2643

UNCONDITIONAL

Galway - Galway County Council

Proposed Development

for (1) change of use of hostel to a guest house including internal alterations (2) Side extension to café, (3) New Pedestrian entrance (4) New on-site sewage treatment system, polishing filter (5) and all associated site works, original planning ref no. 58670 (A Natura Impact Assessment (NIS) was submitted with the application)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Mar 2026

  2. Decision: UNCONDITIONAL

    23 Apr 2026

  3. Decision due

    27 Apr 2026

Application Details

Location
Baile Thair Inis Oirr ,
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Galway County Council
Site Area
0.16 ha

Timeline

Registration Date
3 March 2026
Status
APPLICATION FINALISED
Decision
UNCONDITIONAL
Decision Date
23 April 2026
Permission Expires
22 April 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
201858CONDITIONAL7 Dec 2020

for (1) change of use of hostel to a guest house including internal alterations (2) Side extension to café, (3) New Pedestrian entrance (4) New on-site sewage treatment system, polishing filter (5) and all associated site works, original planning ref no. 58670. A Natura Impact Assessment (NIS) is been submitted with this application. Gross floor space of proposed works: 42.6 sqm

Baile Thair Inis Oirr ,

10m
181277REFUSED7 Sept 2018

chun Teach Cónaithe a leagan, agus Teach Cónaithe nua le garáiste a thógáil in áit, agus ag iarradh Cead Pleanála chun Athrú Usáide a dhéanamh ar chuid de fhoirgneamh an Bhrú go usáid mar Caife agus Cead Pleanála chun síneadh a thógáíl air, agus Córas Séarachais nua. Spás urláir comhlán na n-oibreacha beartaithe, 385sqm agus Spás urláir comhlán d'aon scartáil, 180sqm.

Baile Thiar Inis Oirr ,

10m
19266REFUSED27 Feb 2019

chun teach cónaithe a leagan, agus teach cónaithe nua le garáiste a thógáil ina áit, agus ag iarradh cead pleanála chun athrú usáide a dhéanamh ar chuid de fhoirgneamh an bhrú go usáid mar caife agus cead pleanála chun síneadh athógáil air, agus córas séarachais nua a thógáil. Ta iarraid cead pleanála chomh maith, chun teach mhuintire a cheangal leis an gcóras séarachais seo. Spás urláir comhlán na n-oibreacha beartaithe: Teach - 260 sqm, Garaiste - 46 sqm, Caife - 140 sqm

Baile Thiar Inis Oirr ,

30m
211601CONDITIONAL2 Sept 2021

to demolish existing dwelling house and construct a new house in its place and all ancillary works. A Natural Impact Assessment (N.I.S.) is being submitted with this application. Gross floor space of proposed works: 202.24 sqm. gross floor space of any demolition: 126.9 sqm

Baile Thair Inis Oirr ,

47m
2360910CONDITIONAL4 Aug 2023

for the construction of a domestic garage with all ancillary works to service dwellinghouse granted under pl. ref. 21/1601

Baile Thair Inis Oirr , Co. Galway

67m
2560939CONDITIONAL11 Jul 2025

chun teach cónaithe nua, garáiste agus córas séarachais a thogaíl. Spás urláir comhlán na n-oibreacha beartaithe: 110 sqm(H), 45.00 sqm(G)

Inis Oirr , An Baile Thiar Oileáin Árann , Co. na Gaillimhe

160m
2661152N/A8 Jul 2026

chun Seomra Ceardaíochta a Choinneáil

Inis Oírr , An Baile Thiar , Oileáin Árann

254m
171542UNCONDITIONAL25 Oct 2017

for minor modifications to existing planning permission (planning reg. ref. no. 11/168) to include the following: (a) relocation of proposed percolation area to adjoining land for proposed new Bison wastewater treatment plant and associated site development works (b) relocation of proposed new soak hole / rain water harvesting system to adjoining land. Previous Planning Reference No. 12/1549.

Inisheer ,

265m
212420CONDITIONAL20 Dec 2021

for elevation of existing restaurant building, and permission is sought for change of use of existing restaurant building to domestic dwelling and for the installation of new rooflights including all associated services. Gross floor space of proposed works: Gross floor space of work to be retained : n/a. Gross floor space of proposed works: n/a

Inis Oírr ,

271m
19445CONDITIONAL28 Mar 2019

do mheadú ar an sráid ar aghaidh ár detach cónaithe, agus an stór atá faoi bhun. Beidh an sráid á usáid mar áit suite ag chustaiméirí a bheas ag úsáid an bíalann/caife atá sa teach. Spás urláir comhlán na hoibre atá le coinneáil: 55 sqm

Inis Oírr ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?