2660086

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

RED III, A 10-year planning permission for a solar energy development with a total site area of 15.9 hectares comprising (i) photovoltaic solar panels on mounting frames; (ii) electrical transformer stations; (iii) underground electrical and communications cabling; (iv) upgraded and new on-site access tracks; (v) security fencing and gates; (vi) pole-mounted security cameras; and (vii) all associated and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. The planning application is accompanied by an Appropriate Assessment Screening Report

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Feb 2026

  2. Decision: CONDITIONAL

    8 May 2026

  3. Decision due

    13 May 2026

  4. Grant issued

    11 Jun 2026

Application Details

Location
Powerstown Demesne and Burgagery Lands-East , Clonmel , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
15.9 ha

Timeline

Registration Date
5 February 2026
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 May 2026
Grant Date
11 June 2026
Permission Expires
10 June 2036

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560849N/A29 Aug 2025

RED III application for a 10-year planning permission for a solar energy development with a total site area of 15.9 hectares comprising (i) photovoltaic solar panels on mounting frames; (ii) electrical transformer stations; (iii) underground electrical and communications cabling; (iv) upgraded and new on-site access tracks; (v) security fencing and gates; (vi) pole-mounted security cameras; and (vii) all associated and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. The planning application is accompanied by an Appropriate Assessment Screening report

Powerstown Demesne and Burgagery Lands-East , Clonmel , Co. Tipperary

0m
2561180N/A19 Nov 2025

REDIII 10-year planning permission for a solar energy development with a total site area of 15.9 hectares comprising (i) photovoltaic solar panels on mounting frames; (ii) electrical transformer stations; (iii) underground electrical and communications cabling; (iv) upgraded and new on-site access tracks; (v) security fencing and gates; (vi) pole-mounted security cameras; and (vii) all associated and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. The planning application is accompanied by an Appropriate Assessment Screening Report.

Powerstown Demesne and Burgagery Lands-East , Clonmel , Co. Tipperary

77m
2561159N/A14 Nov 2025

a 10-year planning permission for a solar energy development with a total site area of 15.9 hectares comprising (i) photovoltaic solar panels on mounting frames; (ii) electrical transformer stations; (iii) underground electrical and communications cabling; (iv) upgraded and new on-site access tracks; (v) security fencing and gates; (vi) pole-mounted security cameras; and (vii) all associated and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. The planning application is accompanied by an Appropriate Assessment Screening Report

Powerstown Demesne and Burgagery Lands-East , Clonmel , Co. Tipperary

508m
17601061N/A27 Sept 2017

3 no. horse stables and tack room and for Planning Permission for change of use of stables for use as domestic house stores

Powerstown , Clonmel , Co. Tipperary

553m
17601119N/A12 Oct 2017

3 no. horse stables and tack room and for Planning Permission for change of use of stables for use as domestic house stores

Powerstown Demesne , Clonmel , Co. Tipperary

568m
17601062N/A27 Sept 2017

conservatory as constructed to my bungalow residence

Powerstown , Clonmel , Co. Tipperary

570m
17601138CONDITIONAL17 Oct 2017

conservatory as constructed to my bungalow residence

Powerstown Demesne , Clonmel , Co. Tipperary

630m
2560379CONDITIONAL2 May 2025

the construction of two above ground water reservoirs, a new well, and all associated site development works

Clonmel Racecourse Powerstown Park , Powerstown Clonmel , Co. Tipperary

690m
2460001CONDITIONAL2 Jan 2024

the construction of a new single-storey warehouse incorporating 2 no. dock levellers with canopy over, underground storm attenuation system and all associated site works

Powerstown , Clonmel , Co. Tipperary

690m
2460291CONDITIONAL19 Apr 2024

the alterations to previously granted permission (PD. Ref: 2460001), for increase in height of 2.5m to warehouse building as granted, together with all associated site development works

Glenpatrick Spring Water Ltd. , Powerstown , Clonmel Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?