The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2660099

N/A

Sligo - Sligo County Council

Proposed Development

Planning Permission to construct a new slatted shed and silage base together with all ancillary site works and services.

View the full application file on the council's planning portal →

Application Details

Location
Gortygara , Gurteen , Co.Sligo.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
1.198 ha

Timeline

Registration Date
11 March 2026
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2660175CONDITIONAL7 May 2026

Construct a new slatted shed and silage base together with all ancillary site works and services.

Gortygara , Gurteen , Co.Sligo.

405m
20286CONDITIONAL24 Aug 2020

Development consisting of; (a) demolition of existing derelict dwelling house; (b) construction of a proposed dwelling house, garage septic tank system and percolation area, complete with all associated works

Gortygara , Gurteen , Co Sligo

538m
19365CONDITIONAL5 Sept 2019

Development consisting of the construction of a dwelling house, garage, proprietary effluent treatment unit and soil polishing filter on site, together with all ancillary site works and services.

Gortygara , Gurteen , Co Sligo

1.1km
2460313CONDITIONAL19 Sept 2024

(1) a new effluent treatment system and percolation area (2) to retain revised site boundaries (3) to retain existing garage (4) to retain existing domestic shed (5) to retain existing windows in gables of existing house (6) and all associated site works

Kilshalvy , Gurteen , County Sligo

1.2km
2360179CONDITIONAL16 Jul 2023

1. An extension to the rear of an existing cottage. 2. A new front porch. 3. A new sewage treatment plant with raised tricel puraflo modules and a distribution area. 4. Minor alterations to existing cottage. 5. And all ancillary site works at this site

Cuilmore , Gurteen , Co. Sligo

1.4km
2560256CONDITIONAL20 Jun 2025

Construction of a new bungalow type dwelling. Construction of a new wastewater treatment plant and percolation area in accordance with EPA Code of Practice. Construction of a new vehicular entrance and access road to serve dwelling. All associated site development works

Riverstown , Gurteen , Co. Sligo

1.5km
19411CONDITIONAL1 Oct 2019

for development consisting of 1. Retention of window opening on existing dwelling house. 2. Planning Permission for retention of existing percolation area as constructed. 3. Planning Permission to install a proprietary effluent treatment system and ancillary site development works

Riverstown Td , Gurteen , Co. Sligo

1.5km
2560540CONDITIONAL19 Dec 2025

Retain a 124 Sqm dormer domestic garage, inclusive of ground floor storage and glazed potting room, and first floor art studio/ home office/ guest accommodation, and balcony area, together with all associated site works, landscaping and services connections

Birch Lane Cottage , Cuillmore Gurteen , Co. Sligo

1.5km
17297CONDITIONAL1 Aug 2017

for development consisting of (a) demolition of existing dwelling house and outbuilding on site, (b) construction of a dwelling house, garage, proprietary effluent treatment unit and soil polishing filter on site, together with all ancillary site works and services

Mountirvine , Gurteen , Co. Sligo

1.6km
21388N/A28 Sept 2021

Development consisting of (1) The demolition of a single storey side extension (2) The construction of a front and side single storey extension (3) Alterations to the roof design of the existing dwelling house with all associated site works

Cuilmore , Gurteen , Co. Sligo

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?