264
N/ASligo - Sligo County Council
Proposed Development
The Painting of a decorative mural on the exterior front facade of the existing commercial business property.
View the full application file on the council's planning portal →Application Details
- Location
- Sligo Physiospace , Ballast Quay , Sligo F91XYV9
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
Timeline
- Registration Date
- 12 June 2026
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for retention of development consisting of one freestanding Totem sign
Jones Oil , Finisklin Road , Sligo
development consisting of the following (1) to retain 4 no. 5m High Canopy Legs, (2) Retain location of 4 no. forecourt pumps (3no. 4 Hose & 1 no. 6 Hose), (3) remove 2no. Pumps, (4) remove 2no. Shipping containers ancillary to existing car wash, (5) remove two-storey portacabin (2no. x 36m2) in use as temporary seating and offices sited against the south boundary fence, (6) remove 2no. 50,000L overground tanks (Kerosene & Diesel) and 1no. 40,000L overground tank (MGO) and bunding, (7) retain the change of use of the existing building (89.20m2) from light commercial to retail and café, (8) construct first floor (89.20m2) over existing shop to provide ancillary offices and construct 2 storey extension (181.80m2) to provide café and extra seating (9) retail to include off-licence for sale of intoxicating liquor, (10) proposed 4 no. 90,000L underground fuel tanks (2 no. Diesel tanks, 1 no, Kerosene tank and 1 no. Marked Gas Oil Tank), (11) proposed new 24m x 15m canopy at a height of 6m on existing canopy legs, (12) proposed 2no. fuel pumps (1no. 4 hose and 1 no. 6 hose), (13) proposed lighting to canopy and forecourt (14) proposed 6m tall Totem Sign, (15) proposed air, water and vacum service machine, (16) proposed vapour vent pipes on the east boundary, (17) proposed car wash, (18) car parking to facilitate the development, (19) all associated signage to the building and canopy and (20) all ancillary site works
LMS Express , Finisklin Road , Rathedmond Td.
1) Retain construction of one & two storey 350 sqm extension to existing retail shop. The extension includes an increase to the retail shop floor area, which includes a hot food Deli counter & off-licence for sale of intoxicating liquor, ancillary Cafe seating, storage and staff office areas, 2) retain 24Hr Fuel Pump, 3) retain change to site boundary on south side of site, 4) erect associated signage to the new building, and 5) complete all ancillary site works
LMS Express Finisklin Road , , Co. Sligo
development consisting of the construction of single storey extension to front of existing dwelling house with associated works.
164 River Road , Cartron , Sligo
the construction of a mixed-use multi-storey building with basement car park and central landscaped courtyard as follows. Basement level; Car parking, storage and service facilities with vehicular access onto Pirnmill Road. Ground floor level; 3 commercial units, 5 own door 2 storey residential units to Ballast Quay, 2 own door residential units on Pirnmill Road, 3 own door 2 storey residential units opening on to the central courtyard, 2 entrance stair & lift cores to the apartments with a central landscaped courtyard with access from Pirnmill Road. First floor level; upper floor level of own door residential units, 2 own door apartments on Pirnmill Road, & common allotment area over entrance to car park. Second Floor Level; 4 x 3-bedroom apartments, 5 x 2-bedroom apartments. Third Floor Level; 4 x 3-bedroom apartments, 5 x 2-bedroom apartments. Fourth Floor Level; 4 x 3-bedroom apartments, 5 x 2-bedroom apartments. Fifth Floor Level; 2 x 3-bedroom apartments, 1 x 2-bedroom apartments. Sixth Floor Level; 1 x 3-bedroom apartments & 1 x 2-bedroom apartments. Seventh Floor Level; 1 x 3-bedroom apartment. To include service routes with connection to all existing services and all associated site development works.
Pirnmill Road Ballast Quay & Michael Conlon Road Sligo Town Co. Sligo ,
development consisting of the change of use of 0.14ha from yard area to surface car parking, the retention of use as surface car parking of 0.13ha, alterations to existing boundary treatments and associated site works at the production facility
Finisklin Road , Finisklin , Sligo
to extend existing ground floor garage conversion forward to front wall of house and construct a first floor extension above garage conversion to side of two storey house
219 River Road , Cartron , Sligo
development consisting of the following: a) alterations to existing chemical store building, b) all service connections and associated site works
Finisklin Road , Finisklin , Co Sligo
development consisting of the construction of single storey extension to front and side of existing dwelling house with associated works
92 Seafield Avenue , Cartron , Sligo
development consisting of the retention of a single storey extension to the existing Bruss facility measuring 765 sq.m and associated site works (this application relates to development which is for the purpose of an activity not required to be within the scope of G. Bruss's existing Integrated Prevention Pollution Control licence (IPPC) for the site)
Finisklin Road , Finisklin , Sligo
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.