19 May 2023

the demolition of existing rear extension, construction of a new rear extension to existing dwelling house, decommissioning of existing septic tank system and installation of a new replacement septic tank and percolation area and all ancillary site works

Ballinruane , Kilmeedy , Co. Limerick

721m
2461248CONDITIONAL12 Dec 2024

demolition of existing rear extension, construction of a new rear extension to existing dwelling house, decommissioning of existing septic tank system and installation of a new replacement septic tank and percolation area and all ancillary site works

Ballinruane , Kilmeedy , Co. Limerick

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?