The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2660111

N/A

Tipperary - Tipperary County Council

Proposed Development

a new car park with electric vehicle (EV) charging points, a new vehicular entrance off James Street, associated drainage and all associated site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Feb 2026

  2. Application withdrawn

    1 Apr 2026

  3. Decision due

    8 Apr 2026

Application Details

Location
An Post Tipperary , James Street , Tipperary Town Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.359 ha

Timeline

Registration Date
12 February 2026
Status
WITHDRAWN
Decision
N/A
Decision Due
8 April 2026
Withdrawn
1 April 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2660308CONDITIONAL10 Apr 2026

a new car park with electric vehicle ( EV ) charging points: a new vehicular entrance off James Street associated drainage and all associated site development works

An Post Tipperary , James Street Tipperary Town , Co. Tipperary

48m
2560543N/A13 Jun 2025

change of use from offices to residential of the ground floor

19 Davis Street , Tipperary Town , Co. Tipperary

52m
2488CONDITIONAL16 Apr 2024

the change of use from barber shop to dwelling house and all associated site and ancillary works

20 Davis Street , Tipperary Town , Co. Tipperary

53m
2560610CONDITIONAL26 Jun 2025

change of use from offices to residential of the ground floor, the works are within the curtilage of a protected structure

19 Davis Street , Tipperary Town , Co. Tipperary

67m
20481CONDITIONAL19 May 2020

change of use of the ground floor from retail to office accommodation and change of use of the first floor from retail to an apartment, all associated structural alterations and site works as may be required

13/14 Davis Street , Tipperary Town , Co. Tipperary

75m
20437N/A6 May 2020

change of use of the ground floor from retail to office accommodation and change of use of the first floor from retail to an apartment, all associated structural alterations and site works as may be required

13/14 Davis Street , Tipperary Town

84m
17600685CONDITIONAL16 Jun 2017

roof light on rear roof slope of original house; two storey extension to rear of original house;single storey extension to rear of two storey extension, boiler house to rear of single storey extension; sheds at rear of site; metal gate in lieu of hardwood gate at entrance to rear yard from public car park and all ancillary works

6 James Street , Tipperary Town , Co.Tipperary

88m
2360660CONDITIONAL24 Aug 2023

(1) The relocation of existing Vehicular and Pedestrian Entrances on Bohercrow Road with new associated Car Park and ancillary siteworks. (2) A New Road Safety Authority Driving Test Centre located within the existing Government Offices Building with new external entrance, ramp and steps

Government Offices , Davis Street , Tipperary

100m
2360339CONDITIONAL19 May 2023

change of use from retail to art gallery and all associated works

No 6/7 Davis Street , Tipperary Town , Co. Tipperary

116m
2185N/A28 Jan 2021

(1) demolition of the existing two storey rear extension and part of the rear external wall, internal walls, floors and columns including chimney breast and chimney - chimney to be reinstated above roof to original state, (2) change of use from light industry assembly unit of ground floor to commercial unit, change of use of first and second floor from light industrial assembly to residential, (3) refurbishment of existing sash windows and doors to match existing to east and south elevations, (4) new extension to rear to consist of communal bin storage, bike storage and communal storage to ground, first and second floor, (5) signage to east and south elevations (6) alterations to ground floor windows and fenestration of east and south elevations at ground floor level and (7) all associated site works (protected structure RPS ref. 47)

Glove Factory , James Street , Tipperary Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?